January 15, 2019
SUBJECT:
INDIAN POINT NUCLEAR GENERATING - DESIGN BASES ASSURANCE INSPECTION (TEAMS) REPORT 05000247/2018010 AND 05000286/2018010
Dear Mr. Vitale:
On November 8, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed the onsite portion of an inspection at Indian Point Nuclear Generating, Units 2 and 3. On November 8, 2018, the NRC inspectors discussed the preliminary results of this inspection with you and other members of your staff. After additional review of specific items, the team discussed the final results of this inspection with you and other members of your staff on January 14, 2018. The results of this inspection are documented in the enclosed report.
NRC inspectors did not identify any finding or violation of more than minor significance.
This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRCs Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Mel Gray, Chief Engineering Branch 1 Division of Reactor Safety
Docket Numbers: 50-247 and 50-286 License Numbers: DPR-26 and DPR-64
Enclosure:
Inspection Report 05000247/2018010 and 05000286/2018010
Inspection Report
Docket Numbers:
50-247 and 50-286
License Numbers:
Report Numbers:
05000247/2018010 and 05000286/2018010
Enterprise Identifier:
I-2018-010-0036
Licensee:
Entergy Nuclear Northeast (Entergy)
Facility:
Indian Point Nuclear Generating, Units 2 and 3
Location:
Buchanan, NY 10511-0249
Inspection Dates:
October 29, 2018 through November 8, 2018
Inspectors:
K. Mangan, Senior Reactor Inspector, Division of Reactor Safety
(DRS), Team Leader
S. Pindale, Senior Reactor Inspector, DRS
J. Brand, Reactor Inspector, DRS
M. Orr, Reactor Inspector, DRS
C. Hobbs, Reactor Inspector, DRS
S. Kobylarz, NRC Electrical Contractor
C. Baron, NRC Mechanical Contractor
Approved By:
Mel Gray, Chief
Engineering Branch 1
Division of Reactor Safety
SUMMARY
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring Entergys performance at Indian Point Nuclear Generating, Units 2 and 3 by conducting a design bases assurance inspection in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors.
Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
No findings or more-than-minor violations were identified.
INSPECTION SCOPES
This inspection was conducted using the appropriate portions of the inspection procedure in effect at the beginning of the inspection unless otherwise noted. Currently approved inspection procedures with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
Samples were declared complete when the inspection procedure requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase. The team reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
REACTOR SAFETY
===71111.21M - Design Bases Assurance Inspection (Teams)
The team evaluated the following components, permanent modifications, and operating experience during the weeks of October 29, 2018, and November 5, 2018.
For the components, the team reviewed the attributes listed in Inspection Procedure 71111.21M, Appendix A, Component Review Attributes, such as those listed below.
Specifically, the team evaluated these attributes as per 71111.21M, Appendix B, Component Design Review Considerations and 71111.21M, Appendix C, Component Walkdown Considerations.
Components===
Unit 3 Component Cooling Water Pump (CCP 32)
o Material condition and installed configuration (e.g., visual inspection/walkdown)o Normal, abnormal, and emergency operating procedures o Consistency among design and licensing bases and other documents/procedures o System health report, maintenance effectiveness and records, and corrective action history o Design calculations o Surveillance testing and recent test results
The team used Appendix B guidance for Valves, Instrumentation, Electric Loads, and As-Built System.
Unit 2 480 VAC MCC 26A o Material condition and installed configuration (e.g., visual inspection/walkdown)o Normal, abnormal, and emergency operating procedures o Consistency among design and licensing bases and other documents/procedures o System health report, maintenance effectiveness and records, and corrective action history o Control logic o Design calculations o Surveillance testing and recent test results o Equipment protection (sealing of cable and conduits)o Environmental conditions o Protection coordination; Load in-rush and full load current o Equipment protection from fire, flood, and water intrusion or spray
The team used Appendix B guidance for Instrumentation, Circuit Breakers and Fuses, Cables, Electric Loads, and Motor Control Centers (MCCs).
