MONTHYEARML22347A2502022-12-21021 December 2022 Security Inspection Plan ML21208A2112021-07-27027 July 2021 Decommissioning Inspection Plan for Indian Point Generating Unit 3 - 2021 IR 05000286/20200062021-03-0303 March 2021 Annual Assessment Letter for Indian Point Energy Center, Unit 3 (Report 05000286/2020006) IR 05000286/20200052020-08-31031 August 2020 Updated Inspection Plan for Indian Point Energy Center, Unit 3 (Inspection Report 05000286/2020005) IR 05000247/20190062020-03-0303 March 2020 Annual Assessment Letter for Indian Point Energy Center, Units 2 and 3 (Report 05000247/2019006 and 05000286/2019006) IR 05000247/20190052019-08-28028 August 2019 Updated Inspection Plan (Inspection Report 05000247/2019005 and 05000286/2019005) IR 05000247/20180062019-03-0404 March 2019 Annual Assessment Letter for Indian Point Energy Center, Units 2 and 3 (Reports 05000247/2018006 and 05000286/2018006) IR 05000247/20180052018-08-28028 August 2018 Updated Inspection Plan (Inspection Report 05000247/2018005 and 05000286/2018005) ML18240A1612018-08-28028 August 2018 Updated Inspection Plan (Inspection Report 05000247/2018005 and 05000286/2018005) IR 05000247/20170062018-02-28028 February 2018 Annual Assessment Letter for Indian Point Energy Center, Units 2 and 3 (Report 05000247/2017006 and 05000286/2017006, Report 05000247/2017402 and 05000286/2017402, Report 05000247/2017501 and 05000286/2017501) IR 05000247/20170052017-08-28028 August 2017 Updated Inspection Plan for Indian Point Nuclear Generating, Units 2 and 3 (Report 05000247/2017005 and 05000286/2017005) IR 05000247/20160062017-03-0101 March 2017 Annual Assessment Letter for Indian Point Nuclear Generating, Units 2 and 3 (Report 05000247/2016006 and 05000286/2016006) IR 05000247/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2016005 and 05000286/2016005) IR 05000247/20150062016-03-0202 March 2016 2015 Annual Assessment Letter for Indian Point Nuclear Generating, Units 2 and 3 (Report 05000247/2015006 and 05000286/2015006) IR 05000247/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2015005 and 05000286/2015005) ML15061A4012015-03-0404 March 2015 2014 Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2014001 and 05000286/2014001)(w/Inspection Plan) IR 05000247/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter and Inspection Plan 2014 (ROP-15) - Indian Point Nuclear Generating Units 2 and 3 (Report 05000247-14-006 and 05000286-14-006) IR 05000247/20130012014-03-0404 March 2014 2013 Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247/2013001 and 05000286/2013001)(w/Inspection Plan) ML14027A4152014-01-16016 January 2014 Enclosure 2 to NL-14-010, Attachment 2, Final Response to U.S. NRC RAI 6-A Items 1 and 2 on the Rvi Program and Rvi Inspection Plan IR 05000247/20130062013-09-0303 September 2013 Mid-Cycle Performance Review and Inspection Plan 2013 (ROP-14) - Indian Point Nuclear Generating Units 2 and 3 (Report 05000247-13-006 and 05000286-13-006) IR 05000247/20120012013-03-0404 March 2013 Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Report 05000247-12-001 and 05000286-12-001) ML12297A0062012-10-22022 October 2012 Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML12244A3542012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan - 2013 Indian Point Nuclear Generating Units 2 and 3 IR 05000247/20110012012-03-0505 March 2012 Annual Assessment Letter (Report 05000247/2011001 and 05000286/2011001) ML1124208362011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Indian Point Nuclear Generating Units 2 and 3 ML1106204642011-03-0404 March 2011 Annual Assessment Letter for Indian Point Nuclear Generating Units 2 and 3 (Reports 05000247/2010001 and 05000286/2010001) ML1024402362010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Indian Point Nuclear Generating Units 2 and 3 ML1006208632010-03-0303 March 2010 Annual Assessment Letter (Report 05000247-10-001 & 05000286-10-001) ML0924401932009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - Indian