U.S. NUCLEAR REGULATORY COMMISSION
REGION III
Report No. 50-331/87005(DRSS)
Docket No. 50-331 License No. DPR-49 Licensee:
Iowa Electric Light and Power Company P. O. Box 351 Cedar Rapids, IA 52406 Facility Name: Duane Arnold Energy Center Inspection At: Duane Arnold Energy Center, Palo, Iowa Date of Last Inspection: May 27-30, 1986 Inspection Conducted: January 26 through February 4, 1987 WA bh0h[$
'
Inspectors:
{.
h G. M. Christoffer (/
Date Physical Security Ins ()pector 0]
%L VI
J. R. Kniceley '
Date Physical Security Inspector Approved By: QL 20/97 g. R. Creed, Chief Date'
3afeguards Section Inspection Summary Inspection on January 26 through February 4,1987 (Report No. 50-331/87005(DRSS))
Areas Inspected:
Included a review of Licensee's Actions on Previously Identified Items; Information Notice No. 86-91; Security Organization; Access Control - Personnel, Packages, Vehicles; Audits; Records and Reports; Testing and Maintenance Physical Barriers - Protected and Vital Areas; Assessment Aids; Detection Aids - Protected and Vital Areas; Alarm Stations; Communications; and Protection of Safeguards Information.
The inspection began during the day shift.
Results: The licensee was found to be in compliance with NRC requirements within the areas examined during this inspection.
(DETAILS: UNCLASSIFIED )