Annual Assessment Letter - Browns Ferry (IR 05000259-08-001, 05000260-08-001 & 05000296-08-001)
ML080630640
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 03/03/2008
From: Mccree V
Region 2 Administrator
To: Campbell W
Tennessee Valley Authority
References
IR-08-001
Download: ML080630640 (9)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION II

rch 3, 2008

SUBJECT:

ANNUAL ASSESSMENT LETTER - BROWNS FERRY NUCLEAR PLANT (NRC INSPECTION REPORT 05000259/2008001, 05000260/20008001 AND 05000296/2008001)

Dear Mr. Campbell:

On February 7, 2008, the NRC staff completed its performance review of the Browns Ferry Nuclear Plant. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only-Security-Related Information" will include the security cornerstone review and resultant inspection plan.

Overall, Browns Ferry Units 1, 2, and 3 operated in a manner that preserved public health and safety and met all cornerstone objectives with moderate degradation in safety performance.

Unit 1 plant performance for the most recent quarter was within the Degraded Cornerstone column of the NRC=s Action matrix based on exceeding the Yellow threshold in the Initiating Events Cornerstone under the Unplanned Scrams per 7000 Critical Hours PI. Unit 1 resumed operation on May 22, 2007 and was within the Licensee Response column of the NRC=s Action matrix for the second and third quarters of the assessment cycle. Based on guidance in Inspection Manual Chapter 0305 and outlined in a letter to your staff dated December 6, 2007, the Unplanned Scrams per 7000 Critical Hours PI became valid beginning the fourth quarter of 2007. Due to the number of scrams and the limited number of critical hours, the Unplanned Scrams per 7000 Critical Hours PI became valid within the Yellow threshold during the fourth quarter of the assessment cycle.

When we have been notified by your staff of your readiness, the NRC will conduct a supplemental inspection for Unit 1 using Inspection Procedure 95002, Inspection For One Degraded Cornerstone Or Any Three White Inputs In a Strategic Performance Area, in addition to routine reactor oversight program (ROP) baseline inspections.

Units 2 and 3 Plant performance for the most recent quarter, as well as for the first three quarters of the assessment cycle, were within the Licensee Response column of the NRC=s

TVA 2 Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green).

Additionally, the staff identified that there were more than 3 Green inspection findings for the current 12-month assessment period with documented cross-cutting aspects in the area of Problem Identification and Resolution (PI&R), and that there is a cross-cutting theme in the aspect of appropriate and timely corrective action (P.1(d)) associated with these findings. In evaluating your scope of efforts and progress in addressing the cross-cutting theme, the staff determined that a substantive cross-cutting issue exists in the area of PI&R. The NRC staff plans to continuously monitor the affected aspect as a focal point during routine resident inspector baseline inspections, as well as, perform a focused baseline inspection of your Corrective Action Program, assess your efforts to ensure effective and timely corrective action in the semi-annual trend review of the Corrective Action Program, and increase the PI&R annual sample reviews to the maximum allowed per inspection procedure 71152. Additionally, the biennial PI&R inspection, originally planned for 2009, has been re-scheduled for October 2008.

This substantive cross-cutting issue can be cleared if your corrective actions in this affected area show evidence of effectiveness during the 2008 inspection period; as demonstrated by no new Greater-than-Green findings with the same cross-cutting aspect, a small number of new Green findings that are examples of the same common theme, and evidence of improvement as described in the Browns Ferry Turn Around Plan and the corrective action trend Problem Evaluation Report 136489.

The enclosed inspection plan details the inspections, less those related to security, scheduled through June 30, 2009. We also plan on conducting non-ROP inspection TI2515/171, Verification of Site Specific (B.5.b) Phase 2 and 3 Mitigation Strategies. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

TVA 3 If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Rebecca Nease at 404-562-4530 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Victor M. McCree, Acting Regional Administrator Docket Nos.: 50-259, 50-260, 50-296 License Nos.: DPR-33, DPR-52, DPR-68 Enclosure: Browns Ferry Inspection/Activity Plan (03/01/08 - 06/30/09)

cc w/encl: (See next page)

_________________________

OFFICE RII:DRP RII:DRP RII::DRP RII:ORA SIGNATURE /RA/ /RA/ /RA/ /RA ByVMcCree/

NAME JBaptist RNease JShea CCasto DATE 3/3/08 3/3/08 3/3/08 3/3/08 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO

TVA 4 cc w/encl.:

Ashok S. Bhatnagar Larry E. Nicholson Senior Vice President General Manager Nuclear Generation Development and Performance Improvement Construction Tennessee Valley Authority Tennessee Valley Authority 3R Lookout Place Electronic Mail Distribution 1101 Market Street Chattanooga, TN 37402-2801 William R. Campbell, Jr.

