MONTHYEARML20138H3831999-10-25025 October 1999 Forwards Draft Model of Renewed License for Calvert Cliffs, Unit 2 to Illustrate How List of Minimum Requirements Could Be Incorporated Into License Condition ML20217M9991999-10-22022 October 1999 Forwards Response to NRC 990930 RAI Re Void Swelling Degradation Mechanism,Per License Renewal Application for Ccnpp,Units 1 & 2 ML20217M1721999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept Form Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20212M2631999-10-0404 October 1999 Informs That Staff Concluded That Licensee Responses to GL 97-06 Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Calvert Cliffs Nuclear Power Plant ML20216J8671999-10-0101 October 1999 Forwards Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant. Rev Accurately Presents Changes Made Since Previous Submittal,Necessary to Reflect Info & Analyses Submitted to NRC or Prepared,Per to NRC Requirements ML20212J7811999-09-30030 September 1999 Requests That Licensee Address Potential Aging Mgt Issue Re Effects of Void Swelling of Rv Internals by Making Plant Specific Commitment to Implement Focused age-related Degradation Insp for Evidence of Void Swelling in Future ML20212J5611999-09-29029 September 1999 Informs That on 990916,NRC Completed mid-cycle Plant Performance Review of Calvert Cliffs.No Areas in Which Util Performance Warranted Addl Insp Beyond Core Insp Program Identified.Historical Listing of Plant Issues,Encl ML20216H7831999-09-28028 September 1999 Forwards Addl Info Re NRC SER for Ccnpp,Units 1 & 2,per License Renewal Application ML20212D5361999-09-20020 September 1999 Forwards Rev 1 to Calculation CA04048, Fuel Handling Accident During Reconstitution, as Agreed During 990909 Telcon ML20212C1861999-09-15015 September 1999 Requests That NRC Complete Review of TR CED-387-P,Rev 00-P, Abb Critical Heat Flux Correlations for PWR Fuel, by 000201.Util Expects to Use ABB-NV Correlation for Current non-mixing Vane Fuel in Reload Analyses in 2000 for Ccnpp ML20212A2001999-09-0808 September 1999 Forwards Insp Repts 50-317/99-06 & 50-318/99-06.Two Violations Being Treated as Noncited Violations ML20211N8971999-09-0707 September 1999 Responds to Ltr to D Rathbun of NRC Dtd 990720,in Which Recipient Refers to Ltr from Wc Batton Expressing Support on Renewal Application of Baltimore Gas & Electric Co for Calvert Cliffs Plants ML20211H9841999-08-31031 August 1999 Provides Comments Re Data Entered in Rvid for Ccnpp,Units 1 2,per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211K3091999-08-27027 August 1999 Informs That During 990826 Telcon,L Briggs & B Bernie Made Arrangements for NRC to Inspect Licensed Operator Requalification Program at Calvert Cliffs Npp.Insp Planned for Wk of 991025 ML20211J1611999-08-17017 August 1999 Documents Bg&E Consultations with MD Dept of Natural Resources Re Potential Impacts to Chesapeake Bay Critical Area & Forest Interior Dwelling Bird Habitat,Per Ccnpp License Renewal.Telcons Ref Satisfy Consulting Requirement ML20210V1181999-08-17017 August 1999 Forwards Toxic Gases Calculations for Control Room Habitability,As Discussed During 990713 Telcon.Util Will Make Final Submittal for Toxic Gases After NRC Has Completed Review of ARCON96 ML20210T5061999-08-16016 August 1999 Forwards Rev 0 to Ccnpp COLR for Unit 2,Cycle 13, Per Plant TS 5.6.5 ML20210U2761999-08-13013 August 1999 Forwards Listed Info Re Guarantee of Payment of Deferred Premiums for Ccnpp,Units 1 & 2,IAW 10CFR140.21 Requirements ML20210S8131999-08-12012 August 1999 Forwards Summary of Various Open Licensing Actions for Bg&E That Were Completed During Unit 2 Refueling Outage Ending 990506 ML20210S8101999-08-12012 August 1999 Forwards Application Requesting Renewal of License for Mv Seckens,License SOP-10369-2.Without Encl ML20210S7901999-08-12012 August 1999 Forwards semi-annual Fitness for Duty Program Performance Data for Period of 990101-990630,IAW 10CFR36.71(d) ML20210Q1941999-08-11011 August 