Category:Letter
MONTHYEARIR 05000324/20230112023-12-26026 December 2023 NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 ML23297A0262023-11-27027 November 2023 Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230052023-08-23023 August 2023 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) IR 05000324/20230022023-08-0404 August 2023 Integrated Inspection Report 05000324/2023002 and 05000325/2023002 ML23201A2042023-07-28028 July 2023 Summary of Regulatory Audit in Support of Alternative Request RA-22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20243012023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 ML23212B2682023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 ML23146A0012023-05-24024 May 2023 EN 56538 - Engine Systems Inc and Brunswick ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML23130A3902023-05-12012 May 2023 Regulatory Audit Plan in Support of Alternative Request RA 22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20230012023-05-10010 May 2023 Integrated Inspection Report 05000324 2023001 and 05000325 2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000324/20220042023-04-0404 April 2023 Reissue - Brunswick Steam Electric Plant - Integrated Inspection Report 05000324/2022004 and 05000325/022004 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000324/20220062023-03-0101 March 2023 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 NRC Inspection Reports 05000324/2022006 and 05000325/2022006 ML23033A5252023-02-0808 February 2023 Integrated Inspection Report 05000324/2022004 and 05000325/2022004 IR 05000324/20223012023-02-0303 February 2023 NRC Operator License Examination Report 05000325/2022301 and 05000324/2022301 IR 05000324/20224022022-11-23023 November 2022 Security Baseline Inspection Report 05000324 2022402 and 05000325 2022402 ML22332A0132022-11-23023 November 2022 Operator Licensing Written Examination Approval 05000325/2022301 and 05000324/2022301 ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000324/20224032022-11-10010 November 2022 Cyber Security Inspection Report 05000324/2022403 and 05000325/2022403 ML22307A1762022-11-0707 November 2022 Notification of an NRC Fire Protection Team Inspection (FPTI) IR 05000324/20220032022-11-0707 November 2022 Integrated Inspection Report 05000324/2022003 and 05000325/2022003 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 05000324/20220052022-08-24024 August 2022 Updated Inspection Plan for Brunswick Steam Electric Plant (Report 05000324/2022005 and 05000325/2022005) ML22230D0692022-08-22022 August 2022 Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-ichi Accident IR 05000324/20220022022-08-0505 August 2022 Integrated Inspection Report 05000324/2022002 and 05000325/2022002 IR 05000324/20220102022-06-27027 June 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000324 2022010 and 05000325 2022010 ML22028A1742022-05-12012 May 2022 Issuance of Amendment Nos. 309 and 337 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-580, Revision 1 IR 05000324/20220012022-05-10010 May 2022 Integrated Inspection Report 05000324/2022001 and 05000325/2022001 ML22119A1352022-05-0909 May 2022 Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000325/2022403; 05000324/2022403 ML22082A2682022-05-0202 May 2022 Issuance of Amendment Nos. 308 and 336 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2 ML22102A0502022-04-11011 April 2022 301 Corporate Notification Letter IR 05000324/20224012022-03-16016 March 2022 Security Baseline Inspection Report 05000324/2022401 and 05000325/2022401 ML22054A2152022-03-0808 March 2022 Correction to Amendments to Revise Standby Liquid Control System Boron Solution Storage Tank Volume Technical Specifications IR 05000324/20210062022-03-0202 March 2022 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 (Reports No. 05000324/2021006 and 05000325/2021006) IR 05000324/20210042022-02-14014 February 2022 Integrated Inspection Report 05000324/2021004 and 05000325/2021004 ML22035A1262022-02-0909 February 2022 Withdrawal of Exemption Request from the Requirements of 10 CFR Part 50, Appendix E, Section IV.F.2.d (EPID L-2021-LLE-0055 (COVID-19)) ML21354A5032022-01-24024 January 2022 Requested Exemption from 10 CFR 50, Appendix E, Section IV.F.2.D Not Required (EPID L-2021-LLE-0055 (COVID-19)) ML22018A1842022-01-18018 January 2022 Notification of Brunswick Steam Electric Plant, Units 1 & 2 - Design Bases Assurance Inspection - U.S. Nuclear Regulatory Inspection Report 05000324/2022010 and 05000325/2022010 ML21348A7192021-12-21021 December 2021 Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times 2023-09-25