Chief Nuclear Officer and Executive Vice Michael A. Purcell President Senior Technical Advisor Tennessee Valley Authority Nuclear Power Group 6A Lookout Place Tennessee Valley Authority 1101 Market Street 4X Blue Ridge Chattanooga, TN 37402-2801 1101 Market Street Chattanooga, TN 37402-2801 James R. Douet Vice President H. Rick Rogers Nuclear Support Vice President Tennessee Valley Authority Nuclear Engineering and Technical Electronic Mail Distribution Services Tennessee Valley Authority Steven M. Douglas Electronic Mail Distribution General Manager Browns Ferry Site Operations Michael D. Skaggs (WB2)

Tennessee Valley Authority Site Vice President Electronic Mail Distribution Browns Ferry Nuclear Plant Tennessee Valley Authority D. T. Langley Electronic Mail Distribution Manager Licensing and Industry Affairs Beth A. Wetzel Tennessee Valley Authority Manager P.O. Box 2000 Corporate Nuclear Licensing and Industry Decatur, AL 35609 Affairs Tennessee Valley Authority John C. Fornicola Electronic Mail Distribution General Manager Nuclear Assurance Senior Resident Inspector Tennessee Valley Authority Browns Ferry Nuclear Plant Electronic Mail Distribution U.S. NRC 10833 Shaw Road General Counsel Athens, AL 35611-6970 Tennessee Valley Authority Electronic Mail Distribution cc contd - See next page

TVA 5 cc contd Chairman Limestone Couty Commission 310 West Washington Street Athens, AL 35611 State Health Officer Alabama Dept. of Public Health RSA Tower - Administration Suite 1552 P.O. Box 303017 Montgomery, AL 36130-3017 Dr. D. E. Williamson State Health Officer Alabama Dept. of Public Health Electronic Mail Distribution

TVA 6 Letter to William R. Campbell, Jr. from Victor M. McCree dated March 3, 2008 SUBJECT: ANNUAL ASSESSMENT LETTER - BROWNS FERRY NUCLEAR PLANT NRC INSPECTION REPORT 05000259/2008001, 05000260/20008001 AND 5000296/2008001 E. Brown, NRR L. Raghavan, NRR C. Evans, RII EICS (Part 72 Only)

