IR 05000321-09-402, 05000366-09-402, on 07/17/2009, Edwin I. Hatch Nuclear Plant - Security Inspection Report
ML092160797
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 08/04/2009
From: Ernstes M
NRC/RGN-II/DRS/PSB2
To: Madison D
Southern Nuclear Operating Co
References
IR-09-402
Download: ML092160797 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 August 4, 2009 Mr. Dennis Vice President Southern Nuclear Operating Company, Inc.

Edwin I. Hatch Nuclear Plant 11028 Hatch Parkway North Baxley, GA 31513 SUBJECT: EDWIN I. HATCH NUCLEAR PLANT - SECURITY INSPECTION REPORT 05000321/2009402 AND 05000366/2009402

Dear Mr. Madison:

On July 17, 2009, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Edwin I. Hatch Nuclear Plant, Units 1 and 2. In addition we completed an inspection of the Independent Spent Fuel Storage Installation (ISFSI). The purpose of this inspection was to evaluate whether the protection of the ISFSI was in compliance with the Hatch Physical Security Plan for the ISFSI and the additional security measures imposed by the NRC Order dated October 16, 2002. The enclosed inspection report documents the inspection results, which were discussed on July 17, 2009, with Mr. J. Lewis and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS.

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter=s enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRC=s document system, ADAMS. SNC, Inc. 2 If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response ASecurity-Related InformationBWithhold Under 10 CFR 2.390@ and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Sincerely,

/RA/

Michael E. Ernstes, Chief Plant Support Branch 2 Division of Reactor Safety Docket No.: 50-321, 50-366 License No.: DPR-57, NPF-5 Enclosure: Inspection Report 05000321/2009402 and 05000366/2009402 w/Attachment: Supplemental Information cc w/encl.: (See page 3) SNC, Inc. 3 cc w/Encl:

L. Mike Stinson Vice President Fleet Operations Support Southern Nuclear Operating Company, Inc.

P.O. Box 1295 Birmingham, AL 35201-1295 Moanica Caston Vice President and General Counsel Southern Nuclear Operating Company, Inc.

Bin B-022 P.O. Box 1295 Birmingham, AL 35201-1295 Raymond D. Baker Licensing Manager Licensing-Hatch Southern Nuclear Operating Company, Inc.

P.O. Box 1295 Birmingham, AL 35201-1295 Jeffrey T. Gasser Executive Vice President Southern Nuclear Operating Company, Inc.

P.O. Box 1295 Birmingham, AL 35201-1295 David H. Jones Vice President Engineering Southern Nuclear Operating Company, Inc.

P.O. Box 1295 Birmingham, AL 35201-1295 _________________________ X SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRS RII:DRS RII:DRS RII:DRS RII:DRP SIGNATURE /RA/ /RA/ /RA/ /RA/ /RA/

NAME M. Ernstes A. Richardson J. Tornow J. Graham S. Shaeffer DATE 8/4/2009 7/29/2009 8/4/2009 7/30/2009 8/ /2009 8/3/2009 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES N