February 12, 1996

SUBJECT:

SURRY POWER STATION INTEGRATED PERFORMANCE ASSESSMENT PROCESS (IPAP)

PRELIMINARY ASSESSMENT REPORT (NRC INSPECTION REPORT NOS. 50-280/96-201 AND 50-281/95-201)

Dear Mr. O'Hanlon:

During the period from January 22 through February 2, 1996, a team under the direction of the Special Inspection Branch of the Office of Nuclear Reactor Regulation completed the in-office review phase of an Integrated Performance Assessment of the Surry Power Station, Units l and 2.

This phase of the assessment consisted of review of the inspection record and performance history for a two year period spanning January 1994 to December 1995.

The in-office review identifies performance strengths and weaknesses in the areas of Safety Assessment/Corrective Action, Operations, Engineering, Maintenance, and Plant Support.

The results are summarized in the attached preliminary assessment report and are depicted on the attached Preliminary Performance Assessment/Inspection Planning Tree.

The second phase of the assessment will consist of a two week on-site assessment scheduled to begin on February 26, 1996.

During this phase of the assessment, the team will validate its preliminary observations as well as draw conclusions in those areas originally considered to be indeterminate.

The results of the on-site as~essment will be evaluated along with those of the in office review and documented in a Final Assessment Report.

The final results will also be depicted on a Final Performance Assessment/Inspection Planning Tree.

io/

---9602200219 960212 PDR ADOCK 05000280 G

PDR inc nu. c1:Nffl\\ coP~

~,

..

I

,(

...

- " ~

J.P. 0' Han 1 on-2-

This preliminary information is being provided for your information only.

No response to this letter or the preliminary assessment is required.

Should you have any questions concerning this prelimin~~y assessment, or the assessment process in general, please contact the assessment team leajer Mr. Peter S. Koltay.at (301).415-2957.

Enclosure:

Inspection Report

cc:

See next page.

.

Sincerely,

Michael R. Johnson,

ting Chief

Special Inspection Branch

Division of Inspection and Support Programs

Office of Nuclear Reactor Regulation

..

'f.

-...

Mr. Virginia Electric and Power Company

cc:

Mr. Michael W. Maupin, Esq.

Hunton and Williams

Riverfront Plaza, East Tower

951 E. Byrd Street

Richmond, VA

23219

Mr. David Christian, Manager

Surry Power Station

Virginia Electric and Power Company

5570 Hog Island Road

Surry, VA

23883

Senior Resident Inspector

Surry Power Station

U.S. Nuclear Regulatory Commission

5850 Hog Island Road

Surry, VA

23883

Chairman

Board of Supervisors of Surry County

Surry County Courthouse

Surry, VA

23683

Dr. W. T. Lough

Virginia State Corporation

Commission

Division of Energy Regulation

P. 0. Box 119 7

Richmond, VA

23209

Regional Administrator, Region II

U.S. Nuclear Regulatory Commission

101 Marietta Street N.W., Suite 2900

Atlanta, GA

30323

Robert B. Strobe, M.D., M.P.H.

State Health Convnissioner

Office of the Commissioner

Virginia Department of Health

P.O. Box 2448

Richmond, VA

23218

Surry Power Station

Office Jr the Attorney General

Convnonwealth of Virginia

900 East Main Street

Richmond, VA

23219

Mr. M.L. Bowling, Manager

Nuclear Licensing & Operations

Support

Innsbrook Technical Center

Virginia Electric and Power Company

5000 Dominion Blvd.

Glen Allen, VA

23060

Mt. A 1 Be 1 is 1 e

U.S. Nuclear Regulatory Commission

101 Marietta Street, N.W. Suite 2900

Atlanta, GA

30323-0199