IR 05000267/1979020

From kanterella
Jump to navigation Jump to search
IE Insp Rept 50-267/79-20 on 791203-07.No Noncompliance Noted.Major Areas Inspected:Security Plan,Security Program Audit,Security Organization & Protected Area Physical Barriers.Details Withheld (Ref 10CFR2.790)
ML19257B694
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 12/28/1979
From: Caldwell R, Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19257B692 List:
References
50-267-79-20, NUDOCS 8001180140
Download: ML19257B694 (1)


Text

-

.

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION IV

Report No. 50-267/79-20 Docket No. 50-267 Licensee No. DPR-34 Licensee:

Public Service Company of Colorado P. O. Box 840 Denver, Colorado 80201 Facility Name:

Fort St. Vrain Nuclear Generating Station Inspection At:

Platteville, Colorado Inspection Conducted:

December 3-7, 1979 Date of Last Pysical Security Inspection Visit: May 20-25, 1979 Type of Inspection:

Unannounced Physical Security Inspection Inspectors:

ggggh

/ 2 hy/7p R. A. Caldwell, Physical Security / Investigation Date Specialist Approved by:

/ 2 /2J/7 pr

'

'G. L. Madsen, Chief. Reactor Operation and Date Nuclear Support Branch Inspection Summary Areas Inspected:

Included a review of Security Plan, the Security Program Audit, Security Organization, Protected Area Physical Barriers, and Lighting; Access Control (Identification, Authorization, and Badging); Access Control (Search); Alarm Stations; Testing and Maintainence; Compensatory Measures; Records and Reports; Follow-up on previous items of noncompliance, deviations, and follow-up on IE Circular 79-16.

The inspection involved (38) inspector hours on-site by one (1) NRC inspector.

Results: The licensee was found to be in compliance with NRC requirements within all the areas examined during this inspection.

,

2280 [

'

g jrg4