IR 05000237/2012501

From kanterella
Jump to navigation Jump to search
IR 0500237-12-501 & 05000328-12-501; 12/31/2012; Sequoyah Nuclear Plant - U.S Nuclear Regulatory Commission Emergency Preparedness Annual Inspection Report
ML13016A009
Person / Time
Site: Dresden, Sequoyah  
Issue date: 01/16/2013
From: Brian Bonser
NRC/RGN-II/DRS/PSB1
To: James Shea
Tennessee Valley Authority
Linda K. Gruhler 404-997-4633
References
IR-12-501
Download: ML13016A009 (4)


Text

January 16, 2013

SUBJECT:

SEQUOYAH NUCLEAR PLANT - U.S. NUCLEAR REGULATORY COMSSION EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NO.

05000327/2012501 AND 05000328/2012501

Dear Mr. Shea:

On December 31, 2012, the U.S. Nuclear Regulatory Commission (NRC) staff completed its annual inspection of the Emergency Preparedness Program at the Sequoyah Nuclear Plant.

This inspection began on January 1, 2012. Issuance of this letter closes Inspection Report Number 2012501. Inspection activities charged to these reports include conducting midcycle/end of cycle assessment activities, responding to technical questions from resident inspectors or licensee personnel, NRC headquarters review of emergency action level and emergency plan changes, and in some cases, performing traditional enforcement activities. Any observations and findings in these areas were provided to you via separate correspondence.

In accordance with 10 CFR 2.390 of the NRC Rules of Practice, a copy of this letter, and your response, if any, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Brian Bonser, Chief Plant Support Branch 1 Division of Reactor Safety

Docket Nos. 50-327 and 50-328 License Nos. DPR-77, DPR-79

cc: (See page 2)

ML13016A009

X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE RII:DRS RII:DRP RII:DRS

SIGNATURE

  • DJB4 for MES4 *SMS via e-mail BRB1

NAME M. Speck S. Shaeffer B. Bonser

DATE 12/ 27 /2012 12/ 27 /2013 1/ 15 /2013

E-MAIL COPY YES NO YES NO YES NO

2 cc:

J. T. Carlin Site Vice President Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution

P. R. Simmons Plant Manager Sequoyah Nuclear Plant Tennessee Valley Authority Electronic Mail Distribution

J. W. Proffitt Manager, Site Licensing Sequoyah Nuclear Plant Electronic Mail Distribution

C. D. Mackaman Program Manager, Corporate Licensing Tennessee Valley Authority Electronic Mail Distribution

Edward J. Vigluicci Associate General Counsel, Nuclear Tennessee Valley Authority Electronic Mail Distribution

County Mayor 208 Courthouse 625 Georgia Avenue Chattanooga, TN 37402-2801

Tennessee Department of Environment & Conservation Division of Radiological Health 401 Church Street Nashville, TN 37243

Senior Resident Inspector U.S. Nuclear Regulatory Commission Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, TN 37379-3624

Ann Harris 341 Swing Loop Rockwood, TN 37854

Letter to Joseph from Brian Bonser dated January 16, 2013.

SUBJECT: SEQUOYAH NUCLEAR PLANT - U.S. NUCLEAR REGULATORY COMSSION EMERGENCY PREPAREDNESS ANNUAL INSPECTION REPORT NO.

05000327/2012501 AND 05000328/2012501

DISTRIBUTION:

S. Shaeffer, RII, DRP J. Hamman, RII, DRP C. Jones, RII, RIDP R. Lewis, RII, SRI G. Smith, RII, SRI W. Deshane, RII, RI C. Evans, RII EICS L. Douglas, RII EICS RIDSNRRDIRS PUBLIC R. Pascarelli, NRR RidsNrrPMSequoyah Resource