Unit 3 Containment Sump Recirculation Valve SI-MOV-885B
o Material condition and installed configuration (e.g., visual inspection/walkdown)o Normal, abnormal, and emergency operating procedures o Consistency among design and licensing bases and other documents/procedures o System health report, maintenance effectiveness and records, and corrective action history o Equipment/environmental controls and qualification o Operator actions o Design calculations o Surveillance testing and recent test results o Equipment protection (sealing of cable and conduits)o Equipment protection from fire, flood, and water intrusion or spray
The team used Appendix B guidance for Valves, Instrumentation, Cables, Electric Loads, and As-Built System.
Unit 3 125 VDC Bus 31
o Material condition and installed configuration (e.g., visual inspection/walkdown)o Normal, abnormal, and emergency operating procedures o Consistency among design and licensing bases and other documents/procedures o System health report, maintenance effectiveness and records, and corrective action history o Operator actions o Design calculations o Surveillance testing and recent test results o Environmental conditions o Contactor and fuse ratings; Component adequacy for minimum voltage o Equipment protection from fire, flood, and water intrusion or spray o Ventilation
The team used Appendix B guidance for Instrumentation, Circuit Breakers and Fuses, Cables, Electric Loads, and As-Built System.
Unit 3, Turbine Driven Auxiliary Feedwater Pump 32
o Material condition and installed configuration (e.g., visual inspection/walkdown)o Normal, abnormal, and emergency operating procedures o Consistency among design and licensing bases and other documents/procedures o System health report, maintenance effectiveness and records, and corrective action history o Design calculations o Surveillance testing and recent test results
The team used Appendix B guidance for Valves, Instrumentation, Electric Loads, and As-Built System.
Unit 3 Emergency Diesel Generator 31
o Material condition and installed configuration (e.g., visual inspection/walkdown)o Normal, abnormal, and emergency operating procedures o Consistency among design and licensing bases and other documents/procedures o System health report, maintenance effectiveness and records, and corrective action history o Design calculations o Surveillance testing and recent test results o System and component level performance monitoring o Range, accuracy, and setpoint of installed instrumentation o Equipment protection from fire, flood, and water intrusion or spray o Heat removal cooling water and ventilation o Energy sources, fuel and air (e.g., engine start, operation, and control)
The team used Appendix B guidance for Valves, Pumps, Instrumentation, Electric Loads, and As-Built System.
Unit 2 Emergency RWST to Charging Make-up Valve LCV-112B
o Material condition and installed configuration (e.g., visual inspection/walkdown)o Normal, abnormal, and emergency operating procedures o Consistency among design and licensing bases and other documents/procedures o Corrective maintenance records and corrective action history o Design basis review at the system and component levels including AOV capability calculations o Surveillance testing and recent test results
The team used Appendix B guidance for Valves, Instrumentation, Electric Loads, and As-Built System.
Component, Large Early Release Frequency (1 Sample)
Unit 2 Safety Injection Accumulator Tank 23
o Normal, abnormal, and emergency operating procedures o Consistency among design and licensing bases and other documents/procedures o System health report, maintenance effectiveness and records, and corrective action history o Operator actions o Design calculations o Surveillance testing and recent test results
The team used Appendix B guidance for Valves, Instrumentation, and As-Built System.
Permanent Modifications (6 Samples)
EC 18294, IP2 Flow Control Valve AFW Minimum Flow Increase
EC 66581, Essential SW Header Flow Balance to Increase Flow to the FCUs
EC 63883, Replace Containment Recirculation Fan Motor Cooler 22 Outlet Manual Throttle Valve SWN-71-2C
EC-059987, IPEC Unit 2, Replace FC-406A, FC-406B, FC-406C, AND FC-406D Yokogawa Controllers with NUS PIDA 700 Series Controllers
EC 77652, EC to make EC 75844 for the 24 SWP transfer switch disconnect replacement permanent
EC 69703, Replace Air Regulator on Valve SWN-TCV-1104
Operating Experience (4 Samples)
NRC Information Notice 2014-04, Potential for Teflon Material Degradation in Containment Penetrations, Mechanical Seals and Other Components, dated March 26, 2014
NRC Information Notice 2015-05, Inoperability of Auxiliary and Emergency Feedwater Auto-Start Circuits on Loss of Main Feedwater Pumps, dated May 12, 2015
NRC Information Notice 2013-18, Refueling Water Storage Tank Degradation, dated September 13, 2013
NRC Information Notice 2013-06, Corrosion in Fire Protection Piping due to Air and Water Interaction, dated March 25,
EXIT MEETINGS AND DEBRIEFS
The team verified no proprietary information was retained or documented in this report.