1999 Informs That Info Submitted in 981130 Application Re CEN-633-P,Rev 03-P,dtd Oct 1998,marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20210N5881999-08-0606 August 1999 Forwards ISI Rept for Ccnpp,Unit 2,fulfilling Intentions & Requirements Stated in Program Plan & Commitment to Comply with ASME Code Section XI ISI Requirements ML20210N1291999-08-0505 August 1999 Forwards NRC Response to W Batton Ltr Expressing Support of Renewal Application for Calvert Cliffs Plants as Requested in Ltr ML20210N5491999-08-0505 August 1999 Requests That License SOP-10371-2,for RW Scott,Be Renewed IAW 10CFR55.57.Individual Has Satisfactorily Discharged License Responsibilities Competently & Safely.Without Application ML20210N5471999-08-0505 August 1999 Requests That License SOP-10031-3,for DF Theders,Be Removed from Active Files for Ccnpp,Due to Individual Being Reassigned to Position No Longer Requiring License ML20210N9291999-08-0404 August 1999 Forwards Clarification to Initial Response to Biennial Rept on Status of Decommissioning Funding,As Required by 10CFR50.75(f)(1) ML20210J0741999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise on 990714.Suggests Referral to NRC Y2K Web Site to View Issues & Lessons from Tabletop That Will Be Tracked by Nrc.Web Site Should Reflect Info within 2 Wks ML20211B5381999-07-30030 July 1999 Expresses Appreciation for Support in Y2K Training & Tabletop Exercise Held on 990714.Suggests Referral to NRC Y2K Web Site to View Issues & Lessons from Tabletop That Will Be Tracked by NRC ML20211C0951999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise Held on 990714 ML20211C3251999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise Held on 990714 ML20210E4941999-07-23023 July 1999 Informs That 1999 Emergency Response Plan Exercise Objectives Is Scheduled for Wk of 991025.Exercise Scenario Will Test Integrated Capability & Major Portion of Elements Existing within Emergency Response Plan ML20210D0911999-07-22022 July 1999 Responds to to Chairman Jackson Referring to Ltr from New 7th Democratic Civic Club,Inc.Forwards Staff Response to W Batton,President of New 7th Democratic Civic Club,Inc ML20210C5011999-07-21021 July 1999 Informs That SL Walters,License OP-10096-3 & CC Zapp,License Number SOP-2188-9,have Been Reassigned within Organization & No Longer Require NRC License,Per 10CFR50.74(a).Removal of Subject Licenses from Active Files for Ccnpp,Requested ML20210C2681999-07-20020 July 1999 Forwards Certified Copy of Listed Nuclear Liability Policy Endorsement,Per 10CFR140.15(e) ML20210A5021999-07-20020 July 1999 Responds to ,Expressing Support for Renewal of Operating Licenses for Calvert Cliffs Plant & to Concerns Re Lack of Specificity for License Renewal Regulations & Length of Time Set Aside for Public Comment ML20211N9101999-07-20020 July 1999 Forwards Correspondence Author Received from New 7th Democratic Club Civic,Inc Raising Some Serious Concerns About Renewal of Nuclear Reactor Licenses for Calvert Cliffs Power Plant ML20210C8461999-07-19019 July 1999 Informs That CF Farrow,License OP-10648-1,will No Longer Be Employed with Bg&E,As of 990709,per 10CFR50.74(a).Removal of Subject License from Active Files for Ccnpp,Requested ML20209J5171999-07-16016 July 1999 Forwards Comments from Accuracy Review of License Renewal Application SER ML20210B7651999-07-15015 July 1999 Forwards SER Denying Licensee Proposed TS Amend Dtd 981120, to Delete TS Requirements for Tendon Surveillance & Reporting Because TS Requirements Duplication of Requirements in 10CFR50.55a.Notice of Denial Encl ML20209G2081999-07-13013 July 1999 Forwards Insp Repts 50-317/99-05 & 50-318/99-05 on 990509- 0626.No Violations Noted ML20210A6311999-07-0606 July 1999 Discusses Closure of TACs MA0532 & MA0533 Re Response to Requests for Addl Info to GL 92-01,rev1,suppl 1, Reactor Vessel Structural Integrity, for Plant,Units 1 & 2 ML20209C1391999-07-0202 July 1999 Forwards Responses to Open & Confirmatory Items Based