August 28, 2025
SUBJECT:
UPDATED INSPECTION PLAN FOR NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2 (REPORTS 05000220/2025005 AND 05000410/2025005)
Dear David Rhoades:
The enclosed inspection plan lists the inspections scheduled through June 30, 2027, for the Nine Mile Point Nuclear Station, Units 1 and 2. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. As discussed in SECY-25-0045, Recommendations for Revising the Reactor Oversight Process, dated June 5, 2025 (ML25042A278), the NRC determined that a broad, comprehensive review of the Reactor Oversight Process (ROP) is necessary to reflect improvements in industry performance and advancements in technology. The outcome of the comprehensive review and recommendations to revise the ROP baseline inspection program, when approved by the NRC Commission, will require a revision to this inspection plan. The NRC will contact you as soon as possible to discuss any revisions after the new baseline inspection program is implemented.
As noted in the attached inspection plan, in addition to baseline inspections, the NRC will implement Inspection Procedure 71003, Post-Approval Site Inspection for License Renewal, Phase 1 and 2, at Nine Mile Point Nuclear Station, Unit 2.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at (610) 337-5358 with any questions you have regarding this letter.
Sincerely, Sherlyn I. Haney, Acting Chief Projects Branch 1 Division of Operating Reactor Safety
Docket Nos. 05000220 and 05000410 License Nos. DPR63 and NPF-69
Enclosure:
Nine Mile Point Inspection Plan
cc w/encl: Distribution via ListServ SHERLYN HANEY Digitally signed by SHERLYN HANEY Date: 2025.08.28 08:33:14 -04'00'
SUNSI Review
Non-Sensitive Sensitive
Publicly Available Non-Publicly Available
OFFICE RI/DORS RI/DORS
NAME DBeacon SHaney
DATE 8/25/2025 8/25/2025
Site Inspection Activity Plan Nine Mile Point 07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count Fire Protection - Nine Mile Point
1,2 7/14/2025 7/18/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
1,2 7/28/2025 8/8/2025 IP 71111.21N.05 001646 Fire Protection Team Inspection (FPTI)
1,2 7/14/2025 7/18/2025 IP 71124.06 000730 Radioactive Gaseous and Liquid Effluent Treatment EP Exercise Inspection - Nine Mile Point
1,2 10/6/2025 10/10/2025 IP 71114.01 000716 Exercise Evaluation 1,2 10/6/2025 10/10/2025 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 10/6/2025 10/10/2025 IP 71151 001397 Performance Indicator Verification NMP2 Requal Inspection with P/F Results
2 10/12/2025 10/18/2025 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance PI&R Biennial Team Inspection - NMP
1,2 10/20/2025 10/24/2025 IP 71152B 000747 Problem Identification and Resolution 1,2 11/3/2025 11/7/2025 IP 71152B 000747 Problem Identification and Resolution RP 71124.08 RadWaste
1,2 10/27/2025 10/31/2025 IP 71124.08 000732 Radioactive Solid Waste Processing & Radioactive Material Handling, Storage, & Transportation Access Control, Maintenance, Sec Trng, SPR, PIs - NMP
1,2 10/27/2025 10/31/2025 IP 71130.02 000734 Access Control 1,2 10/27/2025 10/31/2025 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 10/27/2025 10/31/2025 IP 71130.07 000739 Security Training 1,2 10/27/2025 10/31/2025 IP 71130.09 001656 Security Plan Changes 1,2 10/27/2025 10/31/2025 IP 71151 001338 Performance Indicator Verification 2026 NMP1 Initial Operator Licensing Exam
1 12/15/2025 12/19/2025 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
1/12/2026 1/16/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
2026 NMP2 Initial Operator Licensing Exam
2 1/4/2026 1/10/2026 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