Point Nuclear Generating Stations Units 2 and 3, Dated 09/01/09 IR 05000247/20090012009-03-0404 March 2009 IR 05000247-09-001 and 05000286-09-001, on 02/10/2009, Indian Point Nuclear Generating Units 1 & 2, Annual Assessment Letter, Dated March 4, 2009 ML0824703162008-09-0202 September 2008 Mid-Cycle Performance Review and Inspection Plan, Indian Point, Units 2 and 3 ML0904105262008-06-0202 June 2008 Inspection Plan - Indian Point 2; Station Blackout Diesel Generator Modification & 50.59; IR No. 50-247-08-012 IR 05000247/20080012008-03-0303 March 2008 Annual Assessment Letter EOC 2007 ROP8 - Indian Point Energy Center (05000247-08-001, 05000286-08-001) ML0734709592007-12-13013 December 2007 ROP8 - Indian Point 2 and 3 - Change to Inspection Plan, 12/13/07 ML0724309422007-08-31031 August 2007 Mid-Cycle Performance Review and Inspection Plan - Indian Point Nuclear Generating Units 2 and 3 ML0706106032007-03-0202 March 2007 Annual Assessment Letter EOC 2006 - Indian Point Station Units 2 & 3 (05-247/2007001 and 05-286/2007001) ML0708806212006-12-26026 December 2006 E-Mail from Mclaughlin to Alp@Nyserda.Org, NRC Reactor Inspection Schedule for 1Q07 ML0624306582006-08-31031 August 2006 Mid-cycle Performance Review and Inspection Plan - Indian Point Nuclear Generating Units 2 and 3 ML0613805862006-05-18018 May 2006 Inspection/Activity Plan, 05/01/2006 - 09/30/2007 ML0621406102006-05-18018 May 2006 Inspection / Activity Plan 05/01/2006 - 09/30/2007 ML0606201072006-03-0202 March 2006 2006-001 - Annual Assessment Letter - Indian Point Nuclear Generating Units 2 and 3 (Reports 05-247/2006001 & 05-286/2006001) ML0526400032005-09-20020 September 2005 Memo Special Inspection Charter - Indian Point, Unit No. 2 ML0524207132005-08-30030 August 2005 2005 Mid-Cycle Review and Inspection Plan - Indian Point 2 & 3 ML0506105932005-03-0202 March 2005 Annual Assessment Letter 2005001 - Indian Point 2 & 3 ML0424400842004-08-30030 August 2004 2004 Mid-Cycle Performance Review and Inspection Plan - Indian Point 2 and 3 ML0406305552004-03-0303 March 2004 2003-04 Annual Assessment Letter - Indian Point IR 05000286/20030012003-03-0303 March 2003 2003 Annual Assessment Letter - Indian Point Nuclear Generating Unit 2 (Report 50-286/2003001) ML0224100642002-08-28028 August 2002 2002 Mid-Cycle Performance Review and Inspection Plan - Indian Point Nuclear Generating Unit 2 ML0223803962002-08-26026 August 2002 2002 Indian Point 3 Mid-Cycle Performance Review and Inspection Plan IR 05000247/20020012002-03-0404 March 2002 2002 Annual Assessment Letter - Indian Point 2 (Report 50-247/02-01) 2022-12-21
[Table view] Category:Letter
MONTHYEARML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status IR 05000003/20240022024-08-0606 August 2024 NRC Inspection Report 05000003/2024002, 05000247/2024002, 05000286/2024002 PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 ML24171A0122024-06-18018 June 2024 Reply to a Notice of Violation EA-24-037 ML24156A1162024-06-0404 June 2024 Correction - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities IR 05000003/20240052024-05-21021 May 2024 and 3 - NRC Inspection Report Nos. 05000003/2024005, 05000247/2024005, 05000286/2024005, 07200051/2024001, and Notice of Violation ML24128A0632024-05-0707 May 2024 Submittal of 2023 Annual Radiological Environmental Operating Report L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 ML24116A2412024-04-25025 April 2024 Annual Environmental Protection Plan Report ML24114A2282024-04-23023 April 2024 Annual Radioactive Effluent Release Report L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) ML24080A1722024-03-20020 March 2024 Reply to a Notice of Violation EA-2024-010 IR 05000003/20240012024-03-20020 March 2024 NRC Inspection Report Nos. 05000003/2024001, 05000247/2024001, and 05000286/2024001 (Cover Letter Only) ML24045A0882024-02-22022 February 2024 Correction to the Technical Specifications