on Review of SER for Bg&E Application for Renewal of Operating Licenses for Calvert Cliffs.Bg&E Intends to Forward Comments Based on Accuracy Verification in Near Future ML20210D1531999-06-30030 June 1999 Informs of Receipt of from New 7th Democratic Civic Club,Inc Expressing Support for License Renewal. Requests Consideration in Addressing Concerns & Recommendations ML20209B5781999-06-29029 June 1999 Submits Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML20210D1741999-06-24024 June 1999 Expresses Opinions on Renewal of Nuclear Reactor Licenses Re Plant & Support Renewal Application of Bg&E.Requests That NRC Revise Procedures to Allow Sufficient Time for Public to Review,Evaluate & Respond to Info ML20211H8431999-06-23023 June 1999 Ack Participation of Calvert Cliffs Nuclear Engineering Dept in NRC Cooperative Research Project with Univ of Virginia. Copy of Relevant Portion of NRC Cooperative Agreement with Univ of Virginia Encl ML20196C6831999-06-21021 June 1999 Discusses Proposed Alternative Submitted by Bg&E for Calvert Cliffs NPP to Requirements of 10CFR50.55a(g)(4) in Regard to Compliance with Latest Approved Edition of ASME Code,Section XI for Third Ten Year Insp Interval Beginning on 990701 ML20196C4291999-06-21021 June 1999 Forwards Rev to ERDS Data Point Library for Ccnpp,Unit 2,per 10CFR50,App E,Section VI.3.a.Table Provides Brief Summary of Changes ML20195J8271999-06-16016 June 1999 Ack Receipt of to Jackson,Chairman of NRC Re Environ Impacts of Increased Patuxtent River Complex Flight Operations on Ccnpp.Clarification & Correction of Listed Statement Found on Page Two,Provided 1999-09-08
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20138H3831999-10-25025 October 1999 Forwards Draft Model of Renewed License for Calvert Cliffs, Unit 2 to Illustrate How List of Minimum Requirements Could Be Incorporated Into License Condition ML20217M1721999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept Form Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20212M2631999-10-0404 October 1999 Informs That Staff Concluded That Licensee Responses to GL 97-06 Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Calvert Cliffs Nuclear Power Plant ML20212J7811999-09-30030 September 1999 Requests That Licensee Address Potential Aging Mgt Issue Re Effects of Void Swelling of Rv Internals by Making Plant Specific Commitment to Implement Focused age-related Degradation Insp for Evidence of Void Swelling in Future ML20212J5611999-09-29029 September 1999 Informs That on 990916,NRC Completed mid-cycle Plant Performance Review of Calvert Cliffs.No Areas in Which Util Performance Warranted Addl Insp Beyond Core Insp Program Identified.Historical Listing of Plant Issues,Encl ML20212A2001999-09-0808 September 1999 Forwards Insp Repts 50-317/99-06 & 50-318/99-06.Two Violations Being Treated as Noncited Violations ML20211N8971999-09-0707 September 1999 Responds to Ltr to D Rathbun of NRC Dtd 990720,in Which Recipient Refers to Ltr from Wc Batton Expressing Support on Renewal Application of Baltimore Gas & Electric Co for Calvert Cliffs Plants ML20211K3091999-08-27027 August 1999 Informs That During 990826 Telcon,L Briggs & B Bernie Made Arrangements for NRC to Inspect Licensed Operator Requalification Program at Calvert Cliffs Npp.Insp Planned for Wk of 991025 ML20210Q1941999-08-11011 August 1999 Informs That Info Submitted in 981130 Application Re CEN-633-P,Rev 03-P,dtd Oct 1998,marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20210N1291999-08-0505 August 1999 Forwards NRC Response to W Batton Ltr Expressing Support of Renewal Application for Calvert Cliffs Plants as Requested in Ltr ML20211C0951999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise Held on 990714 ML20210J0741999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise on 990714.Suggests Referral to NRC Y2K Web Site to View Issues & Lessons from Tabletop That Will Be Tracked by Nrc.Web Site Should Reflect Info within 2 Wks