Advises That Referral in 801031 Cover Ltr to IE Insp Repts 50-348/50-34 & 50-364/50-40 Should Be Corrected to 50-348/80-34 & 50-364/80-40
ML20002B268
Person / Time
Site: Farley  
Issue date: 11/18/1980
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20002B269 List:
References
NUDOCS 8012110207
Download: ML20002B268 (1)


Text

-

'

.

^'

l,,

l?R(h-

,

,

,

h..

UNITED STATES CD '

$,$

,. il. -

L/

l.

NUCLEAR REGULATORY COMMISSION

[25i u

Q

.3

,Y REGION 11 5$

g@

'

101 MARIETTA ST., N.W., SUITE 3100 S

Q

/

ATLANTA, GE.ORGIA 20303

y se,,e w

en g

NOV 181980

^

In Reply Refer To:

RIDDJp

-~

50-364/80-40j)

50-348/80-34 Alabama Power Company ATTN:

R. P. McDona M Vice Presic t-Nuclear Generation P.' O. Box 2641 Birmingham, AL 35291 Gentlemen:

Please be advised that due to an administrative error the inspection report number for the inspection conducted by D. J. Perrotti of this office un October 6-10, 1980, for the Farley facility should be 50-364/80-40 and 50-348/80-34 instead of 50-348/50-34 and 50-364/50-40.

Please change existing correspondence to reflect the correct inspect 1on report number.

Should you have any questions concerning this matter, please call G. R. Jenkins (404-221-5541) of this office.

Sincerely, s

e J. Philip Stohr, Chief Fuel Facility and Materials Safety Branch cc:

W. 0. Whitt, Executive Vice President F. -L. Clayton, Jr. Senior Vice President

)

J. W. McGowan, Manager Operations Quality Assurance 0. D. Kingsley, Jr., Manager, Nuclear Engineering and Technical Services cc's cont'd on Page 2

'

8012110 9

.

_

. -.

,

,

!

si j

Alabama Power Company

- 2-H. O. Thrash, Manager Nuclear Generation W. G. Hairston, III Plant Manager

.

4 e

F-

/_ 3~

ys,9 UNITED STATES

8

'n '

NUCLEAR REGULATORY COMMISSION

'

'$

REGION 11

/J 101 MARIETTA sT., N.W., sulTE 3100 O

%*****o

.

ATLANTA, GEORGI A 30303

J.

=In Reply Refer To:

~

RII:DJP_

OCT 311980

~ 50-348/50-34-

~50-364/50-40 Alabama Power Company

ATTN: _ R. P. Mcdonald Vice President-Nuclear Generation

-

P. O. Box 2641

' Birmingham, AL 35291-Gentlemen:

This refers to the inspection conducted by D. J. Perrotti of this office on

,

October 6-10, 1980, of activities _ authorized by NRC License No. NPF-2 and Construction Permit No. CPPR-86 for the Farley facility', and to the discussion of our findings held with K..W. McCracken at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the enclosed inspection report.

Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector.

!-

Within the scope of this inspection, no items of noncompliance were disclosed.

'In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, copy of this letter and the enclosed a

.

inspection report will be placed in the NRC's Public Document Room.

If this

!

report contains any 'information that you (or yo'ur contractor) believe to be

!

proprietary, it is necessary that you make a written application within 20 days

+-

to this offic' to withhold such information from public disclosure. Any.such

!

application must include a full' statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a

'

separate part of the document. If we do not hear from you in this regard within

,

the specified period, t' e report will be placed in the Public Document Room.

,

Should you have any questions concerning this letter, we will be glad to discuss

.

them with_ you.

\\

j

Sincerely k

' -

J. Philip Stohr, Chief

.

N h

Fuel Facility and Materials

'

g Safety Branch Enclosure:

(See Page 2)

80121101h

.

.

.-

.

.

.

r 7.+.c7;-

.jr?'

~

.i

..

.

...

.

-

g

_ Alabama -Power CompanyD-2-OCT 31 1980.

Enclosure:

-

Inspection Report Nos. 50-348/50-34 and 50-364/80-40 1cc w/ encl:

W. O. Whitt, Executive'Vicc President

- F. L. Clayton, Jr.', Senior Vice President H.~0. Thrash, Manager-Nuclear Generation

0. D. Kingsley, Jr., Manager, Nuclear Engineering

.

, and Technical Services J. W. McGowan, Manager-Operations

.

. Quality Assurance W.:G. Hairston, III, Plant Manager W. ' C. Petty, -Manager-Quality Assurance (Design and Construction)

R.jE. Hollands, Jr., QA Supervisor

'

.

_