FOF Inspection Report 05000327/2011202 and 05000328/2011202
ML113420328
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 12/16/2011
From: Rachel Johnson
NRC/NSIR/DSO/DDSO/SPEB
To: John Carlin
Tennessee Valley Authority
References
IR-11-202
Download: ML113420328 (3)


Text

ber 16, 2011

SUBJECT:

SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2; NRC SECURITY INSPECTION REPORT 05000327/2011202 AND 05000328/2011202

Dear Mr. Carlin:

On October 27, 2011, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Sequoyah Nuclear Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the Security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report documents the inspection results, which were discussed on November 2, 2011 and November 4, 2011 with members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

One non-cited violation finding of very low security significance (Green) was identified during the inspection. The significance of most findings is indicated by their color (Green, White, Yellow, Red) using Inspection Manual Chapter 0609, Significance Determination Process (SDP).

Findings for which the SDP does not apply may be Green or be assigned to a security level after NRC management review. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 4, dated December 2006.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's

"Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information - Withhold Under 10 CFR 2.390 and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Robert C. Johnson, Chief Security Performance Evaluation Branch Division of Security Operations Office of Nuclear Security and Incident Response Docket Nos.: 50-327, 50-328 License Nos.: DPR-77, DPR-79 Non-Public Enclosure: Inspection Report No. 05000327/2011202 and 05000328/2011202 w/Attachments cc w/encl: A. Little, Sequoyah Nuclear Plant, Units 1 and 2 G. Cook, S Sequoyah Nuclear Plant, Units 1 and 2 cc w/o encl: J. Carlin, Sequoyah Nuclear Plant, Units 1 and 2 ML113420328 OFFICE NSIR/DSO/SPEB NSIR/DSO/SPEB R11 NSIR/DSO/SPEB NAME D. Cornelius A. Rayland B. Desai C. Johnson DATE 12/1//2011 12/1/2011 12/6/11 12/ /11