On November 8, 2018, the team presented the Design Bases Assurance Inspection (Teams)preliminary results to Mr. Anthony Vitale, Site Vice President, and other members of Entergy staff. The team subsequently discussed the final results of this inspection with Mr. Anthony Vitale, Site Vice President, and other Entergy staff on January 14, 2019.
DOCUMENTS REVIEWED
71111.21M - Design Bases Assurance Inspection (Teams)
Calculations
1859829-C-002, Seismic Weak Link Thrust Calculation for MOVs SI-MOV-885A/B, Revision 0
A14332-C-001, Assessment of A-D Stem/Wedge Pin in Connection with Flowserve Part 21,
2/9/15
FEX-00021, 118 VAC Instrument Bus Loading and Voltage Drop Calculation for Instrument
Buses 23 & 23A, Revision 2
FEX-00022, 118 VAC Instrument Bus Loading and Voltage Drop Calculation for Instrument
Buses 24 & 24A, Revision 2
FEX-00130, IP2 Short Circuit Analysis of the Electrical Distribution System, Revision 0
FEX-00143, IP2 Load Flow Analysis of the Electrical Distribution System, Revision 1
FEX-00204, Station Battery 22 System Calculation, Revision 1
FIX-00004, Motor Driven AFW Pump Flow Loop Accuracy, Revision 2
IP3-CALC-ED-00207, 480V Buses 2A, 3A, 5A & 6A and EDGs 31, 32, and 33 Accident
Loading, Revision 8
IP3-CALC-ED-02563, Station Battery Hydrogen Evolution, Revision 4
IP3-CALC-EL-00184, Station Battery 31 System Calculation, Revision 4
IP3-CALC-EL-00186, Station Battery 33 System Calculation, Revision 5
IP3-CALC-SI-01098, Thrust and Torque Limits Calculation for SI-MOV-885B - GL-89-10 MOV
Program Thrust, Revision 4
IP3-CALC-STR-03178, Evaluation of Spem Fuel Pool Heat Exchanger in the FSB for Tornado
Missiles, Revision 0
IP-CALC-1 2-00089, Indian Point Unit 3 CCW System FATHOM Model Development,
Revision 0
IP-CALC-12-00090, Indian Point Unit 3 FATHOM CCW System Thermal Hydraulic Analysis,
Revision 0
IP-CALC-16-00017, Control Building Isolation Qualification of Switchgear Room to Turbine
Building Doors Under HELB Pressure Loading, Revision 0
IP-CALC-17-00007, End Connection Reduction Effects due to Air Regulator Replacement on
SWN-TCV-1104, Revision 0
IP-CALC-18-00002, Environmental Conditions Following a Turbine Building High Energy Line
Break (HELB), Revision 0
PAD 77652, Process Activity Determination EC-77652, Revision 0
SGX-00059, Unit 2, Safety Related 480V MCC Coordination Calculation for MCC 26A,
Revision 3
Corrective Action Documents
1997-02245
2002-10549
2002-11162
2005-02542
2007-04212
2010-02314
2011-00232
2011-01103
2011-01193
2012-00203
2012-01124
2012-03262
2012-06255
2013-00064
2013-01119
2013-02007
2014-01364
2014-02381
2014-02590
2014-03007
2015-00213
2015-00912
2015-03047
2015-03702
2015-03725
2015-04350
2015-04671
2015-05040
2015-05177
2015-05384
2016-00257
2016-00470
2016-01228
2016-01850
2016-02059
2016-02794
2016-02924
2016-03156
2016-03280
2016-03428
2016-03805
2016-03980
2016-05026
2016-05497
2017-00700
2017-01151
2017-01154
2017-01276
2017-01808
2017-01896
2017-01933
2017-01946
2017-01978
2017-02023
2017-02067
2017-02291
2017-02784
2017-03504
2017-04045
2017-04604
2017-05114
2017-05190
2017-05361
2017-05549
2017-05555
2017-05748
2018-00042
