IR 05000287/1974005
| ML19317F228 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 05/16/1974 |
| From: | Moseley N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Thies A DUKE POWER CO. |
| Shared Package | |
| ML19317F223 | List: |
| References | |
| NUDOCS 8001080941 | |
| Download: ML19317F228 (2) | |
Text
- _ - _ _
_ __ _ _ ____ _ __ ____ __-
,
.
- '
',
.
.g.
o9
^ N; '
.A J,',;O INE;iC-Y COS'.M:CSK N
'
,
,
.., pw '. '
v..; N.l; 9: o'u.
a
.Y N'.:i%'3 ' C
' f, j ute..c,s n.
,o. : i m e.
--
,
\\'Q.M ' jO
. r.
c..c n u.: n t t. '. " r " a U '
..
,........
e.
.e.-
?:.~- *
ra aa n, s.. a.m. s.' n
, ~ ~...
'In Reply Refer To:
MAY 10 54 RO:II:RCP 50-287/74-5
'
.
Duke Power Company ATTN:
Mr. A. C. Thies Senior Vice President Production and Transmission Power Building 422 South Church Street
'
Charlotte, North Carolina 28201 Gentlemen:
This refers to the inspection conducted by Messrs. R. C. Lewis, R. C. Parker, and K. W. Whitt of this office on April 29 - May 2, 1974, of the implementa-tion of the quality assurance program for operation of the Oconee Nuclear Plant, Unit 3 facility, and to the discussions of our findings held by Mr. Lewis with Messrs. Smith, Barbour, and Holt at the conclusion of the inspection.
The purpose of this inspection was to make a determination through in-depth inspections whether your quality assurance program has been or would be satisfactorily implemented prior to licensing for those quality affecting activities associated with the inicial fuel load and startup and operation of the plant. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspectors.
Within the scope of this inspection, no violations were disclosed.
-
Significant deficiencies in the implementation of your quality assurance program for operations, as described in your FSAR, and in Duke Power Company letters to the Directorate of Licensing, AEC, dated April 27, 1973, and July 31, 1973, were detected and are identified in Section III of the summary of the enclosed report as unresolved items.
Duke Power Company will be required to 'have a satisfactory QA program for operations implemented prior to Licensing. Guidance with regard to acceptable methods for implementation of your QA program for operations can be found in appropriate Regulatory Guides and national standards.
Implementation of your operational quality assurance program will be reinspected during subsequent prelicensing inspections.
.
pg 8001080
..
.
~oa
.
Duke Power Company-2-
.
ggy ) g 1g74
-
In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the AEC's Public Docu=ent Room.
If this report contains any information that you believe to be proprietary, it is necessary that you submit a written application to this office requesting that such information be withheld from public disclosure.
If no proprietary information is identified, a written statement to that effect should be submitted.
If an application is submitted, it must fully identify the bases for which information is claimed to be proprietary. The application should be prepared so that information sought to be withheld is incorporated in a separate paper and referenced in the application since the application will be placed in the Public Document Room.
Your application, or written statement, should be submitted to us within 20 days.
If we are not contacted as specified, the enclosed report and this letter may then be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss them with you.
Very truly yours,
.
- ?
/:,i
/
h
,g
,c:,d
/8'N
,./l/NormanC.Moseley
/
Director Enclosure:
RO Inspection Report No.
50-287/74-5