to Reflect Appropriate Pages Removed and Retained by Previous License Amendments ML24053A0642024-02-22022 February 2024 2023 Annual Fitness for Duty Program Performance Data Report and Fatigue Management Program Data Report IR 05000003/20230042024-02-22022 February 2024 NRC Inspection Report Nos. 05000003/2023004, 05000247/2023004, 05000286/2023004, and 07200051/2023004 and Notice of Violation ML24011A1982024-01-12012 January 2024 ISFSI, Notice of Organization Change for Site Vice President ML23342A1082024-01-0909 January 2024 – Independent Spent Fuel Storage Installation Security Inspection Plan ML23353A1742023-12-19019 December 2023 ISFSI, Emergency Plan, Revision 23-04 L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23326A1322023-12-0505 December 2023 Issuance of Amendment No. 67, 300 & 276 to Implement the Independent Spent Fuel Storage Installation Only Emergency Plan ML23339A0442023-12-0505 December 2023 Issuance of Amendment No. 68, 301 and 277 Regarding Changes to Implement the Independent Spent Fuel Storage Installation Physical Security Plan ML23338A2262023-12-0404 December 2023 Signed Amendment No. 27 to Indemnity Agreement No. B-19 ML23356A0212023-12-0101 December 2023 American Nuclear Insurers, Secondary Financial Protection (SFP) Program ML23242A2772023-11-30030 November 2023 NRC Letter Issuance - IP LAR for Units 2 and 3 Renewed Facility Licenses and PDTS to Reflect Permanent Removal of Spent Fuel from SFPs ML23338A0482023-11-30030 November 2023 ISFSI, Report of Changes to Physical Security, Training and Qualification, Safeguards Contingency Plan, and ISFSI Security Program, Revision 28 ML22339A1572023-11-27027 November 2023 Letter - Indian Point - Ea/Fonsi Request for Exemptions from Certain Emergency Planning Requirements for 10 CFR 50.47 and 10 CFR Part 50, Appendix E IR 05000003/20230032023-11-21021 November 2023 NRC Inspection Report Nos. 05000003/2023003, 05000247/2023003, 05000286/2023003, and 07200051/2023003 ML23100A1252023-11-17017 November 2023 Letter and Enclosure 1 - Issuance Indian Point Energy Center Units 1, 2, and 3 Exemption for Offsite Primary and Secondary Liability Insurance Indemnity Agreement ML23100A1172023-11-17017 November 2023 NRC Response - Indian Point Energy Center Generating Units 1, 2, and 3 Letter with Enclosures Regarding Changes to Remove the Cyber Security Plan License Condition ML23050A0032023-11-17017 November 2023 Letter - Issuance Indian Point Unit 2 License Amendment Request to Modify Tech Specs for Staffing Requirements Following Spent Fuel Transfer to Dry Storage ML23100A1432023-11-16016 November 2023 Letter - Issuance Indian Point Energy Center Generating Units 1, 2, and 3 Exemption Concerning Onsite Property Damage Insurance (Docket Nos. 50-003, 50-247, 50-286) L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23064A0002023-11-13013 November 2023 NRC Issuance for Approval-Indian Point EC Units 1, 2 and 3 Emergency Plan and Emergency Action Level Scheme Amendments ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) ML23063A1432023-11-0101 November 2023 Letter - Issuance Holtec Request for Indian Point Energy Center Generating Units 1, 2, and 3 Exemptions from Certain Emergency Planning Requirements of 10 CFR 50.47 and Part 50 ML23292A0262023-10-19019 October 2023 LTR-23-0211-RI Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report-RI ML23289A1582023-10-16016 October 2023 Decommissioning International - Registration of Spent Fuel Casks and Notification of Permanent Removal of All Indian Point Unit 3 Spent Fuel Assemblies from the Spent Fuel Pit ML23270A0082023-09-27027 September 2023 Registration of Spent Fuel Casks ML23237A5712023-09-22022 September 2023 09-22-2023 Letter to Dwaine Perry, Chief, Ramapo Munsee Nation, from Chair Hanson, Responds to Letter Regarding Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River ML23242A2182023-09-12012 September 2023 IPEC NRC Response to the Town of New Windsor, Ny Board