IR 05000263/2013404

From kanterella
Jump to navigation Jump to search
IR 05000263-13-404; 12/08/13 - 12/11/13 and 02/06/14 - 02/07/14; Monticello Nuclear Generating Plant; Temporary Instruction (Ti) 2515/186, Inspection of Procedures and Processes for Responding to Potential Aircraft Threats. (Cover Letter On
ML14073A116
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 03/12/2014
From: Hironori Peterson
Operations Branch III
To: Fili K
Northern States Power Co
Michael Bielby
References
IR-13-404
Download: ML14073A116 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION rch 12, 2014

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT; TEMPORARY INSTRUCTION 2515/186, "INSPECTION OF PROCEDURES AND PROCESS FOR RESPONDING TO POTENTIAL AIRCRAFT THREATS"; INSPECTION REPORT 05000263/2013404

Dear Ms. Fili:

On February 7, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Monticello Nuclear Generating Plant using Temporary Instruction 2515/186, Inspection of Procedures and Processes for Responding to Potential Aircraft Threats. The enclosed inspection report documents the results of the inspection, which were preliminarily discussed with Mr. P. Gardner and other members of your staff.

The objective of this inspection was to assess the implementation procedures and processes of your Monticello Nuclear Generating Plant that are required by Title 10 of the Code of Federal Regulations (CFR) 50.54(hh)(1), which provides the requirements for responding to a potential aircraft threat. The results from this inspection, along with the results from this inspection performed at other operating commercial nuclear plants in the United States, will be used to evaluate the U.S. nuclear industrys readiness to safely respond to similar events. These results will also help the NRC to determine if additional regulatory actions are warranted.

The inspection examined activities conducted under your license as they relate to the implementation of 10 CFR 50.54(hh)(1), your compliance with the Commissions rules and regulations, and with the conditions of your operating licenses. Within these areas, the inspection involved examination of selected procedures and representative records, observations of activities, and interviews with personnel.

Based on results of this inspection, no NRC-identified or self-revealed findings were identified.

However, one observation was identified by the inspectors which required additional clarification and attention by the licensee. The observation was of very low safety significance and was determined not to be a violation of regulatory requirements.

Enclosure transmitted herewith contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. If you contest any finding or the subject in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with copies to the Regional Administrator, Region III; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001; and the NRC Resident Inspector at the Monticello Nuclear Generating Plant.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Should you have any questions regarding this inspection, we will be pleased to discuss the issues with you.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22 Nonpublic Enclosure:

Inspection Report 05000263/2013404 w/Attachment: Supplemental Information cc w/encl: N. Simonian, NSIR/DSO/DDSO/ST W. Gott, NSIR/DPR E. Wharton, NSIR B. Huffman, NSIR/DPR/DDIR/OB T. Dimitriadis, RI J. Kozal, NSIR/DPR/DDIR/CB B. Desai, RII R. Skokowski, RIII M. Haire, RIV Distribution via ListServ TM