IR 05000259/2008008

From kanterella
(Redirected from IR 05000260/2008008)
Jump to navigation Jump to search

Download: ML082420848

Text

August 29, 2008

Mr. William R. Campbell, Jr.

Chief Nuclear Officer and Executive Vice President Tennessee Valley Authority 6A Lookout Place 1101 Market Street Chattanooga, TN 37402-2801

SUBJECT: BROWNS FERRY NUCLEAR PLANT - TI 2515/171 VERIFICATION OF SITE SPECIFIC IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT NO. 05000259/2008008, 05000260/2008008 AND 05000296/2008008

Dear Mr. Campbell:

On August 1, 2008, the United States Nuclear Regulatory Commission (NRC) completed a team inspection at your Browns Ferry Nuclear Plant. The enclosed report documents the inspection results, which were discussed with Steve Douglas and other members of your staff on August 1, 2008. The inspection examined activities conducted under your licenses as they relate to the implementation of B.5.b Phase 2 and 3 mitigating strategies, your compliance with the Commission's rules and regulations, and with the conditions of your operating licenses. Within these areas, the inspection involved examination of selected procedures and representative records, observation of activities, and interviews with station personnel. This report documents no findings of significance. TVA 2In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice", a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

Sincerely,/RA/ Eugene Guthrie, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-259, 50-260, 50-296 License Nos.: DPR-33, 52, 68 Nonpublic

Enclosure:

Inspection Report 05000259/2008008, 05000260/2008008 and 05000296/2008008

w/Attachment:

Supplemental Information cc w/encl: (See next page) TVA 2In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice", a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the sensitive information contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.

Sincerely,/RA/

Eugene Guthrie, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket Nos.: 50-259, 50-260, 50-296 License Nos.: DPR-33, 52, 68 Nonpublic

Enclosure:

Inspection Report 05000259/2008008, 05000260/2008008 and 05000296/2008008

w/Attachment:

Supplemental Information cc w/encl: (See next page)

Letter: X PUBLICLY AVAILABLE NON-PUBLICLY AVAILABLE SENSITIVE X NON-SENSITIVE ADAMS: ACCESSION NUMBER:

Enclosure:

PUBLICLY AVAILABLE X NON-PUBLICLY AVAILABLE X SENSITIVE NON-SENSITIVE ADAMS: ACCESSION NUMBER: OFFICE RII:DRP RII:DRS HQ: NRR RII: DRP HQ: NRR SIGNATURE RA VIA EMAIL RA RA VIA EMAIL RA RA VIA EMAIL NAME CStancil RMoore JBowen EGuthrie DNelson DATE 8/28/2008 8/27/2008 8/28/2008 8/29/20008 8/28/2008 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NOFFICIAL RECORD COPY DOCUMENT NAME: P:\BFN B 5 B REPORT IR 2008008.DOC TVA 3cc w/encl: R. G. (Rusty) West Site Vice President Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 S. M. Douglas General Manager Site Operations Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 D. Tony Langley Manager, Licensing and Industry Affairs Browns Ferry Nuclear Plant Tennessee Valley Authority P.O. Box 2000 Decatur, AL 35609 J. O. Mitchell Manager Site Security Browns Ferry Nuclear Plant P.O. Box 2000 Decatur, AL 35609 Larry E. Nicholson General Manager Performance Improvement Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 H. Rick Rogers Vice President, Nuclear Engineering and Projects Tennessee Valley Authority 3R Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Michael A. Purcell Senior Licensing Manager Nuclear Power Group Tennessee Valley Authority 4K Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Pat J. Asendorf General Manager Nuclear Emergency Services Tennessee Valley Authority 6B Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 C. E. Glover Manager Nuclear Security Operations Tennessee Valley Authority 6B Lookout Place 1101 Market Street Chattanooga, TN 37402-2801 Letter to William R. Campbell, Jr from Eugene Guthrie dated August 29, 2008

SUBJECT: BROWNS FERRY NUCLEAR PLANT - TI 2515/171 VERIFICATION OF SITE SPECIFIC IMPLEMENTATION OF B.5.b PHASE 2 AND 3 MITIGATING STRATEGIES INSPECTION REPORT NO. 05000259/2008008, 05000260/2008008 AND 05000296/2008008 Distribution w/encl: L. Reyes, RA V. McCree, DRA L. Wert, DRP J. Moorman, DRP (Acting) K. Kennedy, DRS R. Croteau, DRS H. Christensen, DRS E. Guthrie, DRP L. Garner, DRP J. Baptist, DRP T. Ross, DRP C. Stancil, DRP R. Moore, DRS E. Bowman, NRR E. Brown, NRR (PM: HAT, SUM) L. Slack, RII EICS OE Mail (email address if applicable) RIDSNRRDIRS Distribution w/o encl: PUBLIC