IR 05000325-07-401 and 05000324-07-401, on 08/24/2007, Brunswick Steam Electrical Plant - Physical Security Baseline Inspection
ML072570260
Person / Time
Site: Brunswick  Duke energy icon.png
Issue date: 09/14/2007
From: Joel Munday
NRC/RGN-II, NRC/RGN-II/DRS/PSB2
To: Scarola J
Carolina Power & Light Co
References
IR-07-401
Download: ML072570260 (3)


Text

ber 14, 2007

SUBJECT:

BRUNSWICK STEAM ELECTRICAL PLANT - NRC PHYSICAL SECURITY BASELINE INSPECTION REPORT 05000325/2007401 AND 05000324/2007401

Dear Mr. Scarola:

On August 24, 2007, the U. S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Brunswick Steam Electrical Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed report documents the inspection results, which were discussed with you, and other members of your staff on August 24, 2007.

This inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection no findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390 a copy of this letters enclosure will not be available for public inspection. CP&L 2 In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS.

If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information-Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Should you have any questions concerning this letter, please contact us.

Sincerely,

/RA/

Joel T. Munday, Chief Plant Support Branch 2 Division of Reactor Safety Docket Nos. 50-325, 50-324 License Nos. DPR-71, DPR-62 Enclosure: NRC Inspection Report 05000325/2007401 and 05000324/2007401 w/Attachment: Supplemental Information cc w/encl: Page 3 CP&L 3 cc w/encl: Annette H. Pope, Supervisor cc w/Inspection Summary: Licensing/Regulatory Programs Benjamin C. Waldrep, Director Brunswick Steam Electric Plant Site Operations P. O. Box 10429 Brunswick Steam Electric Plant Southport, NC 28461 Carolina Power & Light Company P. O. Box 10429 David T. Conley Southport, NC 28461 Associate General Counsel - Legal Dept.

Progress Energy Service Company, LLC Terry D. Hobbs, Plant General Manager P. O. Box 1551 Brunswick Steam Electric Plant Raleigh, NC 27602-1551 Carolina Power & Light Company P. O. Box 10429 Southport, NC 28461 J. Paul Fulford, Manager Performance Evaluation and Regulatory Affairs PEB 5 Carolina Power & Light Company P. O. Box 1551 Raleigh, NC 27602-1551 Donald L. Griffith Manager - Training Progress Energy Carolinas, Inc.

Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461 Randy C. Ivey Manager - Support Services Progress Energy Carolinas, Inc.

Brunswick Steam Electric Plant P. O. Box 10429 Southport, NC 28461 Garry D. Miller Manager-License Renewal Progress Energy Post Office Box 1551 Raleigh, NC 27602