| | Q | CCA | Title |
|---|
| 05000327/FIN-2011002-01 | 2011Q1 | H.5 | Reactor Trip due to Unplugged Steam Dump Load Reject Controller |
| 05000327/FIN-2011002-02 | 2011Q1 | | \\\"Failure to Adequately Qualify Molded-Case Circuit Breakers to Safety-Related
Application Through Commercial Grade
Dedication\\\" |
| 05000327/FIN-2011002-03 | 2011Q1 | H.7 | Loss of 480-V Motor Control Center Due To Inadequate Breaker Replacement Maintenance |
| 05000327/FIN-2011002-04 | 2011Q1 | H.7 | Inadequate Maintenance Procedures Result in Inoperable Feedwater Regulating Valve |
| 05000327/FIN-2011006-02 | 2011Q1 | H.8 | Failure to Establish Compensatory Actions for Blocked Sprinklers |
| 05000327/FIN-2011006-03 | 2011Q1 | | Sprinkler System in Room 690.0-A1 of the Auxiliary Building Has Nfpa Code Deviation |
| 05000327/FIN-2011006-01 | 2011Q1 | | Use of Operator Manual Actions in Lieu of Protecting Cables and Equipment Required for POST-FIRE Safe Shutdown |
| 05000327/FIN-2011003-01 | 2011Q2 | | Failure to Perform Instrumentation Surveillance Testing within Required Frequency |
| 05000327/FIN-2011402-01 | 2011Q2 | H.7 | Security |
| 05000327/FIN-2011402-02 | 2011Q2 | H.8 | Security |
| 05000327/FIN-2011004-01 | 2011Q3 | | Failure to Report System Actuation |
| 05000327/FIN-2011005-01 | 2011Q4 | H.8 | Failure to Follow Procedure for Loss of Power Diesel Generator Start Instrumentation Surveillance Testing |
| 05000327/FIN-2011005-02 | 2011Q4 | H.14 | Failure to Maintain Thermal Power Less Than Licensed Limit |
| 05000327/FIN-2011005-03 | 2011Q4 | H.12 | Nuclear Instrumentation System Channel Calibration Error |
| 05000327/FIN-2011202-01 | 2011Q4 | | Security |