IR 05000293-06-011; Pilgrim Nuclear Power Station; Ti 2515/168
ML063000362
Person / Time
Site: Pilgrim
Issue date: 10/25/2006
From: Racquel Powell
NRC/RGN-I/DRP/PB5
To: Balduzzi M
Entergy Nuclear Operations
References
IR-06-011
Download: ML063000362 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION ber 25, 2006

SUBJECT:

PILGRIM NUCLEAR POWER STATION - NRC INSPECTION REPORT 05000293/2006011

Dear Mr. Balduzzi:

On September 30, 2006, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Pilgrim Nuclear Power Station. The enclosed inspection report documents the inspection results, which were discussed on September 28, 2006, with Mr. S. Bethay and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

No findings of significance were identified.

In accordance with 10 CFR 2.390 and the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system, ADAMS. ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (The Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

WARNING: Violation of Section 147, Safeguards Safeguards information determination made by:

Information, of the Atomic Agency Act is subject Name/Title Barry C.Westreich, Chief to civil and criminal penalties. Organization NSIR/DNS/SOS Basis 2/25/02 NRC Order Signature /RA/

Date 5/12/06 M. In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21.

Sincerely,

/RA/

Raymond J. Powell, Chief Projects Branch 5 Division of Reactor Projects Docket No. 50-293 License No. DPR-35 Enclosure: NRC Inspection Report 05000293/2006011 ( )

cc w/o encl:

K. Bronson, General Manager B. Ford, Manager, Licensing cc w/encl; w/SGI:

F. Marcussen, Protective Services Manager J. Giarrusso, State Liaison Officer/Security Advisor, Commonwealth of Massachusetts