IR 05000352/2009007

From kanterella
Jump to navigation Jump to search

Download: ML100350793

Text

UNITED NUCLEAR REGULATORY REGION 475 ALLENDALE KING OF PRUSSIA, PENNSYLVANIA February 4, 2010 EA-09-183 Mr. Charles Senior Vice President, Exelon Generation Company LLC President and Chief Nuclear Officer. Exelon Nuclear 4300 Winfield Rd. Warrenville, IL 60555 LIMERICK RESPONSE TO NOTICE OF NRC INVESTIGATION REPORT NO. 1-2009-012 AND NRC INSPECTION REPORTS NOS. 05000352/2009007 AND 05000353/2009007

Dear Mr. Pardee:

Thank you for your letters of January 15, 2010 (ML 100341201) and January 27,2010 (ML 100341223), in response to our December 16,2009. letter and Notice of Violation regarding the willful violation, by a lead maintenance technician. to allow unqualified personnel to perform clearance and tagging work and then falsifying the related records (ML093500674). We will review your reply and the implementation of your corrective actions during a future inspection to determine that full compliance has been achieved and will be maintained. In accordance with Title 10 of the Code of Federal Regulations, Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web Site at http://www.nrc.gov/reading-rmladams.html(the Public Electronic Reading Room).

Sincerely,Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Docket Nos.: 50-352,50-353 License Nos.: NPF-39, NPF-85 cc: Distribution via ListServ EA-09-183 Mr. Charles Senior Vice President, Exelon Generation Company LLC President and Chief Nuclear Officer, Exelon Nuclear 4300 Winfield Rd. Warrenville, IL 60555 LIMERICK RESPONSE TO NOTICE OF VIOLATION NRC INVESTIGATION REPORT NO. 1-2009-012 AND NRC INSPECTION REPORTS NOS. 05000352/2009007 AND 05000353/2009007

Dear Mr. Pardee:

Thank you for your letters of January 15, 2010 (ML 100341201) and January 27,2010 (ML 100341223). in response to our December 16,2009, letter and Notice of Violation regarding the willful violation, by a lead maintenance technician, to allow unqualified personnel to perform clearance and tagging work and then falSifying the related records (ML093500674). We will review your reply and the implementation of your corrective actiQns during a future inspection to determine that full compliance has been achieved and will be maintained. In accordance with Title 10 of the Code of Federal Regulations. Part 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's document system (ADAMS). ADAMS is accessible from the NRC Web Site at http://www.nrc.govlreading-rm/adams.html(the Public Electronic: Reading Room).

Sincerely,IRA! Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Distribution w/enel: S. Collins, (R10RAMAll Resource) M. Dapas, (R10RAMAIL Resource) I D. Lew, (R1DRPMAIL Resource) I' J. Clifford, (R1DRPMAIL Resource) D. Roberts, DRS (R1DRSMail Resource) P. Wilson, (R1DRSMaii Resource) P. Krohn, DRP R. Fuhrmeister, DRP A. Rosebrook, DRP E. Torres, DRP J. Bream, DRP E. DiPaolo, DRP, SRI N. Sial/ert DRP, Rl L Pinkham, Resident OA L. Troelne, RI, OEDO RidsNrrDorlLpl1-2 Resource RidsNrrPMLimerick Resource ROPreportsResouree@nrc.gov PKrohnl PGK 02/04/10 OFFICIAL RECORD COpy