7O U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT
REGION IV
Report No. 50-313/77-25 Docket No. 50-313 License No. OPR-51 Licensee:
Arkansas Power & Light Company P. O. Box 551 Little Rock, Arkansas 72203 Facility Name:
Arkansas Nuclear One, Unit 1 Inspection At:
Arkansas Nuclear One Site, Russellville, Arkansas Inspection Conducted: December 20-22, 1977 Inspector:
I. [< 4/>AhN
/- 7 7 f:
T. F. Westerman, Reactor Inspector Date Approved By:,
e,[ h '
/-5 77 G. L. Maosen, Chief, Reactor Operations and Date Nuclear Support Branch Inspection Sumary
'
Inspection on December 20-22, 1977 (Report No. 50-313/77-25)
Areas Inspected: Routine, unannounced inspection of plant operations and preparation for refueling. The inspection involved 21 inspector-hours on-site by one inspector.
Results: Of the two (2) areas inspected, no items of noncompliance or deviations were identified in one area. One infraction was identified (para-graph 3.b(1)) in one area.
.
O G
O 80041401N
.
.
.
__ _ _ _
-. _ _
.
.
.
..
m
)
-2-DETAILS 1.
Persons Contacted
- B. A. Terwilliger, Supervisor Plant Operations
- T. N. Cogburn, Nuclear Engineer
- L. Alexander, Quality Control Engineer
- S. M. Strasner, Quality Control Inspector
- 8. Miller, Nuclear Engineer (Assistant)
G. Dupriest, Shift Supervisor
- J. Lowman, Assistant Instrumentation & Control Supervisor
.
- J. McWilliams, Planning & Scheduling
- Attended Exit Intervi s 2.
Preparation for Refueling a.
Inspection Scope The inspector reviewed the following procedures:
1503.02 Fresh Fuel Inspection and Storage
.
1506.03 Fresh Shipping Container Operations
.
N 1502.04 Refueling Shuffle
.
These procedures were examined for technical content and conformance to ANSI N18.7 and ANSI N45.2.2. The inspector reviewed the licensee's records for Cycle 3 fuel to determine receipt and inspection of the new fuel in accordance with the above identified licensee procedures. A total of 56 assemblies were received in shipments 166-01,166-02,166-03,166-04 and 166-05.
I b.
Inspection Findings
,
The inspector identified no items of noncompliance; however, the following open and/or unresolved items were identified:
(1)
Formal documentation of the inspection of the five assemblies from Cycle 1 is to be provided.
(0 pen Item OI7725-27)
(2)
Inspection of selected assemblies removed from the core is
'
-
to be provided.
(0 pen Item OI 7725-28)
(3)
Insertion of the dumy control rod to assure proper fit
'
is to be added to procedure 1503.02.
(0 pen Item OI 7725-29)
..
-
v
.
-
-
.
/9-3-b (4)
Inspector qualifications was identified as an item of noncompliance during Unit 2 inspection 50-368/77-21 and resolution of this item is in process.
(UnresolvedItem UI7725-30)
-(5)
The licensee has indicated that the acceptance criteria (i.e. visual standard followed) is to be clarified in procedure 1503.02. The inspection requirements to use the depth auge is to be deleted.
(Unresolved Item UI 7725-31 (6)
Procedure 1502.04 was incomplete.
(0 pen Item OI 7725-32)
(7)
The Vendor Certificates of Compliance for the Cycle 3 fuel was stated by the licensee to be on-site. However, the licensee was unable to locate the documentation during this l
inspection. This documentation will be reviewed during a l
subsequent inspection. The licensee did state that procedure 1503.02 will be modified to require verification i
of the receipt of Vendor Certificates of Compliance.
'
(UnresolvedItemUI 7725-33)
3.
Plant Operations a.
Inspection Scope The inspector reviewed the following shift logs and operating records:
Station Log (12/1-20/77)
.
NSS & Safeguard Auxiliary Log (12/1-20/77)
.
ESAS Shift Check Log (12/1-20/77)
.
.
RPS Log (12/1-20/77)
.
Operations Memorandum
,
.
Standing Orders
.
Jumper Bypass Log
.
Trouble Reports (0 pen)
.
The inspector conducted a tour of accessible areas and included
.
observaticns (as appropriate) of the following:
Monitoring Instrumentation
-
.
-
Radiation Controls
.
Plant Housekeeping Conditions
.
.
Fluid Leaks
.
Piping Vibrations
.
.
Pipe Hangers / Seismic Restraint
.
Selected Valve Position and Equipment Control Switches
.
Lockout Tags
.
p]
Lighted Annunciators
.
t Plant Tours
.
\\
Control Room Manning
.
..
- - -.
--
--
,
.
_
-
.
..
.
.
.
-4-b.
Inspection Findings (1)
The inspector identif+ad one apparent item of noncom-pliance as a result or :he review of the Jumper Bypass Log. The inspector found that four log entries (12/3/77)
relating to the Reactor Coolant Pump (RCP) standpipe level detectors had not been cleared following completion of recent maintenance on RCP seals. The licensee took corrective action to close the open entries. The incident was apparently isolated as the log entries had been filed out of sequence. The failure to properly close out the entries is contrary to Plant Procedure 1005.04, Rev. 3 (7/28/77), " Control and Use of Bypass and Jumpers," Section 6.1.6.
The failure to iciplement and maintain compliance with a procedure designated in Section A.10 of Regulatory Guide 1.33 is' contrary to Section 6.8.1 of the Technical Specifications.
The licensee was informed that based on the corrective
,
j action taken, no reply to this item of noncompliance j
would be required.
(2)
The inspector did bring to the licensee's attention O
that there was an apparent imbalance.in pressure between the computer room and the spent fuel pool
room. Air flow through the adjoining door is into the computer room. The spent fuel room is designated
,
a radiation control access area.
(0 pen Item OI 7725-34)
-(3)
The inspector also cliscussed with the licensee the
corrosion of the carbon steel studs installed in stain-less steel valves which are subject to boric acid. This item is being reviewed by the licensee.
(0 pen Item
,
OI7725-35)
'
4.
Unresolved Items
'
Unresolved items are matters about which more infonnation or actions by the licensee are necessary to ascertain whether they are acceptable items, items of noncompliance, or deviations. These items are identified in paragraph 2.b of this report.
,
.
5.
Exit Interview i -
An exit interview was conducted on December 22, 1977 following completion
'
of the inspection. At the interview the inspector discussed the findings indicated in the preceding paragraphs. The licensee acknowledged these findings.
- -
,
i i
-
_
.
-.
.