O.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT

REGION III

Report No. 50-263/B0-13 Docket No. 50-263 License No. DPR-22 Safeguards Group IV Licensee: Northern States Power Company 414 Nicollet Mall Minneapolis, MN 55401 Facility Ncme: Monticello Nuclear Power Station Inspection At: Monticello Station, MN

.

hern States Power Corporate Offices

.nneapolis, MN Inspection Conducted: June 9-13, 1980 Date of Last Physical Security Inspection:

February 4-8, 1980 Type of Inspection: Unannounced Physical Security

)?(.

Mhd d -# 7N Inspectors:

G. M. Christoffer Date

Physical Security Specialist hbA

,

6/se/Fa J. Madeda f

' Ddte Physical Security Specialist

!8d Approved By:

Me

__7

(I. A. Hind, Chief

~

Date Safeguards Branch Inspection Summarv Areas Inspected:

Included a review of the Security Plan; Security Program Audit; Security Organization; Protected Area Physical Barriers; Vital Area Physical Barriers; Lighting; Access Control (Identification, Authorization and Badging); Access Control (Search); Access Control (Escorting); Access Control (Vital Areas); Alarm Stations; Detection Aids; Assessment Aids; Communications; Testing and Maintenance; Compensatory Measures; Power Supply; Response; Locks, Keys and Combinations; Records and Reports; Licensee Action on Previous Inspection Findings; and Indepeident Inspection Effort. The inspection involved 77 inspector hours onsite bi two NRC inspectors. The inspection began during the day shift; 14 inspection hours were accomplished during offshift periods.

Results: The licensee was found to be in compliance with NRC requirements within the 20 areas examined during the inspection except for the following four items:

(Details Part 2.790(d) Information)

8 u 0 7 '2 4 010 )

-

.

t

-

,

.

-

1.

Access Control - Searching - Some hand-carried packages were not pro-perly searched.

(Infraction)

2.

Security Organization - Failure of one member of the security organization to meet requirements identified in the security plan.

(Deficiency)

3.

Physical Barriers (Vital Area) - The licensee failed to properly secure an opening in a vital area barrier.

(Deficiency)

4.

Access Control (Identification. A thorization and Badging) - The licensee did not conduct proper personnel screening in accordance with a security plan commitment.

(Deficiency)

In addition, one unresclved item was identifled, which is being forwarded to NRC Headquarters for evaluation.

S-r3 j*d-7/

"

-2-c:py of copies c.n:es.

"TE '. ;Ci?.F.HT IS NOT TO EE

.... c. :'JOED '4ITHOUT SPE0ITIC APPR0 VAL CF RIII