2/9/2026 2/13/2026 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
License Renewal Phase 1 - Nine Mile Point Unit 2
2 3/16/2026 3/27/2026 IP 71003 000687 Post-Approval Site Inspection for License Renewal Inservice Inspection - Nine Mile Point Unit 2
2 3/16/2026 3/20/2026 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
Prepared on 8/25/2025 8:49:49 AM 1 of 4
Site Inspection Activity Plan RP - 71124.01 Rad Hazards
2 3/16/2026 3/20/2026 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Sec - Access Control, SPR, PI Verification - NMP
1,2 4/20/2026 4/24/2026 IP 71130.02 000734 Access Control 1,2 4/20/2026 4/24/2026 IP 71130.09 001656 Security Plan Changes 1,2 4/20/2026 4/24/2026 IP 71151 001338 Performance Indicator Verification License Renewal Phase 2 - Nine Mile Point Unit 2
2 6/8/2026 6/12/2026 IP 71003 000687 Post-Approval Site Inspection for License Renewal
6/22/2026 6/26/2026 IP 71003 000687 Post-Approval Site Inspection for License Renewal ISFSI - Loading Campaign - Nine Mile Point
1,2 6/15/2026 6/19/2026 IP 60855 Operation Of An ISFSI EP Program Inspection - NMP
1,2 8/3/2026 8/7/2026 IP 71114.02 000717 Alert and Notification System Testing 1,2 8/3/2026 8/7/2026 IP 71114.03 000718 Emergency Response Organization Staffing and Augmentation System 1,2 8/3/2026 8/7/2026 IP 71114.04 000719 Emergency Action Level and Emergency Plan Changes 1,2 8/3/2026 8/7/2026 IP 71114.05 000720 Maintenance of Emergency Preparedness 1,2 8/3/2026 8/7/2026 IP 71151 001397 Performance Indicator Verification FORCE-ON-FORCE PLANNING AND EXERCISE WEEKS - NMP
1,2 9/14/2026 9/18/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing 1,2 10/5/2026 10/9/2026 IP 71130.03 000735 Contingency Response - Force-On-Force Testing NMP1 Biennial Requal Inspection
1 10/26/2026 10/30/2026 IP 71111.11B 000704 Licensed Operator Requalification Program and Licensed Operator Performance Commercial Grade Dedication - Nine Mile Point
1,2 11/2/2026 11/6/2026 IP 71111.21N.03 001808 Commercial Grade Dedication 1,2 11/16/2026 11/20/2026 IP 71111.21N.03 001808 Commercial Grade Dedication RP 71151 PIV
1,2 11/9/2026 11/13/2026 IP 71151 001397 Performance Indicator Verification 2027 NMP2 Initial Operator Licensing Exam
2 2/1/2027 2/5/2027 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
3/1/2027 3/5/2027 EXAD 000500 FB-OR-Initial License Exam Administration (EXAD)
Inservice Inspection - Unit 1
1 3/22/2027 3/26/2027 IP 71111.08G 000701 Inservice Inspection Activities (BWR)
1 3/29/2027 4/2/2027 IP 71124.01 000725 Radiological Hazard Assessment and Exposure Controls Sec - Access Control, Equipment Testing and Maintenance, Protective Strategy, SPR, TSR, PI - NMP
Prepared on 8/25/2025 8:49:49 AM 2 of 4
Site Inspection Activity Plan 1,2 5/17/2027 5/21/2027 IP 71130.02 000734 Access Control 1,2 5/17/2027 5/21/2027 IP 71130.04 000736 Equipment Performance, Testing, and Maintenance 1,2 5/17/2027 5/21/2027 IP 71130.05 000737 Protective Strategy Evaluation 1,2 5/17/2027 5/21/2027 IP 71130.09 001656 Security Plan Changes 1,2 5/17/2027 5/21/2027 IP 71130.14 000743 Review of Power Reactor Target Sets 1,2 5/17/2027 5/21/2027 IP 71151 001338 Performance Indicator Verification 71124.07
1,2 6/21/2027 6/25/2027 IP 71124.07 000731 Radiological Environmental Monitoring Program 2027 NMP1 Initial Operator Licensing Exam
1 6/28/2027 7/2/2027 OV 000956 FB-OR-Onsite Validation Of Initial License Examination (OV)
Prepared on 8/25/2025 8:49:49 AM 3 of 4
Site Inspection Activity Plan Nine Mile Point (ISFSI)
07/01/2025 - 06/30/2027 Unit Start End Activity CAC Title Staff Count ISFSI - Loading Campaign - Nine Mile Point
6/15/2026 6/19/2026 IP 60855 001001 Operation Of An ISFSI Prepared on 8/25/2025 8:49:49 AM 4 of 4