MONTHYEARML18222A3472018-08-10010 August 2018 Notification of Inspection and Request for Information for Nuclear Regulatory Commission Problem Identification and Resolution Inspection IR 05000280/20100042011-02-11011 February 2011 IR 05000280-10-004, 05000281-10-004, 05000280-10-501, and 05000281-10-501, on 10/29/10, Surry Power Station - Errata IR 05000280/20092012009-05-21021 May 2009 IR 05000280-09-201, and IR 05000281-09-201, on 03/27/2009, Surry Nuclear Power Plant - Security Inspection ML0711400732007-06-0606 June 2007 Ltr. to Mr. David A. Christian Surry Nuclear Power Station - Material Control and Accounting Program Inspection IR 05000280/20060092006-08-11011 August 2006 IR 05000280-06-009, IR 05000281-06-009, on 06/12-16/2006 & 06/26-30/2006 for Surry, Units 1 and 2; Triennial Fire Protection Inspection IR 05000280/20040042004-11-24024 November 2004 Errata Surry Power Station - NRC Integrated Inspection Report Nos. 5000280/2004004 and 5000281/2004004 - and Office of Investigations Case Number 2-2003-075 IR 05000280/20010052002-04-25025 April 2002 IR 05000280/2001-005, 05000281/2001-005, Surry Nuclear Power Station, Inspection on 12/30/2001 - 03/30/2002. No Findings of Significance Identified IR 05000280/20010072002-01-18018 January 2002 IR 05000280/2001-007, IR 05000281/2001-007, on 11/26-30 and 12/10-14/2001; Virginia Electric and Power Co., Surry Power Station, Units 1 & 2. Annual Baseline Inspection of the Identification and Resolution of Problems. No Violations Noted ML19095A2711978-04-0606 April 1978 Provide Information on Steam Generator Inspection on Unit 2, Which Supplement to Vepco'S Submittal of 4/4/1978 ML19093B0331977-11-30030 November 1977 Enclosed Justification for Tube Inspection Program & Plugging Criteria, Results of Completed Surry Unit No. 1 Inspection Program with Small Change in Denting ML19095A5231977-09-0202 September 1977 Response to Non-Compliance Item Reported in IE Inspection Reports 50/280/77-20 & 50/281/77-20, & Determined No Proprietary Information Is Contained ML19098B4291977-05-26026 May 1977 Response to Letter of 5/6/1977, in Reference to IE Inspection Reports 50-280/77-7 & 50-281/77-7, Advising No Proprietary Information Is Contained in Reports ML19098B4281977-05-16016 May 1977 Response to Letter of 4/21/1977, in Reference to IE Inspection Reports 50-280/77-4 & 50-281/77-4, Advising No Proprietary Information Is Contained in Reports ML19098B4271977-05-16016 May 1977 Response to Letter of 4/22/1977, in Reference to IE Inspection Reports 50-280/77-5 & 50-281/77-5, Advising No Proprietary Information Is Contained in Reports ML19098B4261977-04-29029 April 1977 Advising Completeness of Unit 1 Steam Generator Inspection Program & Presenting Results of Program in Attachment 1 ML19105A1821975-07-0909 July 1975 Report No. ISI 75-3, Preliminary Results of Inservice Inspection Program Refueling Outage No. 1, Surry Power Station Unit No. 2. 2018-08-10
[Table view] |
Inspection Report - Surry - 2004004 |
---|
|
|
Text
ber 24, 2004
SUBJECT:
ERRATA SURRY POWER STATION - NRC INTEGRATED INSPECTION REPORT NOS. 5000280/2004004, AND 5000281/2004004 AND OFFICE OF INVESTIGATIONS CASE NUMBER 2-2003-075
Dear Mr. Christian:
On September 25, 2004, the United States Nuclear Regulatory Commission (NRC) completed an inspection at your Surry Power Station, Units 1 and 2. The above inspection report was issued without the EA number and Synopsis Attachment. The purpose of this letter is to correct the error and to ask that you replace the enclosed corrected pages in your original document.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter, and its enclosure, will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If you have any questions, please contact Mr. Larry Garner, Senior Project Engineer, at (404)
562-4552.
Sincerely,
/RA/
Kerry D. Landis, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-280, 50-281 License Nos.: DPR-32, DPR-37
Enclosure:
As stated
VEPCO 2
REGION II Case No. 2-2003-075