IR 05000277/1984040
| ML20138E862 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 10/15/1985 |
| From: | Ebneter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Daltroff S PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20138E867 | List: |
| References | |
| NUDOCS 8510250132 | |
| Download: ML20138E862 (1) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
. _ _ _ _-
._
1 3 is 1. -
,
r a
i l
Docket Nos. 50-277 OCT 151985 i
50-278 Philadelphia Electric Company
,
l ATTN: -Mr. S. L. Daltroff l
Vice President-Electric Production
.2301 Market Street Philadelphia, Pennsylvania 19101 Gentlemen:
L
.
Subject: Combined Inspection Report Nos. 50-277/84-40 and 50-278/84-19
!
This refers to your letter dated April 12, 1985, in response to our letter dated March 8, 1985.
l Thank you for informing us of the corrective and preventive actions documented
!
in your letter. Your response however-failed to include a date when full l
compliance was to be achieved. This is a requirement of 10 CFR 2.201(a)(3).
It is our understanding in speaking with Mr. Spitko of your staff that full compliance has been achieved.
Your actions in this area will be examined during a future inspection of your licensed program.
Your cooperation with us is appreciated.
Sincerely, Orisical W C #
Jacque ti. Darr Stewart D.'Ebneter, Director Division of Reactor Safety ec:
!
R. S. Fleischmann, Station Superintendent
'
John S. Kemper, Vice President Engineering and Research Troy B. Conner, Jr., Esquire A. J. Pietrofitta, General Manager, Power Production Engineering, Atlantic Electric I
Eugene J. Bradley, Esquire, Assistant General Counsel l
Raymond L'. Hovis, Esquire Thomas Magette, Power Plant Siting, Nuclear Evaluations Pubite Document Room (POR) (LPOR)
Local Public Document Room l
l Nuclear $sfety Information Center (N,!C)
NRC. Resident Inspector Commonwealth of Pennsylvania go2gg $
l bec:
Region ! Docket Room (w/ concurrences)
m b pR,w u n w, ors Q
. i,
,
Ri, ors Ri