June 27, 2003

SUBJECT:

QUAD CITIES POWER STATION, UNITS 1 AND 2 NRC INSPECTION REPORT 50-254/03-08(DRS); 50-265/03-08(DRS)

Dear Mr. Skolds:

This refers to the inspection conducted on June 3, 2003, at the Quad Cities Power Station.

The enclosed report documents the inspection findings which were discussed initially on June 3, 2003, with Mr. T. Tulon and other members of your staff and subsequently with Mr. W. Beck, of your staff, on June 26, 2003.

This inspection was an examination of activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license. Specifically, the inspectors reviewed your record keeping and reporting practices with regard to medical examinations of licensed operators. Within this area, the inspection consisted of selected examination of procedures and representative records, and interviews with personnel.

Based on the results of this inspection no findings of significance were identified.

In accordance with 10 CFR Part 2.790 of the NRC's Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Roger Lanksbury, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-254; 50-265 License Nos. DPR-29; DPR-30 Enclosure:

Inspection Report No. 50-254/03-08(DRS);

50-265/03-08(DRS)

cc w/encl:

Site Vice President - Quad Cities Nuclear Power Station Quad Cities Nuclear Power Station Plant Manager Regulatory Assurance Manager - Quad Cities Chief Operating Officer Senior Vice President - Nuclear Services Senior Vice President - Mid-West Regional Operating Group Vice President - Mid-West Operations Support Vice President - Licensing and Regulatory Affairs Director Licensing - Mid-West Regional Operating Group Manager Licensing - Dresden and Quad Cities Senior Counsel, Nuclear, Mid-West Regional Operating Group Document Control Desk - Licensing Vice President - Law and Regulatory Affairs Mid American Energy Company M. Aguilar, Assistant Attorney General Illinois Department of Nuclear Safety State Liaison Officer, State of Illinois State Liaison Officer, State of Iowa Chairman, Illinois Commerce Commission W. Leach, Manager of Nuclear MidAmerican Energy Company R. Armitage, Training Manager

SUMMARY OF FINDINGS

IR 05000254/2003-008(DRS); 05000265/2003-008(DRS), Exelon Generation Company, LLC, 06/03/2003; Quad Cities Nuclear Power Station; Routine Baseline Inspection Report This report covers a 1-day period of baseline announced inspection, conducted by regional specialist inspectors. No findings of significance were identified.

A.

Inspector Identified Findings No findings of significance were identified.

B.

Licensee Identified Findings No findings of significance were identified.

REPORT DETAILS

Summary of Plant Status

During this inspection period, Unit 1 was at full achievable power and Unit 2 was at 85 percent power.

REACTOR SAFETY

Cornerstones: Initiating Events, Mitigating Systems, and Barrier Integrity

1R11 Licensed Operator Requalification

a. Inspection Scope

The inspectors evaluated the facility and individual operator licensees conformance with the requirements of 10 CFR Part 55. Specifically, the inspectors reviewed 14 licensed operators medical records maintained by the facility and assessed compliance with the medical standards delineated in ANSI/ANS-3.4, American National Standard Medical Certification and Monitoring of Personnel Requiring Operator Licenses for Nuclear Power Plants, 1983, and with 10 CFR 55.21 and 10 CFR 55.25. In addition, the inspectors interviewed one senior reactor operator, one registered nurse assigned to Quad Cities Station, the nurses supervisor, and the operations support manager. The operations support manager was the owner of the administrative process for maintaining NRC license and medical requirements at Quad Cities Station. Finally, the inspectors reviewed corrective action documentation for previously identified potential problems in the licensed operator medical qualification subject area.

b. Findings

No findings of significance were identified.

4OA6 Meetings

Exit Meetings The inspectors presented the inspection results to Mr. T. Tulon and other members of licensee management at the conclusion of the inspection on June 3, 2003. The licensee acknowledged the findings that were presented. The inspectors asked the licensee whether any materials examined during the inspection should be considered proprietary.

No proprietary information was identified. The inspectors re-exited per telecon with Mr. W. Beck, the regulatory assurance manager on June 26, 2003, to present the final results of the inspection.

ATTACHMENT:

SUPPLEMENTAL INFORMATION

KEY POINTS OF CONTACT

Licensee

T. Tulon, Site Vice President
C. Swenson, Plant Manager
M. Babak, Quad Cities Site Nurse
J. Bartlett, Operations Training Manager
W. Beck, Regulatory Assurance Manager
J. Boyles, Operations Support/Services Manager
T. Fuhs, Regulatory Assurance Representative
B. Stevens, Exelon Medical Services Supervisor

Nuclear Regulatory Commission

R. Lanksbury, Chief, Operator Licensing Branch
R. Telson, Acting Senior Resident Inspector

LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED

Opened

None.

Closed

None.

Discussed

None.

LIST OF DOCUMENTS REVIEWED