IR 05000335/1994024
| ML17228B004 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 02/02/1995 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Goldberg J Florida Power & Light Co |
| References | |
| NUDOCS 9502140006 | |
| Download: ML17228B004 (5) | |
Text
PRIORI j. Y Z REGULATORY~MPR5@IZI15%85555$3$hSTION SYSTEM ( RIDS )
5 ACCESSION NBR:9502140006 DOC.DATE: 95/02/02 NOTARIZED:
NO FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power 6 Light Co.
~
~
~
~
50-389 St. Lucie Plant, Unit 2, Florida Power 6 Light Co.
AUTH.NAME AUTHOR AFFILIATION VERRELLZ,D.M.
Region 2 (Post 820201)
RECIP.NAME RECIPIENT AFFILIATION GOLDBERG,J.H.
Florida Power a Light Co.
SUBJECT:
Ack receipt of 950113 ltr informing NRC of steps taken to correct violations noted in insp repts 50-335/94-24
50-389/94-,24.
DISTRIBUTION CODE:
IE01D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:
DOCKET N
05000335 05000389 RECIPIENT ZD CODE/NAME PD2-2 PD INTERNAL: ACRS AEOD/SPD/RAB Z~OD/~C=~
ILE CENTE~G2 NRR/DORS/OEAB NUDOCS-ABSTRACT OGC/HDS3 RNAL: LITCO BRYCE,J H
NRC PDR COPIES LTTR ENCL RECIPIENT ID CODE/NAME NORRIS'
AEOD/DEIB AEOD/SPD/RRAB DEDRO NRR/DISP/PIPB NRR/DRCH/HHFB OE DIR RGN2 FILE
NOAC COPIES LTTR ENCL
'
U N
iPOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE iVASTE!COih'TACTTHE DOCL'iiIEYTCONTROL DESK, ROOM P 1-37 (EXT. 504-20S3
) TO ELIMIYATEYOUR YAMEFROi!
DISl'RIB!."I'IOYLISTS FOR DOC!.:WIEYTS YOU DOi'T.'PEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR
ENCL
February 2,'995
'lorida Power and Light Company ATTN:
Mr. J.
H. Goldberg President
- Nuclear Division P. 0.
Box 14000 Juno Beach, FL 33408-0420 SUBJECT:
NRC Inspection Report No. 50-335/94-24 AND 50-389/94-,24 Gentlemen:
Thank you for your i.ssued on December facility.
We have requirements of 10 corrective actions response of January 13, 1995, to our Notice of Violation, 14, 1995, concerning activities conducted at your St.
Lucie evaluated you response and found that it meets the CFR 2.201.
We will examine the implementation of your during future inspections.
We appreciate your cooperation in this matter.
Sincerely, Orig signed by David M. Verrelli David M. Verrelli, Chief Reactor Projects Branch
Division of Reactor Projects Docket Nos.
50-335, 50-389 License Nos.
D. A. Sager Vice President St. Lucie Nuclear Plant P. 0.
Box 128 Ft. Pierce, FL 34954-0128 H.
N. Paduano, Manager Licensing and Special Programs Florida Power and Light Company P. 0.
Box 14000 Juno Beach, FL 33408-0420 C.
L. Burton, Plant General Manager St. Lucie Nuclear Plant P. 0.
Box 128 Ft. Pierce, FL 34954-0128 Continued see page
9502i4000b 950202 PDR ADQCK 05000335
PDR OFFICIAL COPY
Continued Robert E.
Dawson Plant Licensing Manager St.
Lucie Nuclear Plant P. 0.
Box 128 Ft. Pierce, FL 34954-0218 Harold F. Reis, Esq.
Newman 8 Holtzinger 1615 L Street, NW Washington, D.
C.
20036 John T. Butler, Esq.
Steel, Hector and Davis 4000 Southeast Financial Center Miami, FL 33131-2398 Bill Passetti Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, FL 32399-0700 Jack Shreve Public Counsel Office of the Public Counsel c/o The Florida Legislature 111 West Madison Avenue, Room 812 Tallahassee, FL 32399-1400 Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, FL 32399-2100 Thomas R. L. Kindred County Administrator St.
Lucie County 2300 Virginia Avenue Ft. Pierce, FL 34982 Charles B. Brinkman Washington Nuclear Operations ABB Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 3300 Rockville, MD 20852
l FPL Distribution:
K. Landis, RII J. Norris, NRR G. Hallstrom, RII PUBLIC NRC Resident Inspector U.S. Nuclear Regulatory Comm.
7585 South Highway AIA Jensen Beach, FL 34957-2010 SEND TO PUBLIC DOCUMENT ROOM7 YES NO OFFICE SIGNATURE NAME DATE Rll
~~ %95 RII KLsndis 1/
/95 1/
/95 1/
/95 1/
/95 OFF ICIA RECORD COPY DOCUMEIIT IIAIIEI GIiSL9424.ACK