L. Slack, RII EICS OE Mail (email address if applicable)

RIDSNRRDIRS PUBLIC

Page 1 of 2 BF 03/03/2008 06:33:16 Inspection / Activity Plan Report 22 03/01/2008 - 06/30/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL EXAM - INITIAL EXAM 3 1 V23278 BROWNS FERRY/FEBRUARY 2008 EXAM AT POWER FACILITIES 02/25/2008 03/07/2008 Not Applicable EB3-ISI - UNIT 3 - ISI 1 3 IP 7111108G Inservice Inspection Activities - BWR 03/24/2008 03/28/2008 Baseline Inspections PSB1-RP - RAD PROTECTION - ACCESS CONTROLS 1 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 03/31/2008 04/04/2008 Baseline Inspections 1, 2, 3 IP 71151-OR01 Occupational Exposure Control Effectiveness 03/31/2008 04/04/2008 Baseline Inspections PSB1-EP - EP INSP 1 1, 2, 3 IP 7111402 Alert and Notification System Testing 06/02/2008 06/06/2008 EP Baseline Inspection 1, 2, 3 IP 7111403 Emergency Response Organization Augmentation Testing 06/02/2008 06/06/2008 EP Baseline Inspection 1, 2, 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 06/02/2008 06/06/2008 EP Baseline Inspection 1, 2, 3 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 06/02/2008 06/06/2008 EP Baseline Inspection 1, 2, 3 IP 71151-EP01 Drill/Exercise Performance 06/02/2008 06/06/2008 Baseline Inspections 1, 2, 3 IP 71151-EP02 ERO Drill Participation 06/02/2008 06/06/2008 Baseline Inspections 1, 2, 3 IP 71151-EP03 Alert & Notification System 06/02/2008 06/06/2008 Baseline Inspections PSB1-RP - RADIATION PROTECTION PUBLIC BASELINE 3 1, 2, 3 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 06/02/2008 06/06/2008 Baseline Inspections 1, 2, 3 IP 7112201 Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems 06/02/2008 06/06/2008 Baseline Inspections 1, 2, 3 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 06/02/2008 06/06/2008 Baseline Inspections 1, 2, 3 IP 71151-PR01 RETS/ODCM Radiological Effluent 06/02/2008 06/06/2008 Baseline Inspections TI-171 - B.5.B PHASE 2&3 3 1, 2, 3 IP 2515/171 Verification of Site Specific Implementation Of B.5.b Phase 2 & 3 Mitigating Strategies 06/16/2008 06/20/2008 Generic Safety Inspection PI&R - PREP TRIP-PROBLEM ID AND RESOL 1 1, 2, 3 IP 71152B Identification and Resolution of Problems 08/18/2008 08/22/2008 Baseline Inspections PI&R - PROBLEM IDENTIFICATION & RESOLUTION 6 1, 2, 3 IP 71152B Identification and Resolution of Problems 09/29/2008 10/03/2008 Baseline Inspections 1, 2, 3 IP 71152B Identification and Resolution of Problems 10/13/2008 10/17/2008 Baseline Inspections EB3ISI - U1 ISI 1 1 IP 7111108G Inservice Inspection Activities - BWR 11/03/2008 11/07/2008 Baseline Inspections OL EXAM - INITIAL EXAM PREP 3 1 V23303 BROWNS FERRY/DECEMBER 2008 EXAM AT POWER FACILITIES 11/17/2008 11/21/2008 Not Applicable OL RQ - REQUAL INSPECTION 2 1, 2, 3 IP 7111111B Licensed Operator Requalification Program 12/01/2008 12/05/2008 Baseline Inspections OL EXAM - INITIAL EXAM - WEEK 1 3 1 V23303 BROWNS FERRY/DECEMBER 2008 EXAM AT POWER FACILITIES 12/08/2008 12/12/2008 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 BF 03/03/2008 06:33:16 Inspection / Activity Plan Report 22 03/01/2008 - 06/30/2009 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type OL EXAM - INITIAL EXAM - WEEK 2 3 1 V23303 BROWNS FERRY/DECEMBER 2008 EXAM AT POWER FACILITIES 12/15/2008 12/19/2008 Not Applicable PSB1-RP - RAD PROTECTION PRE-INSPECTION VISIT 1 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 01/26/2009 01/30/2009 Baseline Inspections PSB1-RP - RADIATION PROTECTION OCCUPATIONAL WK1 3 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 03/02/2009 03/06/2009 Baseline Inspections 1, 2, 3 IP 7112102 ALARA Planning and Controls 03/02/2009 03/06/2009 Baseline Inspections 1, 2, 3 IP 7112202 Radioactive Material Processing and Transportation 03/02/2009 03/06/2009 Baseline Inspections 1, 2, 3 IP 71151-OR01 Occupational Exposure Control Effectiveness 03/02/2009 03/06/2009 Baseline Inspections 1, 2, 3 IP 71151-PR01 RETS/ODCM Radiological Effluent 03/02/2009 03/06/2009 Baseline Inspections PSB1-RP - RADIATION PROTECTION OCCUPATIONAL WK2 2 1, 2, 3 IP 7112101 Access Control to Radiologically Significant Areas 03/16/2009 03/20/2009 Baseline Inspections 1, 2, 3 IP 7112102 ALARA Planning and Controls 03/16/2009 03/20/2009 Baseline Inspections 1, 2, 3 IP 7112202 Radioactive Material Processing and Transportation 03/16/2009 03/20/2009 Baseline Inspections 1, 2, 3 IP 71151-OR01 Occupational Exposure Control Effectiveness 03/16/2009 03/20/2009 Baseline Inspections 1, 2, 3 IP 71151-PR01 RETS/ODCM Radiological Effluent 03/16/2009 03/20/2009 Baseline Inspections OL EXAM - INITIAL EXAM - PREP 3 1 V23304 BROWNS FERRY/MAY 2009 EXAM AT POWER FACILITIES 04/27/2009 05/01/2009 Not Applicable EB3ISI - UNIT 2 ISI 2 2 IP 7111108G Inservice Inspection Activities - BWR 05/04/2009 05/08/2009 Baseline Inspections OL EXAM - INITIAL EXAM - WEEK 1 3 1 V23304 BROWNS FERRY/MAY 2009 EXAM AT POWER FACILITIES 05/11/2009 05/15/2009 Not Applicable OL EXAM - INITIAL EXAM - WEEK 2 4 1 V23304 BROWNS FERRY/MAY 2009 EXAM AT POWER FACILITIES 05/18/2009 05/22/2009 Not Applicable PSB1EP - EP EXERCISE 3 1, 2, 3 IP 7111401 Exercise Evaluation 06/08/2009 06/12/2009 EP Baseline Inspection 1, 2, 3 IP 7111404 Emergency Action Level and Emergency Plan Changes 06/08/2009 06/12/2009 EP Baseline Inspection 1, 2, 3 IP 71151-EP01 Drill/Exercise Performance 06/08/2009 06/12/2009 Baseline Inspections 1, 2, 3 IP 71151-EP02 ERO Drill Participation 06/08/2009 06/12/2009 Baseline Inspections 1, 2, 3 IP 71151-EP03 Alert & Notification System 06/08/2009 06/12/2009 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.