Certified Motion Letter Regarding Treated Water Release from IP Site (Dockets 50-003, 50-247, 50-286) ML23250A0812023-09-0707 September 2023 Registration of Spent Fuel Casks ML23255A0142023-08-31031 August 2023 LTR-23-0211 Thomas Congdon, Executive Deputy, Department of Public Service, Chair, Indian Point Decommissioning Oversight Board, Letter Independent Spent Fuel Storage Installation Inspection and Office of the Inspector General Report IR 05000003/20230022023-08-22022 August 2023 NRC Inspection Report 05000003/2023002, 05000247/2023002, 05000286/2023002, and 07200051/2023002 ML23227A1852023-08-15015 August 2023 Request for a Revised Approval Date Regarding the Indian Point Energy Center Permanently Defueled Emergency Plan and Emergency Action Level Scheme ML23222A1442023-08-10010 August 2023 Registration of Spent Fuel Casks ML23208A1642023-07-26026 July 2023 Village of Croton-on-Hudson New York Letter Dated 7-26-23 Re Holtec Wastewater ML23200A0422023-07-19019 July 2023 Registration of Spent Fuel Casks ML23235A0602023-07-17017 July 2023 LTR-23-0194 Dwaine Perry, Chief, Ramapo Munsee Nation, Ltr Opposition of the Release and Dumping of Radioactive Waste from Indian Point Nuclear Power Plant Into the Hudson River 2024-09-18
[Table view] |
Text
UNITED STATES ember 3, 2013
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
INDIAN POINT NUCLEAR GENERATING UNITS 2 AND 3 (REPORT 05000247/2013006 AND 05000286/2013006)
Dear Mr. Ventosa:
On August 14, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Indian Point Nuclear Generating Units 2 and 3 (Indian Point). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2012, through June 30, 2013. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that overall, Indian Point operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Indian Point during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low safety significance (Green), and all PIs indicated that your performance was within the nominal, expected range (Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2014.
Routine inspections performed by resident inspectors are not included in the inspection plan.
The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.
In addition to baseline inspections, the NRC will perform Inspection Procedure (IP) 60855.1, Operation of an Independent Spent Fuel Storage Installation at Operating Plants, IP 60845, Operation of Intra-Unit Fuel Transfer Canister and Cask System, and Temporary Instruction (TI) 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping - Phase 2. We have also scheduled a review of your proposed commitments made during the license renewal application process regarding Indian Point Unit 2. This activity will include a review of Aging Management Program implementation and will be conducted using TI 2516/001, "Review of License Renewal Activities." The overall purpose of the review is to assess progress of your actions associated with monitoring passive components within the scope of license renewal and as tentatively accepted by the staff's safety evaluation report. The TI is available on the NRC Website at: http://pbadupws.nrc.gov/docs/ML1106/ML110620255.pdf.
As described in our assessment letter dated March 4, 2013, the NRC has modified the inspection program at Indian Point. On January 1, 2012, the NRC implemented an inspection program which performs major team inspections, with the exception of triennial fire protection inspections, on a site basis versus a unit basis. Also, on January 1, 2013, the NRC reduced the inspection sample requirements for the resident baseline inspection program and set resident staffing at three permanent resident inspectors instead of four. However, the modified inspection program maintains an increased NRC inspection effort and staffing compared to other dual unit sites in the U.S.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 610-337-5069 with any questions you have regarding this letter.