[Table view] Category:License-Operator Examination Report
MONTHYEARIR 05000324/20203012021-01-22022 January 2021 NRC Operator License Examination Report 05000325/2020301 and 05000324/2020301 IR 05000324/20193012019-03-0404 March 2019 NRC Operator License Examination Report 05000325/2019301 and 05000324/2019301 ML17277A3302017-10-0303 October 2017 NRC Examination Report 05000325/2017301 and 05000324/2017301 IR 05000324/20163012017-01-27027 January 2017 NRC Examination Report 05000325/2016301 and 05000324/2016301 IR 05000324/20153012016-02-19019 February 2016 NRC Examination Report 05000325/2015301 and 05000324/2015301, December 17, 2015 and December 15, 2015 IR 05000324/20143012014-11-19019 November 2014 Er 05000325/2014301 and Er 05000324/2014301; Operating Test October 6 - 14, 2014, & Written Exam October 21, 2014; Brunswick Steam Electric Plant, Units 1 & 2; Operator License Examinations IR 05000324/20123012013-01-23023 January 2013 Er 05000325/12-301 & 05000324/12-301, on 12/03-13/20123, Brunswick Steam Electric Plant - NRC Examination Report IR 05000324/20103022011-02-0101 February 2011 Er 05000325-10-302 and Er 05000324-10-302; on December 6-13, 2010, and December 20, 2010; Brunswick Steam Electric Plant, Units 1 & 2; Licensed Operator Examinations IR 05000324/20083022008-08-0505 August 2008 Er 05000325-08-302 and 05000324-08-302, on 08/04/2008, 10/06/2008, and 11/10/2008, Brunswick Steam Electric Plant - Reactor and Senior Reactor Operator Initial ML0821802362008-08-0505 August 2008 Er 05000325-08-302 and 05000324-08-302, on 08/04/2008, 10/06/2008, and 11/10/2008, Brunswick Steam Electric Plant - Reactor and Senior Reactor Operator Initial IR 05000324/20083012008-05-29029 May 2008 on 04/17/08 Examination Report 05000325/08-301 and 05000324/08-301, Reactor and Senior Reactor Operator Retake Initial IR 05000324/20073012007-09-12012 September 2007 Er 05000325-07-301, Er 05000324-07-301; 7/16 - 22/2007 and 08/3/2007; Brunswick Steam Electric Plant, Units 1 & 2; Licensed Operator Examinations ML0725600022007-09-12012 September 2007 Er 05000325-07-301, Er 05000324-07-301; 7/16 - 22/2007 and 08/3/2007; Brunswick Steam Electric Plant, Units 1 & 2; Licensed Operator Examinations BSEP-05-0120, Operator Licensing Examination Data2005-09-22022 September 2005 Operator Licensing Examination Data ML0435200362004-12-16016 December 2004 NRC Examination Report 05000325-04-301 and 05000324-04-301 2021-01-22
[Table view] |
Text
UNITED STATES ary 1, 2011
SUBJECT:
BRUNSWICK STEAM ELECTRIC PLANT - NRC EXAMINATION REPORT 05000325/2010302 AND 05000324/2010302
Dear Mr. Annacone:
During the period December of 6 - 13, 2010, the Nuclear Regulatory Commission (NRC)
administered operating tests to employees of your company who had applied for licenses to operate the Brunswick Steam Electric Plant. At the conclusion of the tests, the examiners discussed preliminary findings related to the operating tests with those members of your staff identified in the enclosed report. The written examination was administered by your staff on December 20, 2010.
All applicants passed both the operating test and written examination. There were no post-examination comments. A Simulator Fidelity Report is included in this report as Enclosure 2.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm.html (the Public Electronic Reading Room).
If you have any questions concerning this letter, please contact me at (404) 997-4550
Sincerely,
/RA/
Malcolm T. Widmann, Chief Operations Branch Division of Reactor Safety Docket Nos.: 50-325, 50-324 License Nos.: DPR-71, DPR-62
Enclosures:
1. Report Details 2. Simulator Fidelity Report
REGION II==
Docket Nos.: 05000325, 05000324 License Nos.: DPR-71, DPR-62 Report No.: 05000325/2010302 and 05000324/2010302 Licensee: Carolina Power and Light Company Facility: Brunswick Steam Electric Plant, Units 1 and 2 Location: Southport, NC Dates: Operating Tests - December 6 - 13, 2010 Written Examination - December 20, 2010 Examiners: P. Capehart, Chief Examiner M. Bates, Senior Operations Engineer K. Schaaf, Operations Engineer P. Young, Reactor Engineer Approved by: Malcolm T. Widmann, Chief Operations Branch Division of Reactor Safety Enclosure 1
SUMMARY OF FINDINGS ER 05000325/2010302 and ER 05000324/2010302; December 6-13, 2010, and December 20, 2010; Brunswick Steam Electric Plant, Units 1 & 2; Licensed Operator Examinations.
