March 18, 2002
SUBJECT:
VERMONT YANKEE - NRC INSPECTION REPORT 50-271/01-13
Dear Mr. Balduzzi:
On February 16, 2002, the NRC completed an inspection at your Vermont Yankee facility. The enclosed report documents the inspection findings which were discussed on February 28, 2002, with you and other members of your staff.
This inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. There were no findings of significance identified.
Immediately following the terrorist attacks on the World Trade Center and the Pentagon, the NRC issued an advisory recommending that nuclear power plant licensees go to the highest level of security, and all promptly did so. With continued uncertainty about the possibility of additional terrorist activities, the Nation's nuclear power plants remain at the highest level of security and the NRC continues to monitor the situation. This advisory was followed by additional advisories, and although the specific actions are not releasable to the public, they generally include increased patrols, augmented security forces and capabilities, additional security posts, heightened coordination with law enforcement and military authorities, and more limited access of personnel and vehicles to the sites. The NRC has conducted various audits of your response to these advisories and your ability to respond to terrorist attacks with the capabilities of the current design basis threat (DBT). On February 25, 2002, the NRC issued an Order to all nuclear power plant licensees, requiring them to take certain additional interim compensatory measures to address the generalized high-level threat environment. With the issuance of the Order, we will evaluate VY's compliance with these interim requirements.
Michael In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Clifford J. Anderson, Chief Projects Branch 5 Division of Reactor Projects Docket No.
50-271 License No.
DPR-28 Enclosure:
Inspection Report 50-271/01-13 Attachment:
Supplementary Information cc w/encl:
M. Hamer, Operating Experience Coordinator - Vermont Yankee G. Sen, Licensing Manager, Vermont Yankee Nuclear Power Corporation D. Tefft, Administrator, Bureau of Radiological Health, State of New Hampshire Chief, Safety Unit, Office of the Attorney General, Commonwealth of Massachusetts D. Lewis, Esquire G. Bisbee, Esquire J. Block, Esquire T. Rapone, Massachusetts Executive Office of Public Safety D. Katz, Citizens Awareness Network (CAN)
M. Daley, New England Coalition on Nuclear Pollution, Inc. (NECNP)
R. Shadis, New England Coalition Staff State of New Hampshire, SLO Designee State of Vermont, SLO Designee Commonwealth of Massachusetts, SLO Designee
Michael