2018-00214
2018-01366
2018-01445
2018-01692
2018-01814
2018-01834
2018-01849
2018-01897
2018-01930
2018-02098
2018-02472
2018-02507*
2018-02544
2018-02933
2018-02938
2018-03109
2018-03169*
2018-03170*
2018-03176*
2018-03177*
2018-03178*
2018-03179*
2018-03201*
2018-03213*
2018-03217*
2018-03316*
2018-03333*
2018-03335*
2018-03378*
2018-03382*
2018-03383*
2018-03398*
2018-03402*
2018-03405*
2018-05837*
2018-05893*
2018-06066*
(*initiated in response to inspection)
Design and Licensing Basis
30052284, NRC Letter - Safety Evaluation, dated 3/10/86
COR-05-01123, NRC Letter - Supplement to Safety Evaluation, dated 1/30/02
EC 56002, IP2-CVCS DBD Modification, Revision 2
Indian Point 2 Updated Final Safety Analysis Report, Revision 26
Indian Point 3 Updated Final Safety Analysis Report, Revision 7
Indian Point Unit 2, Improved Technical Specifications, Amendment 288
Indian Point Unit 3, Improved Technical Specifications, Amendment 264
IP2-CVCS DBD, Design Basis Document for Chemical Volume and Control System, Revision 2
IP3-DBD-303, Auxiliary Feedwater System (AFWS), Revision 5
IP3-DBD-304, Design Basis Document - Service Water System, Revision 5
IP3-DBD-306, Safety Injection System, Revision 5
IP3-DBD-324, Emergency Diesel Generators and Appendix R Diesel Generators, Revision 2
LER 2015-001, Component Cooling and Shutdown Heat Exchanger Lineup Potential to Exceed
Design Basis Temperatures, Revision 0
LER 2015-002-00, Safety System Functional Failure Due to Fuses for Residual Heat Removal
Heat Exchanger Outlet Valves That Would Not Remain Operable Under Degraded
Voltage Conditions, Revision 0
Safety Evaluation of Indian Point 3 - Supplement No. 1, dated 1/16/75
Drawings
208500, Indian Point Energy Center Unit 2, One Line Diagram 480VAC MCC 26AA, MCC
26BB, & 120VAC Distribution Panels 1 and 2, Revision 48
250907, Indian Point Energy Center Unit 2, Electrical Distribution and Transmission System,
Revision 39
5008971, Elementary Wiring Diagram Component Cooling Pump 32 Electrical Unit 3,
Revision 10
500B971, Sht. 128, Elementary Wiring Diagram Motor Operated Valves, Revision 8
504629, ASCO Transfer Switch for Service Water Pump #24 Normal Power Feed, Revision 0
617F644f, 480V One Line Diagram, Revision 37
617F645, Main One Line Diagram, Revision 24
93-13028, 14 Inch Gate Valve with SMB-1 Limitorque Valve Control, Revision D
21-F-20173, IP3 Flow Diagram, Main Steam, Revision 72
21-F-20183, IP3 Flow Diagram, Condensate & Boiler Feed Pump Suction, Revision 65
21-F-2019-119, Indian Point Energy Center Unit 2, Flow Diagram Boiler Feedwater,
Revision 119
21-F-20193, IP3 Flow Diagram, Boiler Feedwater, Revision 63
21-F-21193, Flow Diagram Lube Oil to Diesel Generators, Unit 3, Revision 11
21-F-22593, Sht. 2, Diesel Generator Building Fuel Oil and Jacket Water Piping, Revision 10
21-F-23373, Diesel Generator Building Restraint and Support Design, Lines 1038, 1041 and
1044, Revision 4
21-F-27203, Flow Diagram - Auxiliary Coolant System Inside Containment, Revision 26
21-F-27223, Service Water System Nuclear Steam Supply Plant, Revision 52
21-F-2735, Sht. 1, Flow Diagram, Safety Injection System, Revision 145
