ML19331A392
| ML19331A392 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 07/16/1973 |
| From: | Grier B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Howell S CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| Shared Package | |
| ML19331A395 | List: |
| References | |
| NUDOCS 8007160955 | |
| Download: ML19331A392 (2) | |
See also: IR 05000329/1973005
Text
UNITED STATES
j
y;
ATOMIC ENERGY COMMISSION
'
. <
h / / (*1[J
DIRECTORATE OF REGULATORY OPERATIONS
ko \\/
REGION 111
5 O'
799 ROOSEVELT ROAD
'
kj
GLEN ELLYN, ILLINOIS So137
(312) 85s-2660
,
July 16, 1973
Consumers Power Company
Docket No. 50-329
ATTN: Mr. Stephen H. Howell
Docket No. 50-330
Vice President
212 West Michigan Avenue
Jackson,Itichigan
49201
Centlemen:
This refers to the inspection conducted by Messrs. Rohrbacher and Erb of
this office on June 26 - 28, 1973, relative to the restart of construction
of the Midland Plant authorized by AEC Construction Pernits No. CPPR-81
and No. CPPR-82 and to the discussion of our findings at the conclusion
of the inspection with Messrs. Kessler, Hills, Cooke and others of your
staff.
Areas exmined during the inspection are identified in the attached report.
Within these areas, the inspection consisted of selective ex mination of
procedures and representative records, interviews with plant per sonnel,
and observations by the inspectors.
No violations of AIC requirements were identified within the areas eramined
during the inspection.
By way of this letter, we wish to confirm our understanding that you intend
to continue restoration and requalification activities based on our dis-
cussions regarding QC procedures and records,
s
The matter relative to the Bechtel Corporation quality assurance / quality
control organization structure for the Midland project remains open pending
further discussions with you or members of your staff.
A copy of our report of this inspection is enclosed. In accordance with
Section 2.790 of the AEC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations, a copy of this letter with the enclosed inspection
report will be placed in the AEC's Public Document Room.
If the inspection
report contains information which you or your contractors believe to be
proprietary, it is necessary that you submit a written application to this
office, within 20 days of the date of this letter, requesting that such
information be withheld from public disclosure. If such an application is
L
8007160 f [ 8
@
- .
.-.
-. .. . .- -- .. .
-
--
.
.
_ _ _ _ _ _ - _ _ _ _ _ _ _
,
e
Consumers Power Company
-2-
July 16, 1973
submitted, it must identify the basis for which information is claimed to
be proprietary and should be prepared so that proprietary information
identified is contained in a separate part of the document since the appli-
cation, excluding this separate part, will also be placed in the Public
Document Room. If we do not receive an application to withhold information,
or are not otherwise contacted within the specified time period, the enclosed
report will be placed in the Public Document Room with a copy of this letter.
Unless you wish to make application to withhold information, no reply to
this letter is necessary; however, should you have questions concerning
this inspection, we will be glad to discuss then with you.
Sincerely yours,
.
Boyce H. Grier
Regional Director
Enclosure:
RO Inspection Rpt No. 050-329/73-05
i
and No. 050-330/73-05
bec: RO Chief, FS&EB
RO:HQ (4)
Licensing (4)
DR Central Files
'
RO Files
Regions I & II
Local PDR
DTIE
OGC, Beth, P-506A
O
'
--
.
.
.
. .
..
-
.
- -
-