Sincerely,
/RA/
Arthur L. Burritt, Chief Projects Branch 2 Division of Reactor Projects Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64 Enclosure: Indian Point 2 & 3 Inspection/Activity Plan cc w/encl: Distribution via ListServ
ML13242A244 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE klm RI/DRP RI/DRP NAME SMcCarver/SCM ABurritt/ALB DATE 8/26/13 9/3/13
Page 1 of 2 Indian Point 08/01/2013 08:24:28 Inspection / Activity Plan Report 22 07/01/2013 - 12/31/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 7111111B - INDIAN PT 3 REQUAL INSP WITH P/F RESULTS 2 3 09/16/2013 09/20/2013 IP 7111111B Licensed Operator Requalification Program 71124 - HP - EXPOSURE AND ALARA CONTROLS 1 2, 3 08/19/2013 08/23/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 08/19/2013 08/23/2013 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 08/19/2013 08/23/2013 IP 71124.05 Radiation Monitoring Instrumentation ISFSI - ISFSI LOADING INSPECTION 2 2 08/19/2013 08/23/2013 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants PI&R - PI&R 5 2, 3 10/07/2013 10/11/2013 IP 71152B Problem Identification and Resolution 2, 3 10/21/2013 10/25/2013 IP 71152B Problem Identification and Resolution 2516-001 - TI 2516-001 LR COMMITMENT INSP PHASE III 2 2 09/09/2013 09/13/2013 IP 2516/001 Review of License Renewal Activities 2/9EXAM - IP2 INITIAL EXAM 4 2 01/13/2014 01/17/2014 U01890 FY14-INDIAN POINT 2 INITIAL OPERATOR LICENSING EXAM 2 02/10/2014 02/19/2014 U01890 FY14-INDIAN POINT 2 INITIAL OPERATOR LICENSING EXAM 71124.08 - RADWASTE 1 2, 3 11/04/2013 11/08/2013 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 7111108P - INSERVICE INSPECTION 1 2 03/03/2014 03/14/2014 IP 7111108P Inservice Inspection Activities - PWR 71124 - HP 1 2, 3 03/10/2014 03/14/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 03/10/2014 03/14/2014 IP 71124.02 Occupational ALARA Planning and Controls TI-182 - DEGRAD UNDERGROUND PIPING - PHASE 2 1 2, 3 03/31/2014 04/04/2014 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping TRI FIRE - IP3 TRIENNIAL FIRE PROTECTION INSPECTION 4 3 05/05/2014 05/09/2014 IP 7111105T Fire Protection [Triennial]
3 05/19/2014 05/23/2014 IP 7111105T Fire Protection [Triennial]
71124.07 - REMP 1 2, 3 06/09/2014 06/13/2014 IP 71124.07 Radiological Environmental Monitoring Program 2561 - SAFSTOR 1 1 06/23/2014 06/25/2014 IP 36801 Organization, Management, And Cost Controls At Permanently Shutdown Reactors 1 06/23/2014 06/25/2014 IP 37801 Safety Reviews, Design Changes, And Modifications At Permanently Shutdown Reactors This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Enclosure
Page 2 of 2 Indian Point 08/01/2013 08:24:28 Inspection / Activity Plan Report 22 07/01/2013 - 12/31/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 2561 - SAFSTOR 1 1 06/23/2014 06/25/2014 IP 40801 Self-Assessment, Auditing, And Corrective Action At Permanently Shutdown Reactors 1 06/23/2014 06/25/2014 IP 60801 Spent Fuel Pool Safety At Permanently Shutdown Reactors 1 06/23/2014 06/25/2014 IP 62801 Maintenance And Surveillance At Permanenly Shutdown Reactors 1 06/23/2014 06/25/2014 IP 71801 Decommissioning Performance And Status Revierw At Permanently Suhutdown Reactors 1 06/23/2014 06/25/2014 IP 83750 Occupational Radiation Exposure 1 06/23/2014 06/25/2014 IP 84750 Radioactive Waste Treatment, And Effluent And Environmental Monitoring 1 06/23/2014 06/25/2014 IP 86750 Solid Radioactive Waste Management And Transportation Of Radioactive Materials MODS - PERMANENT PLANT MODIFICATIONS 4 2, 3 06/23/2014 06/27/2014 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications 2, 3 07/07/2014 07/11/2014 IP 7111117T Evaluations of Changes, Tests, and Experiments and Permanent Plant Modifications ISFSI - INTER-UNIT FUEL TRANSFER 2 2, 3 07/14/2014 07/18/2014 IP 60845 Operation of Inter-Unit Fuel Transfer Canister and Cask System 7111111B - U2 REQUAL INSP WITH P/F RESULTS 2 2 09/15/2014 09/19/2014 IP 7111111B Licensed Operator Requalification Program 71124 - HP 1 2, 3 08/11/2014 08/15/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 2, 3 08/11/2014 08/15/2014 IP 71124.02 Occupational ALARA Planning and Controls 2, 3 08/11/2014 08/15/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation EP EXER - EP EXERCISE INSPECTION 1 2, 3 10/06/2014 10/10/2014 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event 71124 - HP 1 2, 3 11/03/2014 11/07/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 2, 3 11/03/2014 11/07/2014 IP 71124.04 Occupational Dose Assessment This report does not include INPO and OUTAGE activities.