21-F-27353, Sht. 1, Safety Injection System, Revision 44
21-F-2736, Sht. 1, Flow Diagram, Chemical and Volume Control System, Revision 130
21-F-27503, Sh. 2, Safety Injection System, Revision 59
21-F-27513 Sheet 1, Flow Diagram - Auxiliary Coolant System in PAB & FSB, Revision 34
21-F-27513 Sheet 2, Flow Diagram - Auxiliary Coolant System in PAB & FSB, Revision 45
21-F-3006-98, Indian Point Energy Center Unit 2, Single Line Diagram 480V MCC 26A &
26B, Revision 98
21-F-30083, Indian Point Energy Center Unit 3, Single Line Diagram
Revision 63
21-F-3164-25, Wiring Diagram 480V Switchgear 21 Units 17, 18 & 19, Revision DD
21-F-31673, IP3 Wiring Diagram 480V Switchgear Miscellaneous, Revision 28
21-F-33853, Indian Point Energy Center Unit 3, Electrical Distribution and Transmission
System, Revision 21
21-F-36033, Indian Point Energy Center Unit 3, One Line Diagram, Appendix R Diesel
Generator, Revision 15
21-F-7040, Sht. 1, Primary Auxiliary Building Instrumentation Arrangement, Revision 46
21-H-20283, Flow Diagram Jacket Water to Diesel Generators, Unit 3, Revision 26
21-H-20293, Flow Diagram Starting Air to Diesel Generators, Unit 3, Revision 34
21-H-20303, Flow Diagram Fuel Oil to Diesel Generators, Unit 3, Revision 30
21-LL-31173, Schematic Diagram 480
- V. Switchgear 31 Sht. 14, Revision 13
21-LL-31183, Sht. 5, IP3 Schematic Diagram 480V, Switchgear 32, Revision 23
21-LL-31183, Sht. 5A, IP3 Schematic Diagram 480V, Switchgear 32, Revision 8
A202095, Containment Building - Composite Piping at Reactor Coolant Pump No. 34,
Revision 20
A208088, One Line Diagram of 480 VAC SWGRs 21 & 22 Bus 2A, 3A, 5A & 6A, Revision 47
A208377-21, Indian Point Energy Center Unit 2, Main One Line Diagram, Revision 21
A208533-09, Indian Point Energy Center Unit 2, Single Line Diagram 125VDC Distribution
Panels 21AA, 22AA, 23AA, & 24AA, Revision 9
A246986, Indian Point Replacement of Auxiliary Feedwater Valve Trim, Revision 1
B225191, Sht. 105, Elementary Wiring Diagram of Control Valve Table, Revision 6
B225206, Sht. 121, Elementary Wiring Diagram of Remote Operated Valves, Revision 3
D262139, Loop Diagram-CVCS, VCT No. 21 Discharge and RFW Make-Up Valves Loop
Number 112, Revision 1
IP2-S-000193-13, SWD Control & Indication Service Water Pump 24, Revision DB
IP2-S-000255, VCT Drain MOV LCV112C, Revision 3
IP3V-0112-0061, IP3 Control Valves for Auxiliary Feedwater System Tag No. FCV-405A, 405B,
405C, 405D, Revision 3
IP3V-0112-0120, Model D-100-60 Operator, 2, 900 PSI, USA Standard Valve Assembly,
Revision 2
IP3V-13-0002, Breaker Control Schematic, Revision 21
IP3V-13-0003, DC Schematic Breaker Control, Revision 6
IP3V-15-0013, Schematic Exciter Voltage Regulator, Revision 4
Functional, Surveillance and Modification Acceptance Testing
0-GNR-404-ELC, Emergency Diesel Generator 2-Year Inspection, performed 3/6/15
0-GNR-410-ELC, Emergency Diesel Generator 8-Year Inspection, performed 3/8/15
0-MCB-401-ELC, Molded Case Circuit Breaker Inspection / Replacement, performed 3/14/11
0-VLV-421-MOV, Motor-Operated Valve Major Preventive Maintenance, performed 3/10/13