ML20211C3251999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise Held on 990714 ML20211B5381999-07-30030 July 1999 Expresses Appreciation for Support in Y2K Training & Tabletop Exercise Held on 990714.Suggests Referral to NRC Y2K Web Site to View Issues & Lessons from Tabletop That Will Be Tracked by NRC ML20210D0911999-07-22022 July 1999 Responds to to Chairman Jackson Referring to Ltr from New 7th Democratic Civic Club,Inc.Forwards Staff Response to W Batton,President of New 7th Democratic Civic Club,Inc ML20210A5021999-07-20020 July 1999 Responds to ,Expressing Support for Renewal of Operating Licenses for Calvert Cliffs Plant & to Concerns Re Lack of Specificity for License Renewal Regulations & Length of Time Set Aside for Public Comment ML20210B7651999-07-15015 July 1999 Forwards SER Denying Licensee Proposed TS Amend Dtd 981120, to Delete TS Requirements for Tendon Surveillance & Reporting Because TS Requirements Duplication of Requirements in 10CFR50.55a.Notice of Denial Encl ML20209G2081999-07-13013 July 1999 Forwards Insp Repts 50-317/99-05 & 50-318/99-05 on 990509- 0626.No Violations Noted ML20210A6311999-07-0606 July 1999 Discusses Closure of TACs MA0532 & MA0533 Re Response to Requests for Addl Info to GL 92-01,rev1,suppl 1, Reactor Vessel Structural Integrity, for Plant,Units 1 & 2 ML20211H8431999-06-23023 June 1999 Ack Participation of Calvert Cliffs Nuclear Engineering Dept in NRC Cooperative Research Project with Univ of Virginia. Copy of Relevant Portion of NRC Cooperative Agreement with Univ of Virginia Encl ML20196C6831999-06-21021 June 1999 Discusses Proposed Alternative Submitted by Bg&E for Calvert Cliffs NPP to Requirements of 10CFR50.55a(g)(4) in Regard to Compliance with Latest Approved Edition of ASME Code,Section XI for Third Ten Year Insp Interval Beginning on 990701 ML20196E0371999-06-16016 June 1999 Forwards Insp Repts 50-317/99-03 & 50-318/99-03 on 990321-0508.Apparent Violation Being Considered for Escalated Enforcement Action ML20207G4331999-06-0707 June 1999 Informs That in Response Request by Nrc,Fema Evaluated Adequacy of Evacuation Plans & Training of Local First Responders for Area Around Ccnpp.Copy of FEMA & Encl to Ltr,Which Provides FEMA Recommendations Encl ML20207G4701999-06-0707 June 1999 Informs of Reorganization in NRR Ofc,Effective 990328. Organization Chart Encl ML20207B2491999-05-21021 May 1999 Forwards Insp Repts 50-317/99-04 & 50-318/99-04 on 990405-16.No Violations Noted.Insp Revealed Few Potential & Plausible Aging Effects NRC Team Determined Should Be Included in License Renewal Application ML20207C0321999-05-18018 May 1999 Forwards Fifth Rept Which Covers Month of Apr 1999. Commission Approved Transfer of TMI-1 Operating License from Gpu to Amergen & Transfer of Operating License for Pilgrim Station from Beco to Entergy Nuclear Generating Co ML20206A6171999-04-22022 April 1999 Responds to Request for Statistics on Allegation Re Plant by J Osborne.Encl Tables Provides Breakdown of Allegations by Source Category for Allegations Receive in CY95-98 & First Six Month of 1999 ML20205R0961999-04-15015 April 1999 Forwards Insp Repts 50-317/99-01 & 50-318/99-01 on 990131- 0320.One Violation of NRC Requirements Identified & Being Treated as non-cited Violation,Consistent with App C of Enforcement Policy ML20205P1381999-04-0909 April 1999 Discusses 990223 Ppr.Forwards Plant Issues Matrix & Insp Plan.Since Spring 1998 Unit 1 Operated at Essentially Full Power.Unit 2 Had Similar Power History Except for Jul 1998 Manual Reactor Trip Due to Small Bore Pipe Steam Leak ML20205P1281999-04-0808 April 1999 Forwards Monthly Status Rept on Licensing Activities & Regulatory Duties of NRC for Mar 1999.Targets for Licensing Action Age & Completion Rates & License Renewal Process for Calvert Cliffs Remains on Schedule ML20205E5511999-03-26026 March 1999 Forwards Insp Repts 50-317/99-02 & 50-318/99-02 on 990208-12.No Violations Noted.Insp Was First of Three Planned Visits to Verify Ccnpp