Text
- =.
.
-
-
. -
..
_
.. _
- }
--
-
.m_-
,
[ h' n >,' [
f,h.!A U F, HDM
.
'
e;
. caggg.pg0RMAT10N r
'
,
- .d /
&-
(o NUCLEAR REGULATORY COMMISSION
,
g N
f REGloN 11 c(
g 101 M ARIETTA STR E E T, N.W.
-
g
$
[
ATL ANT A. GEORGI A 3o303
g *-
f j fW o
-
/j l
s..*
'
i In Reply Refer To:
NOV 7 1978 RII:RJ1f
Wj 50-280/78-26 and 50-281/78-26
,
l Virginia Electric and Power Company
Attn:
Mr. W. L. Proffitt i
Senior Vice President, Power
!
P.O. Box 26666 i
Richmond, Virginia 23261
!
Gentlemen:
i This refers to the inspection conducted by Mr. R. J. Hennessey, Jr., of l
this' office on September 24-29, 1978, of activities authorized by NRC i
Operating License Nos. DPR 32 and DPR 37 at Surry 1 and 2 and to the
!
discussion of our findings held with Mr. T. L. Baucom at the conclusion of l k.k the inspection.
j The area examined during this inspection was your program for safeguarding
,
special nuclear material under the applicable provisions of Title 10, Code
-
of Federal Regulations, Part 73, " Physical Protection of Plants and Materials."
i Within this area, the inspection consisted of selective examinations of pro-cedures and representative records, interviews with personnel, and observations
i
~by the inspectors.
l
'
!
i During the inspection, 'it was found that certain activities under your I
license appear to be in noncompliance with NRC requirements. These items j
and references to pertinent requirements are listed in the Notice of
Violation enclosed herewith as Appendix a This notice is sent to you l
4; pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice,"
i Part 2, Title 10, Code of Federal Regulations. Section 2.201 requires you
to submit to this office, within 20 days of your receipt of this notice, a written-statement or explanation in reply including:
(1) corrective steps j
j which have been taken by you and the results achieved; (2) corrective steps l
which will be taken to avoid further noncompliance; and (3) the date when i
full compliance will be achieved. Details of activities involving safeguards and security measures are exempt from disclosure in accordance with 10 CFR l
2.790(d). Therefore, your response should be incorporated in a separate paper and referenced in your reply.
I In accordance with-Section 2.790(d) of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, activities involving safe-guards and security measures are exempt from public disclosure; therefore, j
the enclosures to-this letter with the exception of the report cover page,
which is an inspection summary, will ng be placed in the Public Document Room.
<
!
!
- Q1N$MM b
t
- yp!,ms usoisWE01 78112 0 0 3 3 f.
c;.
!
i-
-.
.
,
.
..
.
. i
ll?,7tPid.TRA?iSMffTED H'EREWITH
'
'
l 00;t[.6,ii;2 7.71W.n3AT:1
'
Virginia Electric and Power Company-2-
'
NOV 7 1978
,
.,
Should you have any questions concerning this letter, we will be glad to
' "kM3 discuss them with you.
Sincerely, ln e
'y-l *-
'
M
.
'
W. B. Ken a, Chief
,
Safeguar Branch Enclosure:
1. Appendix A. Notice of Violation
'
(Exempt from Disclosure)
2. Inspection Report Nos. 50-280/78-26 and 50-281/78-26
,
(Exempt from Disclosure)
t.
3. Inspection Summary (Not Exempt)
'
+
cc w/ enc 1:
Mr. T. L. Baucom, Manager Surry Power Station e
P. O. Box 315 Surry, Virginia 23883
,
,
,
.-
$
k i
.
, 03:G!,!!is 2.790 INFORMATION