0-VLV-426-VGB, CONVAL Clampseal Globe Valves, Inspection and Repair, performed 3/30/16
0-VLV-442-AOV, Copes Vulcan Air Operated Valve with Screwed in Seats Inspection and
Maintenance, performed 1/28/13 and 11/29/15
0-VLV-444-REG, Valve Regulator Testing and Replacement, performed 4/4/08
2P3J-316, Sht. 1, Conval 2-inch Class 1500 STD Stop Valve, Revision 0
2-BRK-012-ELC, Westinghouse Model DB-50 Breaker - Corrective Maintenance, performed
1/13/15 and 3/2/16
2-BRK-021-CUB, Westinghouse 480V DB Series Breaker Cubicle Inspection & Cleaning,
performed 3/13/12 and 3/25/16
2-BRK-023-ELC, DB Breaker Amptector/Westector Overcurrent Test, performed 3/14/12 and
3/1/16
2-IC-PC-I-F-406A, Auxillary Boiler Feed Pump No.21 Discharge to Steam Generator No. 21,
performed 3/23/18
2-IC-PC-I-F-406B, Auxillary Boiler Feed Pump No.21 Discharge to Steam Generator No. 22,
performed 4/8/18
2-IC-PC-I-F-406C, Auxillary Boiler Feed Pump No.23 Discharge to Steam Generator No. 23,
performed 3/23/18
2-IC-PC-I-F-406D, Auxillary Boiler Feed Pump No.23 Discharge to Steam Generator No. 24,
performed 4/8/18
2-MCC-001-ELC, Westinghouse Type W-480 Volt Motor Control Center Preventive
Maintenance, performed 12/16/14
2-PT-M021A, Emergency Diesel Generator 21 Load Test, performed 8/7/18 and 9/6/18
2-PT-R013B, Auxiliary Feedwater Pumps Automatic Actuation Circuits, performed 3/19/18
2-VLV-047-VBF, Fisher Series7600 Butterfly Valves and Attached Fisher 656 Actuator,
performed 4/4/08 and 3/9/14
3-COL-FW-2, Auxiliary Feedwater System, performed 5/7/17
3-FAN-010-VSS, Inspection of Emergency Diesel Generator Exhaust Fans, performed 6/12/18
3-FAN-014-VSS, Inspection of the Emergency Diesel Generator Intake/Exhaust Fan
Louvers/Dampers, performed 1/3/18
3-IC-PM-I-E-31BC, 31 Battery Charger Preventive Maintenance, performed 5/5/17
3-PT-2Y025, 31, 32, 33 Component Cooling Water Pumps Full Flow Test, performed 2/22/16
3PT-CS035, Containment Sump RHR Suction Isolation Valve Functional Test, performed
3/21/17
3-PT-Q088, Component Cooling Pumps, performed 11/15/17
3-PT-R003C, Safety Injection Test Train 1 and Train 2, performed 5/2/17
3-PT-R003D, Safety Injection Test, performed 5/5/17
3-PT-R003F, Non-SI Blackout Logic and ABFP Auto-Start Functional Test, performed 4/8/17
3-PT-R027, City Water Makeup Supply Valves, performed 4/30/17
3-PT-R160A, 31 EDG Capacity Test, performed 3/11/15
3-PT-R172A, Station Battery #31 Modified Performance Test, performed 4/30/17
EN-MA-125, Troubleshooting Control of Maintenance Activities, performed 4/30/17
EN-MA-143, Use of Air Operator Valve Diagnostics, performed 4/4/08 and 3/9/14
PFM-118, Battery Charger Testing Using BCT-2000 Computer, performed 5/5/17
PFM-82, BCT-2000 Battery Test Computer Calibration, performed 3/6/17
PI-3Y41C, 23 Accumulator Tank In-Service Inspection, performed 10/20/17
PT-V24/69, Inservice Valve Tests, performed 3/11/14, 3/31/16 and 3/30/18
Miscellaneous
288-0058-ESA-02, Indian Point Energy Center EDG 3-1 April 2018 Engine Signature Analysis,
Revision 0
2AFP Vibration Data 9/25/14-9/26/18
77652, Design Equivalent Change Package to make EC 75844 for the 24SWP Transfer Switch