License Renewal in Compliance with Requirements of Rule for License Renewal ML20205G8841999-03-24024 March 1999 Discusses Bg&E Application Filed on 980408 for Renewal of Operating Licenses DPR-53 & DPR-68 for Calvert Cliffs Units, 1 & 2.For Listed Reasons,Partial Exemption from 10CFR170 Fees Granted IAW 10CFR170.11(b)(1) ML20205B0291999-03-24024 March 1999 Informs That Author Determined That Partial Exemption from 10CFR170 Fee Requirements Appropriate for Footnote 4 of License Renewal Application for Plants,Units 1 & 2,dtd 980408,that Staff Determines Has Generic Value to Industry ML20204H6281999-03-21021 March 1999 Forwards SER Reflecting Status of Staff Review of Util License Renewal for Calvert Cliffs Nuclear Power Plants, Units 1 & 2 ML20207E9641999-03-0404 March 1999 Forwards Insp Repts 50-317/98-12 & 50-318/98-12 on 981213- 990130 & Notice of Violation Re Failure of Maint Workers to Tighten Bolting for Svc Water Heat Exchanger ML20207G8631999-02-25025 February 1999 Forwards Operator Initial Exam Repts 50-317/99-301OL & 50-318/99-301OL on 990122 & 25-29 (Administration) & 990201- 05 (Grading).All Applicants Passed All Portions of Exams ML20203D3981999-02-0505 February 1999 Forwards Safety Evaluation Accepting Procedure Established for long-term Corrective Action Plan Related to Containment Vertical Tendons ML20203A6141999-02-0303 February 1999 Submits Details on Listed Areas Re Inspection Plan of Insp Scheduled for 990203 ML20202J1901999-01-28028 January 1999 Discusses License Renewal for Operating Power Reactors.Two Applications Received for Renewing Operating Licenses. Commission Established Adjudicatory Schedule Aimed at Completing License Renewal Process in 30-36 Months ML20202H7621999-01-28028 January 1999 Discusses Guidance Re License Renewal for Operating Power Reactors Developed in Response to FY99 Energy & Water Development Appropriations Act Rept 105-581 ML20199G4121999-01-20020 January 1999 Forwards SE Accepting Util USI A-46 Implementation Program for Plant ML20199L6621999-01-19019 January 1999 Informs That Licensee Authorized to Administer Initial Written Exam to Listed Applicants on 990122.NRC Region I Operator Licensing Staff Will Administer Operating Test to Applicants ML20199K8481999-01-19019 January 1999 Forwards Insp Repts 50-317/98-11 & 50-318/98-11 on 981025-1212.No Violations Noted ML20199F4101999-01-0808 January 1999 Forwards SE Accepting Util 960213,0725 & 981202 Responses to GL 95-07, Pressure Locking & Thermal Binding of Safety- Related Power-Operated Gate Valves ML20198S7491999-01-0707 January 1999 Forwards SER Accepting Licensee ,Suppl by 980424 & 1124 Ltrs Proposing Changes to Rev 49 of Calvert Cliffs Nuclear Power Plant Quality Assurance Program Description in Accordance with 10CFR50.54(a)(3) ML20198S4291999-01-0707 January 1999 Requests Addl Info Re License Renewal Application as Application Relates to Staff Position on Environ Qualification ML20196K2991999-01-0404 January 1999 Forwards Notice of Consideration of Approval of Transfer of Facility Operating License & Matl License & Opportunity for Hearing in Response to Application ML20202D0271998-12-15015 December 1998 Forwards Notice of Withdrawal of Application for Amend to License DPR-69.Proposed Change Would Have Modified Svc Water Head Tanks.Without Encl ML20198L3431998-12-12012 December 1998 Forwards Insp Repts 50-317/98-10 & 50-318/98-10 on 980706-10 & 1118.Insp Rept Documents App R Issues Which Constituted Violations of NRC Requirements.Nov Not Issued Because, Violations Identified by Licensee Staff as Part of C/A ML20198B1791998-12-10010 December 1998 Advises of Planned Insp Effort Resulting from Calvert Cliffs NPP Review Conducted on 981110.Details of Insp Rept for Next 6 Months & Historical Listing of Plant Issues Considered During Process Encl 1999-09-08
[Table view] |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ . . _ _
,
.
'
J AN 211993 Docket Nos. 50-317 and 50-318
- License Nos. DPR-53 and DPR-69 EA 92-168
.
