February 12, 1996
SUBJECT:
SURRY POWER STATION INTEGRATED PERFORMANCE ASSESSMENT PROCESS (IPAP)
PRELIMINARY ASSESSMENT REPORT (NRC INSPECTION REPORT NOS. 50-280/96-201 AND 50-281/95-201)
Dear Mr. O'Hanlon:
During the period from January 22 through February 2, 1996, a team under the direction of the Special Inspection Branch of the Office of Nuclear Reactor Regulation completed the in-office review phase of an Integrated Performance Assessment of the Surry Power Station, Units l and 2.
This phase of the assessment consisted of review of the inspection record and performance history for a two year period spanning January 1994 to December 1995.
The in-office review identifies performance strengths and weaknesses in the areas of Safety Assessment/Corrective Action, Operations, Engineering, Maintenance, and Plant Support.
The results are summarized in the attached preliminary assessment report and are depicted on the attached Preliminary Performance Assessment/Inspection Planning Tree.
The second phase of the assessment will consist of a two week on-site assessment scheduled to begin on February 26, 1996.
During this phase of the assessment, the team will validate its preliminary observations as well as draw conclusions in those areas originally considered to be indeterminate.
The results of the on-site as~essment will be evaluated along with those of the in office review and documented in a Final Assessment Report.
The final results will also be depicted on a Final Performance Assessment/Inspection Planning Tree.
io/
---9602200219 960212 PDR ADOCK 05000280 G
PDR inc nu. c1:Nffl\\ coP~
~,
..
I
,(
...
- " ~
J.P. 0' Han 1 on-2-
This preliminary information is being provided for your information only.
No response to this letter or the preliminary assessment is required.
Should you have any questions concerning this prelimin~~y assessment, or the assessment process in general, please contact the assessment team leajer Mr. Peter S. Koltay.at (301).415-2957.
Enclosure:
Inspection Report
cc:
See next page.
.
Sincerely,
Michael R. Johnson,
ting Chief
Special Inspection Branch
Division of Inspection and Support Programs
Office of Nuclear Reactor Regulation
..
'f.
-...
Mr. Virginia Electric and Power Company
cc:
Mr. Michael W. Maupin, Esq.
Hunton and Williams
Riverfront Plaza, East Tower
951 E. Byrd Street
Richmond, VA
23219
Mr. David Christian, Manager
Surry Power Station
Virginia Electric and Power Company
5570 Hog Island Road
Surry, VA
23883
Senior Resident Inspector
Surry Power Station
U.S. Nuclear Regulatory Commission
5850 Hog Island Road
Surry, VA
23883
Chairman
Board of Supervisors of Surry County
Surry County Courthouse
Surry, VA
23683
Dr. W. T. Lough
Virginia State Corporation
Commission
Division of Energy Regulation
P. 0. Box 119 7
Richmond, VA
23209
Regional Administrator, Region II
U.S. Nuclear Regulatory Commission
101 Marietta Street N.W., Suite 2900
Atlanta, GA
30323
Robert B. Strobe, M.D., M.P.H.
State Health Convnissioner
Office of the Commissioner
P.O. Box 2448
Richmond, VA
23218
Surry Power Station
Office Jr the Attorney General
Convnonwealth of Virginia
900 East Main Street
Richmond, VA
23219
Mr. M.L. Bowling, Manager
Nuclear Licensing & Operations
Support
Innsbrook Technical Center
Virginia Electric and Power Company
5000 Dominion Blvd.
Glen Allen, VA
23060
Mt. A 1 Be 1 is 1 e
U.S. Nuclear Regulatory Commission
101 Marietta Street, N.W. Suite 2900
Atlanta, GA
30323-0199