Nuclear Regulatory Commission (NRC) examiners conducted an initial examination in accordance with the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." This examination implemented the operator licensing requirements identified in 10 CFR §55.41, §55.43, and §55.45, as applicable.
Members of the Brunswick training staff developed the written examination, the operating test outlines and the operating tests. The operating tests included job performance measures and scenarios. The NRC developed the written examination outlines.
The NRC administered the operating tests during the period of December 6 - 13, 2010. The Brunswick training staff administered the written examination on December 20, 2010. Two Reactor Operators (RO) and 10 Senior Reactor Operators (SRO) applicants passed both the operating test and written examination.
There were no post examination comments.
No findings of significance were identified.
Enclosure 1
REPORT DETAILS 4. OTHER ACTIVITIES (OA)
4OA5 Operator Licensing Initial Examinations a. Inspection Scope Members of the Brunswick Steam Electric Plant developed both the operating tests and the written examination. All examination material was developed in accordance with the guidelines contained in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." The NRC examination team reviewed the proposed examination. Examination changes agreed upon between the NRC and the licensee were made per NUREG-1021, and incorporated into the final version of the examination materials.
The NRC reviewed the licensees examination security measures while preparing and administering the examinations in order to ensure compliance with 10 CFR §55.49, Integrity of examinations and tests.
The NRC examiners evaluated two RO, and 10 SRO applicants using the guidelines contained in NUREG-1021. The examiners administered the operating tests during the period of December 6 - 13, 2010. Members of the Brunswick Steam Electric Plant training staff administered the written examination on December 20, 2010. Evaluations of applicants and reviews of associated documentation were performed to determine if the applicants, who applied for licenses to operate the Brunswick Steam Electric Plant, met the requirements specified in 10 CFR Part 55, Operators Licenses.
b. Findings No findings of significance were identified. The NRC used NUREG-1021, to determine that the licensees draft written and operating examination submittal was within the range of acceptability expected for a proposed examination.
All applicants passed both the operating test and written examination and were issued licenses.
Copies of all individual examination reports were sent to the Training Manager for evaluation and determination of appropriate remedial training.
A copy of the final RO written examination/answer key, and the final SRO written exam/answer key with all changes incorporated, was entered into the ADAMS system (ADAMS Accession Number(s) ML110240159, ML110240159); however, the release of these examinations will be delayed until December 20, 2012.
Enclosure 1
4OA6 Meetings, Including Exit Exit Meeting Summary On December 14, 2010, the NRC examination team discussed generic issues associated with the operating test with you and members of the Brunswick Steam Electric Plant staff. The examiners asked the licensee if any of the examination material was proprietary. No proprietary information was identified.
PARTIAL LIST OF PERSONS CONTACTED Licensee Personnel L. Beller, Superintendant of Operator Training B. Bolin, Senior Nuclear Operations Training Instructor S. Gordy, Operations Manager L. Grzeck, Licensing Supervisor (Acting)
W. Jefferson, Director of Site Operations M. Nemec, Senior Nuclear Operations Training Instructor A. Padleckas, Superintendant Nuclear Operations Performance T. Pearson, Supervisor Operator Initial Training T. Sherrill, Licensing E. Wills, Plant General Manager Enclosure 1
SIMULATION FACILITY REPORT Facility Licensee: Brunswick Steam Electric Plant Facility Docket No.: 05000325 and 05000324 Operating Tests Administered on: December 6 - 13, 2010 This form is to be used only to report observations. These observations do not constitute audit or inspection findings, and without further verification and review in accordance with IP 71111.11, are not indicative of noncompliance with 10 CFR 55.46. No licensee action is required in response to these observations.
While conducting the simulator portion of the operating tests, examiners did not observe any simulation fidelity issues.
Enclosure 2