Disconnect Replacement Permanent, Revision 0
CR-IP3-2014-01364, Apparent Cause Evaluation Installed Pressure Regulator Identified to be
Potentially Inappropriate for the AFW Pump Room, Revision 1
Indian Point Energy Center Maintenance Rule Basis Document, Emergency Diesel Generators
(IP-2 and IP-3), Revision 1
IPEC Maintenance Rule Basis Document, Residual Heat Removal System, Revision 2
IP-RPT-06-AMM04, Aging Management Review of the City Water System, dated 8/27/13
IP-RPT-18-00010, Engineering Report Seismic Qualification Report for Square D Disconnect
Switch Part No. LK4SU3N, Revision 0
NSE-99-050, Evaluation of Apparent Non-conformances Related to CCW Piping Routed Inside
Crane Mall, Revision 0
P11690, Specification for Service Water System, dated 1/2/92
SEP-IP3-IST-1, Inservice Testing Program Basis Document, Revision 2
System Health Report, Safety Injection System, Unit 2, Q2-218
System Health Report, Safety Injection System, Unit 3, Q2-218
System Health Report, Unit 3, DC-DC Power: 1Q, 2Q, 2018
System Health Report, Unit 3, DC-DC Power: 3Q, 4Q, 2017
WTIPC-2013-64 CA65, OE Evaluation - NRC-IN-2013-18, Refueling Water Storage Tank
Degradation, Revision 0
Modifications and Design Changes
77652, Design Equivalent Change Package to make EC 75844 for the 24SWP Transfer Switch
Disconnect Replacement Permanent, Revision 0
EC 059987, IPEC Unit 2, Replace FC-406A, FC-406B, FC-406C, AND FC-406D Yokogawa
Controllers with NUS PIDA 700 Series Controllers, Revision 0
EC 18294, IP2 Flow Control Valve AFW Minimum Flow Increase, Revision 0
EC 59123, Reply to 2015 NRC CDBI Item 104 - Verify Adequate Operating Voltage to all Unit 2
and Unit 3 Safety Related Equipment, Revision 0
EC 63883, Replace Containment Recirculation Fan Motor Cooler 22 Outlet Manual Throttle
Valve SWN-71-2C, Revision 0
EC 66581, Essential SW Header Flow Balance to Increase Flow to the FCUs (CR-IP3-2015-
5766), dated 12/21/16
EC 69703, Replace Air Regulator on Valve SWN-TCV-1104
Procedures
0-LUB-401-GEN, Lubrication of Plant Equipment, Revision 13
0-PMP-411-BFP, Turbine Driven Auxiliary Boiler Feed Pump Overhaul /Inspection, Revision 6
0-PMP-422-BFD, Inspection and Repair of Motor Driven Auxiliary Boiler Feed Pumps,
Revision 5
0-PT-Q001, Alternate Safe Shutdown Equipment Inventory and Inspection, Revision 14
0-TUR-403-AFP, Worthington Auxiliary Boiler Feed Pump Turbine Preventive Maintenance,
Revision 10
0-VLV-442-AOV, Copes Vulcan Air Operated Valve with Screwed In Seats Inspection and
Maintenance, Revision 4
2-AOP-480V-1, Loss of Normal Power to Any 480V Bus, Revision 8
2-AOP-SSD-1, Control Room Accessibility Safe Shutdown Control, Revision 28
2-ARP-SCF, Condensate and Boiler Feed, Revision 50
2-ARPSJF, Cooling Water and Air, Revision 43
2-ES-1.2, Post LOCA Cooldown and Depressurization, Revision 5
2-ES-1.3, Transfer to Cold Leg Recirculation, Revision 9
2-PT-Q017E, Alternate Safe Shutdown Supply Verification to 24 SWP, Revision 12
2-PT-R036A, Main Transformer #21 Water Deluge System, Revision 9
2-PT-R036B, Main Transformer #22 Water Deluge System, Revision 9
2-PT-R036C, Unit Auxillary Transformer Water Deluge System, Revision 7
