IR 05000313/1975008
| ML19319E537 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 07/05/1973 |
| From: | Moseley N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Phillips J ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML19319E535 | List: |
| References | |
| NUDOCS 8004110801 | |
| Download: ML19319E537 (3) | |
Text
.
.
...
,
..
$ # " '
p
,
UNITED STATES
/
Vg ATOMIC ENERGY COMMISSION
,
l l
,,e-DIRECTORATE OF REGULATORY OPERATIONS
l
-
.
g mEcion n - suite eis
,
f
,s a
230 P E AcHT R E E ST R E ET, NomT MwEST
,
9,L,,,,,,a
,,,,,,g,,,,,,
Itargg O'
AT L. ANT A, cEonce A 30303 In Reply Refer To:
Jllt.5 1973 RO:II:MSK 50-313/73-8
.
-
Arkansas Power and Light Comp ny Attn: Mr. J. D. Phillips Vice President and Chief Engineer Sixth and Pine Streets l
Pine Bluff, Arkansas 71601
!
!
Gentlemen This refers to the inspection conducted by Messrs. M. S. Kidd and K. W. Whitt of this office on June 12-15, 1973, of the activities authorized by AEC Construction Permit No. CPPR-57 for the Arkansas Nuclear One, Unit 1 facility, and to the discussions held with
.
Mr. G. H. Miller and other members of your staff at the conclusio,n of the inspection.
Areas examined during this inspection included previously identified outstanding items, preoperational test procedures, completed preopera-tional test results, your plans for implementing your zero power physics and power ascenrion test programs, functions of the Safety Review Conmittee, and procedures for operation. Within these areas, the inspection consisted of selective examination of procedures and representative records, interviews with plant personnel, and observa-tions by the inspectors.
t No violations or safety items were identified within the scope of this inspection.
Regarding discussions concerning inclusion of certain additional plant systems in the Unit 1 Final Safety Analysis Report Q-List, it is our imderstanding that you do I;;t plan to incorporate those systems into
,
the Q-List. This matter has been referred to our Headquarters for their review and evaluation. We will inform you of the results of this review and evaluation.
'l e
-
~).)'J J
-
-
nU 8004110
[
,
-
.-
- -,,
..
. _.
.
_ _ - -
'
'
.'
-
}
.
..
-
-
.
,
n
.
.
Arkansas Power and Light Co.
-2-JUL 5 hT13 A copy of the report of this inspection is enclosed. In accordance with
-
.
Section 2.790 of the AEC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the AEC's Public Document Room.
If this report contains any information that you believe to be proprietary, it is
,
-
necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application i
must include a full statement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so
,
that proprietary information identified in the application is contained in a separate part of the document.
If the report contains no inferma-
'
tion which you believe to be proprietary, please inform us in writing within 20 days to this effect.
In such case, the report, as enclosed with this letter, will be placed in the Public Document Room.
Should you have any questions cor.cerning this letter: you may connunicate i
directly with this office.
- Very truly yours,
-
l
/
.,
'
pyrci,s G
~
Norman C. Moseley Director
~
Enclosure:
.
Inspection Report No.
50-313/73-8
,
.
-
O
+
'
.
p
., - -r
,e
,
v-r<
- -
- -.
_.. _. - -. _ -..
..
-. - - - -... _ _ - _.
.
....._
--
-
. - - _. -. _ _ - _.
.
._
.
.
...
~
.,.
.
.
..
.
.
i
-
.
.
-
.
.
l Ltr to Arkansas Power and Light Company
}
dtd JUL 5 1973
!
'
l
I cc w/ encl:
}
K. D. Thornburg, RO i
- HQ (h)
-
l Directorate of Licensing (h)
!
DR Central Files
!
.
f cc w/o enc 1:
+
l
.
t PDR
'
!
Local PDR
!
NSIC l
'
i DTIE, OR
State
!
,
i
.
,
-
I
f
.
.
!
-
.
.
}
'
.
,
%
l
}
}
l
-
t e
.
.
.
..
.
..
..__,_____.___:.;______._.,_..._..
...
.i
..
......
_.. _ _, _., _.. _, _
_-