. .
j Mr. Robert ; Vice President - Nuclear Energy ;
, Baltimore Gas and Electric Company \
l Calvert Cliffs Nuclear Power Plant i i 1650 Calvert Cliffs Parkway Lusby, Maryland 20657-4702
!
!
Dear Mr. Denton:
!
I i SU10ECT: NOTICE OF VIOLATION .
'
(Inspection Report Nos. 50-317/92-25 and 50-318/92-25) l l
This letter refers to the NRC inspection conducted between September 11, and October 3,1992, at the Calvert Cliffs Nuclear Power Plant. During the inspection, the inspectors reviewed the circumstances associated with two examples of a violation which occurred at Unit 1 involving l personnel entering posted high radiation areas (HRAs) without a radiation monitoring device as !
required. Both examples of the violation were identified by your staff and reported to the NRC.
The violation is described in the enclosed Notice of Violation. On December 2,1992, an enforcement conference was conducted with you and members of your staff to discuss both examples of the violation, the related root causes, and your corrective actions.
The first example of the violation occurred in August 1992 when four individuals, including a contractor containment coordinator, a contractor assistant coordinator, and two contractor
'
decontamination technicians, entered a posted HRA (the No.12 reactor coolant pump bay in the Unit I containment) to conduct a containment walkdown inspection without having a continuously indicating radiation monitoring device as required by the technical specifications.
(in addition, the individuais were not accompanied by a radiation safety technician (RST) who had such a device.) The containment coordinator apparently convinced the other three ;
individuals, after being questioned by one of them, that he was authorized to enter the area.
This constitutes a wi!!ful violation of NRC requirements since (1) the containment coordinator had signed the special work permit (SWP) which clearly prohibited entry to the area; (2) the Special Work Permit Coordinator (SWPC) informed the NRC that he had advised the .
containment coordinator not to ente. the area; and (3) a radiation safety technician (RST) at the containment access hatch informed the containment coordinator that no other RSTs were in containment.
CERTIFIED MAIL RETURN RECEIPT REOUESTED OFFICIAL RECORD COPY p:BG&E.NOV-9301260006 930121 ( ;
PDR ADOCK 05000317 ,
O PDR p
'
l )
L - . _-
>
_ _ _ _ . _ _ - _ _
. - ~ .
.
,
e k ': }
llaltimore Gas and Electric Company 2 i
!
The second example of the violation occurred in September 1992 when a Senior Reactor Operator (SRO) entered the Unit i volume control tank (VCT) room, a locked HRA, to conduct '
a valve position check, without having a continuously reading radiation monitoring device. The SRO had, on several occasions, operated a similar valve in Unit 2 that was not located in a U R A. In fact, on this occasion, the SRO mistakenly went to check the Unit 2 valve before reali/ing that he was supposed to check the corresponding valve in Unit 1. After proceeding back to Unit 1, the SRO entered the HRA, using a key issued to him as the shift supervisor assistant. When the SRO passed a Dashing strobe light, he realized that he had entered a HRA without an exposure rate meter and immediately left the room. _
The NRC recognizes that you took disciplinary action against the four individuals involved in the fint example. as well as the SRO involved in the second example. This action included permanent removal of access for the containment coordinator and the assistant coordinator, and suspensiin without pay of the two decontamination technicians and the SRO.
The NRC also recognizes that the safety consequences of the two examples of the violation were low since the dose rates in the specific areas entered within the posted HRA, were, at most,10 mrem /hr. Nonetheless, the NRC is concerned with (1) the willful nature of the Orst example of the violation by the containment coordinator; and (2) the fact that another Notice of Violation was issued in 1990 for three examples ofimproper entries to HRAs With respect to the August 1992 entry, although the containment coordinator was warned on at least one occasion concerning the need to have a radiation monitoring device before entering the area, the contauunent coordinator nonetheless entered the HRA and was influential in getting the other three individuals to enter the area. Such an entry could have resulted in the exposurc of the
~
individuals to unnecessary amounts of radiation during the walkdown if conditions had been ditferent than those assumed by that individual. Furthermore, willful violations at any severity les el are of significant concern to the NRC because the safe performance of activities at nuclear facilities depends not only on the ability, but also the integrity, of the individuals who conduct those activities.
