November 7, 2002
SUBJECT:
VERMONT YANKEE - NRC INTEGRATED INSPECTION REPORT 50-271/02-06
Dear Mr. Thayer:
On September 28, 2002, the NRC completed an inspection at your Vermont Yankee facility.
The enclosed report documents the inspection findings which were discussed on October 10, 2002, with Mr. Mike Balduzzi and other members of your staff.
This inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. No findings of significance were identified during this inspection.
The NRC has increased security requirements at the Vermont Yankee Nuclear Power Station in response to terrorist acts on September 11, 2001. Although the NRC is not aware of any specific threat against nuclear facilities, the NRC has issued an Order and several threat advisories to commercial power reactors to strengthen licensees capabilities and readiness to respond to a potential attack. The NRC continues to inspect the licensees security controls and its compliance with the Order and current security regulations.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects Docket No.
50-271
J. License No.
DPR-28 Enclosure:
Inspection Report 50-271/02-06 Attachment:
Supplementary Information cc w/encl:
M. R. Kansler, Senior Vice President and Chief Operating Officer M. Hamer, Operating Experience Coordinator - Entergy Nuclear Vermont Yankee, LLC J. Kelly, Director, Licensing, Entergy Nuclear Operations, Inc.
G. Sen, Manager, Licensing, Entergy Nuclear Vermont Yankee, LLC D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire Chief, Safety Unit, Office of the Attorney General, Commonwealth of Massachusetts D. Lewis, Esquire G. Bisbee, Esquire J. Block, Esquire D. Katz, Citizens Awareness Network (CAN)
M. Daley, New England Coalition on Nuclear Pollution, Inc. (NECNP)
R. Shadis, New England Coalition Staff State of New Hampshire, SLO Designee State of Vermont, SLO Designee S. McGrail, Commonwealth of Massachusetts, SLO Designee G. Sachs, President/Staff Person, c/o Stopthesale