Category:Memoranda
MONTHYEARML23276A6522023-10-11011 October 2023 Pre-submittal Meeting Summary, September 14, 2023 CLI-22-04, Change Letter to Peach Bottom Subsequent Renewed Licenses March 17 2022 Rev 12022-03-25025 March 2022 Change Letter to Peach Bottom Subsequent Renewed Licenses_March 17 2022_Rev 1 ML21309A5482021-11-15015 November 2021 NSIR Staff Review of the Wolf Creek Generating Stations Security Plan Training & Qualification Plan & Safeguards Contingency Plan for the Verification of ASM EA 20 091 Incorporation ML21277A2472021-11-0505 November 2021 Notification of Significant Licensing Action - Proposed Issuance of Order Approving the Transfer of Licenses for Which a Hearing Has Been Requested - Exelon Generation Company, LLC; Et. Al ML21243A4492021-09-0202 September 2021 ISFSI Technical Assistance Request - Review of Physical Security Plan ML20296A3342020-10-21021 October 2020 ISI Remote Inspection - Supplemental Request for Information ML19088A0462019-03-26026 March 2019 Submittal of 2018 Occupational Exposure Report (1O CFR 20.2206(b) ML18288A1942018-10-25025 October 2018 Summary of the Site Visit Related to the Review of the Subsequent License Renewal Application for the Peach Bottom Atomic Power Station Units 2 and 3 ML18151A1632018-06-0404 June 2018 Summary of Peach Bottom Annual Assessment Meeting and Attendee List ML18100A2112018-04-26026 April 2018 Notice of Public Meeting May 24, 2018 ML18044A1632018-02-20020 February 2018 01/18/2018 Summary of Pre-Application Meeting with Exelon Corporation Regarding the Peach Bottom, Units 2 and 3, Subsequent License Renewal Application ML17271A0532017-09-29029 September 2017 2017 Summary of Annual Decommissioning Funding Status Reports for Reactors in Decommissioning ML17142A2382017-05-25025 May 2017 OEDO-17-00280 - Briefing Package for Drop-In Visit on June 9, 2017, by Senior Management of Exelon Generation Company, LLC with Chairman Svinicki, Commissioner Baran, and Commissioner Burns ML17090A1282017-04-0505 April 2017 Notice of Public Meeting with Exelon Generation Company, LLC to Discuss Nrc'S Assessment of Safety Performance at Peach Bottom Atomic Power Station for 2016 ML16221A6802016-08-0808 August 2016 Draft Request for Additional Information ML16209A2042016-07-27027 July 2016 Draft Request for Additional Information ML16088A2052016-03-28028 March 2016 Enclosure 1 - (72.30 DFP Reviews to Be Completed 2015) - Memo T Bowers from s Ruffin, Technial Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations ML16088A2042016-03-28028 March 2016 Memo T Bowers from s Ruffin, Technical Assistance Requests - Review 2015 Tri-Annual Decommissioning Funding Plans for Multiple Independent Spent Fuel Storage Installations W/ Encl 2 (Template) ML16075A3292016-03-16016 March 2016 OEDO-16-00165 - Briefing Package for Drop-In Visit on March 23, 2016, by Senior Management of Exelon Generation Company, LLC with the NRC Executive Director for Operations ML16056A5632016-02-25025 February 2016 Draft Request for Additional Information ML15253A5802015-09-0909 September 2015 Draft Request for Additional Information ML15223A5152015-08-10010 August 2015 Draft Request for Additional Information ML15205A3562015-07-24024 July 2015 Draft Request for Additional Information ML15127A2472015-05-0606 May 2015 Draft Request for Additional Information ML15127A5182015-05-0505 May 2015 Draft Request for Additional Information (Tac No. MF4792) ML15110A0602015-04-17017 April 2015 Draft Request for Additional Information ML15098A0392015-04-0808 April 2015 Draft Request for Additional Information ML15078A0832015-03-19019 March 2015 Draft Request for Additional Information (TAC Nos. MF5172 and MF5173) ML15077A2742015-03-18018 March 2015 March 26, 2015, Forthcoming Closed Meeting with Exelon Generation Company, LLC, (Exelon) to Discuss Steam Dryer Analysis Methodology Change for Peach Bottom Atomic Power Station (Pbaps), Unit 2 ML15056A0462015-02-24024 February 2015 Draft Request for Additional Information ML14349A7072014-12-12012 December 2014 Draft Request for Additional Information ML14309A7732014-11-0404 November 2014 Draft Request for Additional Information ML14133A0592014-07-0101 July 2014 Summary of Closed Meeting Between Representatives of the Army Corps of Engineers, Nuclear