IR 05000348/2014404
| ML14251A376 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 09/08/2014 |
| From: | Binoy Desai NRC/RGN-II/DRS/PSB2 |
| To: | Gayheart C Southern Nuclear Operating Co |
| Linda K. Gruhler 404-997-4633 | |
| References | |
| IR 14-404 | |
| Download: ML14251A376 (3) | |
Text
September 8, 2014
SUBJECT:
JOSEPH M. FARLEY NUCLEAR PLANT - U.S. NUCLEAR REGULATORY
COMMISSION PHYSICAL SECURITY INSPECTION REPORT 05000348/2014404
AND 05000364/2014404
Dear Ms. Gayheart:
On August 28, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Joseph M. Farley Nuclear Plant. The NRC inspectors discussed the results of this inspection with you and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings were identified during this inspection.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public inspections, exemptions, requests for withholding, of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herein contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the Enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRCs ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Binoy B. Desai, Chief Plant Support Branch 2 Division of Reactor Safety
Docket Nos. 50-348 and 50-364 License Nos. NPF-2 and NPF-8
Enclosure:
Inspection Report 05000348/2014404 and 05000364/2014404, w/Attachment:
Supplementary Info (OUO)
cc: (See page 3)
ML14251A376 SUNSI REVIEW COMPLETE FORM 665 ATTACHED
OFFICE RII:DRS/PSB2 RII:DRP/BR2 RII:DRS/PSB2
SIGNATURE ICH MEF1 BBD
NAME I. Hall M. Franke B. Desai
DATE 9/ 4 /2014 9/ 4 /2014 9/ 8 /2014
E-MAIL COPY YES NO YES NO YES NO