Notwithstanding those concerns, the NRC considered exercising enforcement discretion and not taking any enforcement action against BG&E in this case because: (1) the apparent willful example of the violation involved the act of a non-supervisory individual without management involvement, and occurred despite warning given by BG&E staff which went unheeded by that individual; (2) both examples of the violation were identified by your staff and reported to the NRC, even though such reporting was not required; (3) you took appropriate corrective actions, including disciplinary action against the individuals; and (4) the violation, absent willfulness, would be classified no higher than at Severity Level IV. However, two instances of improper entries occurred involving five individuals within a relatively short period of time. A Notice of OFFICIAL RECORD COPY p:llG&E.NOV
,
.
_ _ _ _ _ _ _ _ _ _ _
--- - - . - - - - . . - . . - . - - . - . .
'
3N 211993 linttimore Gns and Electric Company 3 Violation was previously issued to you by the NRC in 1990 for three separate instances where -
HRAs were entered without the posting requirements being met. . The corrective actions taken in response to that violation in 1990, which included a site wide program to. address the event, revised general orientation training and a re-evaluation of HRA postings and boundaries, did not -
preclude these more recent occurrences in August and September 1992 Therefore, I have determined that enforcement discretion is inappropriate in this case, and a Notice of Violation is being issued for a Severity Level IV violation.
A civil penalty is norma!!y considered for willful violations at any severity level. I considered a penalty given the fact that it occurred despite warnings by members of your radiation protection staff. However, I have decided, after consultation with the Director of Enforcement, and the Deputy Executive Director for Nuclear Reactor Regulation, Regional Operations and Research, not to issue a civil penalty in this case. This decision was made after considering your investigation and reporting of the problem, as well as your prompt and comprehensive corrective actions taken subsequent to the identification of these occurrences.
For your information, in addition to the Notice of Violation, NRC is issuing a Demand for Information to the contactor containment coordinator in light of the willful nature of the violation and the fact that he was able to convince three other individuals to enter the area even though he was questioned regarding the appropriateness of such an entry.
You are required to respond to the enclosed Notice to this letter and should follow the_
instructions specified in that Notice when preparing your response. After reviewing your response to this Notice, including your proposed corrective actions and the results of future inspections, the NRC will determine whether further NRC enforcement action is necessary to ensure compliance with NRC regulatory requirements. In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice " a copy of this letter will be placed in the NRC's Public Document Room.
The responses directed by this letter and the enclosed Notice are not subject to the clearance procedures of the Office of Management and Budget as required by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.
Sincerely, Ori0 inal %ned ny:-
-u<, n
<-
Jaum S .y] l
, -
k,r)Regional Thomas T. Martin Administrator
\J Enclosure: Notice of Violation for Inspection Report Nos. 50-317/92-25 4 and 50-318/92-25 OFFICIAL RECORD COPY p:HG&E.NOV
,
-..
Italtimore Giis and Electric _ Company 4 cc w/ encl:
G. Detter, Director, Nuclear Regulatory Matters (CCNPP)
R. hiclean, Administrator, Nuclear Evaluations -
J. Walter, Engineering Division, Public Service Commission of Maryland ,
K. Burger, Esquire, Maryland People's Counsel R. Ochs, hlaryland Safe Energy Coalition -
'
K. Abraham, PAO-RI (2)
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of Maryland (2)
,
c
~
OFFICIAL RECORD COPY
p:BG&E.NOV
. _ .. . _ . _ _ _ .-
.
. .
.
Haltimore Gas and Electric Company 5 MSIN 21 DISTRIBUTION:
PDR SECY CA JSniezek, DEDR JLieberman, OE TMartin, RI JGoldberg, OGC TMurley, NRR JPartlow, NRR Enforcement Coordinators RI, Ril, Rill, RIV, RV FIngram, GPA/PA BHayes, OI VMiller, SP DWilliams, OIG EJordan, AEOD OE:Chron OE:EA DCS VMcCree, OEDO
. : Q%J R Co*PUL 81/(D/12 RI: RI: R M0M :D RI:RC j/
DHolody/mjc LNicholson CCdwgill M'hM W l KSmith.
12/h/92 12/7/92 12/7/92 2 1// 12// 92
RI:D j RI: lf
-
OE b ty DEDR
\ ane TN in JLi rm , Jg JSniezek 12/ /92 12/ 92 1h2,I h 12/ /92 OFFICIAL RECORD COPY a: PROP-CAL.ED