Regulatory Commission, Federal Energy Regulatory Commission, Exelon Generation Co, LLC, and PPL Susquehanna, LLC, to Discuss Dam Failure Analysis.. ML14112A2392014-04-22022 April 2014 Notice of Forthcoming Closed Meeting to Discuss Dam Failure Analysis for Peach Bottom Atomic Power Station Units 2 and 3, Susquehanna Steam Electric Station Units 1 and 2, and Three Mile Island Nuclear Station Unit 1 ML14063A3862014-03-0606 March 2014 Notice of Forthcoming Closed Meeting with Exelon Generation Company, LLC (Exelon) to Discuss Steam Dryer Analysis Related to Proposed Extended Power Uprate (EPU) for Peach Bottom Atomic Power Station (Pbaps), Unit Nos. 2 and 3 ML14056A1152014-02-24024 February 2014 Draft Request for Additional Information ML13309A0802013-12-11011 December 2013 Memorandum to File: Transcript for 10 CFR 2.206 Petition from Beyond Nuclear (Et Al) Regarding General Electric Mark I and Mark II Boiling-Water Reactors ML13338A2502013-12-0404 December 2013 Notice of Forthcoming Closed Meeting with Exelon Generation Company, LLC (Exelon) to Discuss Steam Dryer Analysis Related to Proposed Extended Power Uprate (EPU) for Peach Bottom Atomic Power Station (Pbaps), Units 2 and 3 ML13261A1572013-09-17017 September 2013 Draft Request for Additional Information ML13190A3522013-07-10010 July 2013 Notice of Forthcoming Teleconference with Exelon Generation Company, LLC ML13154A2762013-03-0606 March 2013 NRC Comments on Draft Licensee-Developed Exam (Operating) (Folder 2) ML13063A3372013-03-0404 March 2013 Draft Request for Additional Information ML12348A6962012-12-17017 December 2012 1/3/2013 - Notice of Forthcoming Meeting with Exelon Generation Company, LLC, to Discuss Requests for Additional Information Regarding Exelon Physical Security Plans ML12310A4882012-11-0505 November 2012 Draft Request for Additional Information ML12236A1542012-08-22022 August 2012 Draft Request for Additional Information ML12194A6082012-07-12012 July 2012 Draft Request for Additional Information ML12137A1792012-05-17017 May 2012 Forthcoming Pre-submittal Public Meeting with Exelon Generation Company, LLC Regarding LaSalle Extended Power Uprate Replacement Steam Dryer ML1208602902012-03-26026 March 2012 Notice of Forthcoming Public Meeting with Exelon Generation to Discuss Future Fleet Submittal Regarding Licensed Operator Eligibility Requirements ML1206600702012-03-0606 March 2012 02/21-22/2012 Meeting Summary with State-Of-The-Art Reactor Consequence Analyses (Soarca) for Public Meetings at Peach Bottom and Surry ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) 2023-10-11
[Table view] |
Text
September 16, 2002 MEMORANDUM TO: File FROM: David C. Lew, Chief /RA by J. T. Yerokun Acting for/
Performance Evaluation Branch Division of Reactor Safety Region I SUBJECT: EXELON GENERATION COMPANY, LLC PEACH BOTTOM ATOMIC POWER STATION SUMMARY OF PUBLICALLY OBSERVED INSPECTION 50-277/02-10 EXIT MEETING ON AUGUST 15, 2002 On August 15, 2002 at 7:00 p.m., an exit meeting was conducted at the Peach Bottom Inn, Restaurant and Lounge, between the Nuclear Regulatory Commission (NRC) staff and Exelon Generation Company, LLC. The purpose of the meeting was for the NRC staff to convey the results of the NRC team inspections conducted as part of the review of Exelons application for license renewal for Peach Bottom Atomic Power Statio The meeting was opened by Michael Modes, Senior Reactor Inspector, Division of Reactor Safety and leader of the team inspection. The meeting was attended by Wayne Lanning, Division Director, Division of Reactor Safety. The NRC briefly summarized the findings of the inspection. Approximately 6 people, other than the NRC and Exelon, attended the meetin At the end of the meeting between Exelon and the NRC public attendees were offered the opportunity to ask questions of NRC officials. Numerous questions were asked over a two hour period. The following issues were discussed: dry cask storage, fuel pool integrity, financial liability and license renewal. These questions and comments were addressed by NRC management.
DOCUMENT NAME: G:\PEB\MMODES\PB_MTG_SUMMARY.WPD After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRS NAME DLew (JTY for)
DATE 09/16/02 09/ /02 09/ /02 09/ /02 09/ /02 OFFICIAL RECORD COPY