2-PT-R036D, Station Auxillary Transformer Water Deluge System, Revision 8
2-SOP-10.1.1, Safety Injection Accumulators and RWST Operations, Revision 57
2-SOP-11.1, Ventilation System Operation, Revision 63
2-SOP-27.1.5, 480 Volt System, Revision 56
2-SOP-ESP-001, Local Equipment Operation and Contingency Actions, Revision 15
3-AOP-CCW-1, Loss of Component Cooling Water, Revision 7
3-AOP-DC-1, Loss of a 125VDC Panel, Revision 7
3-ARP-011, Panel SHF - Electrical, Revision 36
3-ARP-019, Panel Local - Diesel Generators, Revision 26
3-BKR-018-ELC, Inspection, Lubrication, and Testing of Westinghouse 480V DS532/632
Breakers, Revision 19
3-ELC-004-FIR, Appendix R Repair, Revison 12
3-ES-1.3, Transfer to Cold Leg Recirculation, Revision 11
3-IC-PC-I-E-31, Diesel Generator No. 31 Electrical Instrumentation, Revision 20
3-PT-R040, Transformer Yard Water Deluge System Testing, Revision 23
3-SOP-CC-001A, Component Cooling System Operation - Filling, Venting, and Draining,
Revision 20
3-SOP-CC-001B, Component Cooling System Operation, Revision 35
3-SOP-EL-001, Diesel Generator Operation, Revision 53
3-SOP-ESP-001, Local Equipment Operation and Contingency Actions, Revision 26
3-SOP-V-006, Miscellaneous Heating and Ventilation Systems, Revision 17
ARP-13, Hi Room Temp - Control Building El. 15 feet, Revision 31
EN-DC-311, MOV Periodic Verification, Revision 4
EN-DC-331, MOV Program, Revision 5
EN-OP-123, Time Critical Action/ Time Sensitive Action Program Standard, Revision 0
IP3-ECAF-BUS2A-30D, Component Cooling Pump 32, Revision 0
OAP-115, Operations Commitments and Policy Details, Revision 37
Vendor Manuals
1389-1.1, Maintenance Manual for Anchor Darling Double Disc Type Gate Valves, dated
11/21/85
209-100000309, Instructions for Installation, Operation, and Maintenance of S Line General
Service Pumps, Revision 6
AWAUSA463-105, Klochner-Moeller Series 200 Motor Control Center, dated March 1985
CEP-WP-002, Entergy Nuclear Welding Procedure, Welding Procedure Specification,
Revision 0
EX-01, Exide Volt Float Charger USF 130-3-150, dated 12/31/79
EX-02, Exide Volt Float Charger USF 130-3-200, dated 7/30/80
G-676241, Westinghouse Electric Corporation Plant Manual Equipment Data Volume V, dated
June 1969
- I.B. 12-129, Westinghouse Instructions for Type W Control Center, dated July 1969
NUS PIDA 700, Proportional Integral Derivative Controller Operations and Maintenance Manual,
dated 8/31/99
RS-1476, C&D Standby Battery Vented Cell Installation and Operating Instructions, dated
6/30/11
VM-2351/TPI-899A, ALCO 16-251E1 Instruction and Maintenance Manual, Revision 1-1
Work Orders
243455
244270
262779
262780
00344063
00352577
00393667
00416894
00417194
00417195
00417196
00417403
00430673
00446573
00455793
00460006
00461288
00471931
00474124
224179
51484784
51486578
2189151
2189152
213790
213870
255244
2308539
2393071
2399272
2433469
2435522
2436959
2436960
2437145
2437146
2447175
2504456
2555971
2571416
2571557
2595902
2622993
2625365
2672467
2680208
2690758
2706407
2708866
2708873
2708875
2722206
2760086
2821744
2830515
AR154186154186AR154201
AR154211154211AR154212
AR154213154213AR220070