Security Baseline Inspection Report 05000327/2025402 and 05000328/2025402
ML25163A178
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 06/16/2025
From: Jannette Worosilo
NRC/RGN-II/DFRSS/NSB
To: Erb D
Tennessee Valley Authority
References
EPID I-2025-402-0025 IR 2025402
Download: ML25163A178 (1)


Text

SUBJECT:

SEQUOYAH NUCLEAR PLANT - SECURITY BASELINE INSPECTION REPORT 05000327/2025402 AND 05000328/2025402

Dear Delson C. Erb:

On June 5, 2025, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Sequoyah Nuclear Plant and discussed the results of this inspection with Kevin Michael and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Nuclear Security Branch Division of Fuels, Radiological Safety, and Security Docket Nos. 05000327 and 05000328 License Nos. DPR-77 and DPR-79

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000327 and 05000328

License Numbers:

DPR-77 and DPR-79

Report Numbers:

05000327/2025402 and 05000328/2025402

Enterprise Identifier:

I-2025-402-0025

Licensee:

Tennessee Valley Authority

Facility:

Sequoyah Nuclear Plant

Location:

Soddy-Daisy, TN

Inspection Dates:

June 02, 2025 to June 05, 2025

Inspectors:

M. Denman, Physical Security Inspector

J. Tornow, Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Nuclear Security Branch

Division of Fuels, Radiological Safety, and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Sequoyah Nuclear Plant, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.04 - Equipment Performance, Testing, and Maintenance

The inspectors evaluated the security equipment testing and maintenance program. The following elements were evaluated from IP:

Equipment Performance, Testing, and Maintenance (1 Sample)

(1) Tier I: All Requirements Tier II: 2.09 a., b.; 2.11 d.; 2.12 a.

Tier III: 2.14; 2.15 a., c.

71130.07 - Security Training

The inspectors evaluated the security training program through completion of the following

procedure elements: Security Training

(1)

  • Tier I: All Requirements
  • Tier II: All Requirements
  • Tier III: 6 Requirements (02.10, 02.11 a, 02.13 a-c, 02.14 a)

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On June 5, 2025, the inspectors presented the security baseline inspection results to Kevin Michael and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

Resulting from

Inspection

CR 2017848

06/03/2025

Miscellaneous

LP-SEC-TSK-12

Test Intrusion Detection Equipment and Special Purpose

Detectors

Revision

24

0-PI-OPS-000-

677.0

Functionality Test of Security Backup Diesel Generator

Revision

0049

0-PI-SFT-245-

004.0

Security UPS Operability Test

Revision

0007

CTP-0-SEC-FPI-

245.S

Performance Intrusion Detection System Performance

Testing

Revision 007

CTP-0-SEC-FPI-

245.S

Perimeter Intrusion Detection System Performance Test

Revision

0007

CTP-0-SEC-FPI-

23.W

Card Reader And Balanced Magnetic Switch Operability Test

Revision

0006

CTP-0-SEC-FPI-

630.W

Perimeter Intrusion Detection and CCTV Systems Operability

Test

Revision

0004

CTP-0-SEC-FPI-

643.W

X-Ray Equipment Operability / Performance Tes

Revision

0006

CTP-0-SEC-FPI-

646.W

Walk Through Metal Detector Operability / Performance Test

Revision

0004

CTP-0-SEC-FPI-

647.W

Explosive Detector Operability / Performance Test

Revision

0008

NSDP-15.1

Testing and Maintenance

Rev. 0005

71130.04

Procedures

NSDP-26

Weapons Accountability and Security Response Equipment

Rev. 0026

Corrective Action

Documents

1961877

09/30/2024

71130.07

Corrective Action

Documents

Resulting from

Inspection

CR 2018156

06/04/2025

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Firearms Instructor / Armorer Certifications

Annual Rifle Day, Low Light, Qualification Course Approval

04/09/2025

Security Officer Training Files (samples)

24/2025

LP-SEC-ANN-005

Tamper and Sabotage

05/18/2017

LP-SEC-ANN-006

Use of Force

11/01/2018

LP-SEC-GEN-

010

Security Reportability

Revision 002

LP-SEC-TSK-22

Physical Fitness Test

07/06/2020

LP-SEC-TSK-278

Rifle Familiarization

Revision 008

Miscellaneous

LP-SEC-TSK-27C

Annual Tactical Qualification Course

Revision 039

TVA Physical Security Plan and Training and Qualification

Plan

Revision 23

NSDP-18

Administration of Security Training

Rev. 0023

NSDP-30

Security Duty Restrictions

Revision

0012

NSDP-44

Graded Systematic Approach to Security Training (GSAST)

Rev. 0012

NSDP-44.1

Security On The Job Training

Rev. 0008

Procedures

NSDP-44.2

Security Task Performance Evaluation

Rev. 0013

Self-Assessments

L17 231120 800 /

SSA 2308

Physical Security, Contingency Plan, and Safeguards

Information Quality Assurance Audit

09/11/2023-

11/27/2023