SUBJECT:
PILGRIM -IOCE-ON-FORC INSPECTION REPORT 05000293/2005201
Dear Mr. Balduzzi:
On July 29, 2005, the US Nuclear Regulatory Commission (NRC) completed alf7rce-on-force6 team inspection at the Pilgrim Nuclear Power Station. The enclosed inspection report documents the inspection results, which were discussed on July 29, 2005, with you and other members of your staff.
The inspection examined activities under your license as they relate to physical security and compliance with the Commission's rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
W Violation of S
'on 147 of the.
At n
Act, "Saf s Infora Safe ds Info-eernin made b y:
i subject t ivil and
enalti
!--
r Ennrmaio ino thiseuadsf recordn.~o wasval deete in accordance with the Freedom of Informatio.n QUA Act, exemptions
'2' The material enclosed herewith contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended. In addition, this letter contains sensitive information as defined in 10 CFR 2.390. As such, neither this letter nor the enclosure will be made available in hard copy or electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the Agency-Wide Documents Access and Management System (ADAMS).
Should you have any questions concerning this letter, please contact Mr. Ronald J. Albert of my staff at (301) 415-6692.
iSinc "
/
en
_ctor
, alph ay.,DepuDeco
- 1*ucl S*curity peraions Division of Nuc ar Sec ity Office of Nucl r Securi and Incident Response Docket No.:
50-293 License No.: DPR-35 Enclosure:
NRC Inspection Report No. 05000293/2005201 cc w/ enclosure:
Edward A. Flynn Secretary, Executive Office of Public Safety 1 Ashburton Room 2133 Boston, MA 02133 Christine McCombs Massachusetts Emergency Management Agency 400 Worchester Road Framingham, MA 01701
-3-cc w/o encl:
John M. Fulton General Counsel Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 Chris Kelly Security Director Entergy Nuclear Operations, Inc.
1340 Echelon Parkway, 5t' Floor Jackson, MS 39213 Bryan Ford Licensing Manager Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 I Fred Marcussen Security Manager Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 S/1 ENGWýg 1 0 Rýp
U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR SECURITY AND INCIDENT RESPONSE (NSIR)
Report Nos.:
Licensee:
Facility:
Location:
Dates:
I Inspectors:
CAF Members:
lot-Approved by:
05000293/2005201 Entergy Nuclear Generation Company Pilgrim Nuclear Power Station Plymouth, MA June 28 - 30, 2005 and July 26 - 29, 2005 R. John Vanden Berghe, Team Leader, NSIR David R. Bradfield, Security Specialist, NSIR Carl Grigsby, Security Specialist, NSIR Vincent KIco, Reactor Engineer, NSIR Greg Smith, Physical Security Inspector, R-I Joseph Anderson, Emergency Preparedness Specialist, NSIR NRC Contractors (2)
RonaldJ. Alb ertihief Security Performance Evaluation Section Division of Nuclear Security, NSIR Enclosure S$5yoldlýR
ýMl
r, SUMMARY OF FINDINGS IR 05000293/2005201; 06J28-30/2005 and 07/26-29/2005; Pilgrim Nuclear Power Station; Contingency ResponseA Force-on-Forc
'esting, Inspection Procedure t1 130.0Q, The report covered an announced rce-on-forcqnspection by a team of inspectors from the Office of Nuclear Security andIncident Response (NSIR) and Reaion I. The inspectors were
~-,
L7 f
ýýf<
'ýMXAh* lwwmoý
Report Details 3.
SAFEGUARDS Cornerstone: Physical Protection (PP)
3PP3 Contingency Response - Force-on-Force Testing 3.1 Entrance Briefing a.
Scope The inspectors met with licensee management and conducted an Entrance Briefing. The team leader conducted appropriate introductions; provided the inspection number, and identified the applicable inspection procedure and the duration of the inspection; presented key areas to be.jspected and discussed W
"idnfe*tf te number hMesponders to be used for I-exercises; explained thie trSted agent process; explained that exercises would be conducted with the full knowledge of a licensee manager; explained the significance determination process and enforcement; established a licensee point of contact and confirmed a schedule of inspections activities; and established a date and time for the Exit Meeting.
b.
Summary On June 28, 2005, the team leader presented the inspection scope and planned inspection activities to Mr. Robert Smith, Engineering Director and Acting Site Vice President, and members of the licensee staff.
3.2 Management Overview of Protective Strategy and Associated Policies a.
3