IR 05000263/1985017

From kanterella
Jump to navigation Jump to search
Insp Rept 50-263/85-17 on 850528-31.No Noncompliance Noted. Major Areas Inspected:Security Plan & Implementing Procedures,Mgt Effectiveness,Security Organization & Records.Details Withheld (Ref 10CFR73.21)
ML20126K079
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 06/12/1985
From: Creed J, Kniceley J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20126K066 List:
References
50-263-85-17, NUDOCS 8506190158
Download: ML20126K079 (1)


Text

<

. ..

U.S. NUCLEAR REGULATORY COMMISSION

REGION III

Report No. 50-263/85017(DRSS)

Docket No. 50-263 License No. OPR-22 Safeguards Group IV Licensee: Northern States Power Company 414 Nicollett Mall Minneapolis, MN 55401 Facility Name: Monticello Nuclear Generating Station Inspection At: Monticello Site, Monticello, MN Inspection Conducted: May 28-31, 1985 Date of Last Physical Protection Inspection: August 6-10, 1984 Inspector: $) O J. R. Kniceley '

h Date Physical Security Inspector Approved By: N-J. R. Creed, Chief h Date Safeguards Section Inspection Summary Inspection conducted May 28-31, 1985 (Report No. 50-263/85017(DRSS))

Areas Inspected: Included a review of Security Plan and Implementing Procedures; Management Effectiveness; Security Organization; Security Program Audit; Records and Reports; Testing and Maintenance; Locks, Keys, and Combinations; Physical Barriers - Protected Areas; Physical Barriers - Vital Areas; Security System Power Supply; Lighting; Compensatory Measures; Assessment Aids; Access Control - Personnel, Packages, and Vehicles; Detection Aids - Protected and Vital Areas; Alarm Stations; Communications; Personnel Training and Qualifications - General Requirements; Safeguards Contingency Plan Implementation and Spent reactor fuel physical protection requirements and shipping activities of irradiated fuel. The inspection involved 30 inspector-hours of direct inspection effort by one NRC inspector. The inspection began during the day shift; four hours of inspection activity were accomplished during off-shift period Results: The licensee was found to be in compliance with NRC requirements in the areas examined during this inspectio (Details - UNCLASSIFIED )

8506190158 850612 Enclo m oINFCL co M .a}T Wa PDR ADOCK 05000264 SAFECUMDS G PDR Upon ccparation this pg o is D controlled