IR 05000220/2007502

From kanterella
Jump to navigation Jump to search
IR 05000220-07-502, 05000410-07-502; on 07/31/2007 - 08/16/2007; Nine Mile Point Nuclear Station, Units 1 and 2; Exercise Evaluation; Emergency Action Level and Emergency Plan Changes; Emergency Preparedness Performance Indicators
ML072560560
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 09/13/2007
From: James Trapp
Engineering Region 1 Branch 1
To: Polson K
Nine Mile Point
References
IR-07-502
Download: ML072560560 (11)


Text

ber 13, 2007

SUBJECT:

NINE MILE POINT NUCLEAR STATION - NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE - INSPECTION REPORT NOS.

05000220/2007502 AND 05000410/2007502

Dear Mr. Polson:

On August 16, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the 2007 evaluated emergency preparedness exercise at your Nine Mile Point Nuclear Station. The enclosed inspection report documents the inspection results, which were discussed on August 16, 2007, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety

September 13, 2007 Mr. Keith Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093 SUBJECT: NINE MILE POINT NUCLEAR STATION - NRC EVALUATED EMERGENCY PREPAREDNESS EXERCISE - INSPECTION REPORT NOS.

05000220/2007502 AND 05000410/2007502

Dear Mr. Polson:

On August 16, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection of the 2007 evaluated emergency preparedness exercise at your Nine Mile Point Nuclear Station. The enclosed inspection report documents the inspection results, which were discussed on August 16, 2007, with you and other members of your staff.

The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety SUNSI Review Complete: JMT (Reviewers Initials) ADAMS ACCESSION NO. ML072560560 DOCUMENT NAME: C:\FileNet\ML072560560.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure

"N" = No copy OFFICE RI/DRS RI/DRP RI/DRS NAME SBarr/STB GDentel/GTD JTrapp/JMT DATE 09/13/07 09/13/07 09/13/07 OFFICIAL RECORD COPY Docket Nos: 50-220, 50-410 License No: DPR-63, NPF-69

Enclosure:

Inspection Report Nos. 05000220/2007502 and 05000410/2007502 w/Attachment: Supplemental Information

REGION I

REGION I

Docket No: 50-220, 50-410 License No: DPR-63, NPF-69 Report No: 05000220/2007502 and 05000410/2007502 Licensee: Nine Mile Point Nuclear Station, LLC (NMPNS)

Facility: Nine Mile Point Nuclear Station, Units 1 and 2 Location: Lake Road Oswego, NY Dates: July 31, 2007 through August 16, 2007 Inspectors: S. Barr, Sr. Emergency Preparedness Inspector, DRS, Region I (Lead)

B. Norris, Sr. Project Engineer, DRP, Region I R. Cureton, Emergency Preparedness Inspector, DRS, Region I R. Rolph, Radiation Specialist, DRS, Region I Approved by: James M. Trapp, Chief Plant Support Branch 1 Division of Reactor Safety Enclosure

SUMMARY OF FINDINGS IR 05000220/2007-502, IR 05000410/2007-502; 07/31/2007 - 08/16/2007; Nine Mile Point Nuclear Station, Units 1 and 2; Exercise Evaluation; Emergency Action Level and Emergency Plan Changes; Emergency Preparedness Performance Indicators.

This was an announced inspection conducted by four region-based inspectors. No findings of significance were identified. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 4, dated December 2006.

Cornerstone: Emergency Preparedness A. NRC-Identified and Self-Revealing Findings No findings of significance were identified B. Licensee-Identified Findings None.

ii Enclosure

Report Details 1. REACTOR SAFETY Cornerstone: Emergency Preparedness (EP)

1EP1 Exercise Evaluation (71114.01 - 1 Sample)

a. Inspection Scope Prior to the exercise, an in-office review was conducted of the exercise objectives and scenario submitted to the NRC, to determine if the exercise would test major elements of the emergency plan as required by 10 CFR 50.47(b)(14). A description of the evaluation conducted by the NRC during the exercise is described below. Overall, this inspection activity represented the completion of one sample on a biennial cycle.

The exercise evaluation consisted of the following review and assessment:

  • The adequacy of Nine Mile Points performance in the biennial full-participation exercise regarding the implementation of the risk-significant planning standards (RSPS) in 10 CFR 50.47 (b)(4), (5), (9), and (10), which are emergency classification, offsite notification, radiological assessment, and protective action recommendations, respectively.
  • The overall adequacy of Nine Mile Points emergency response facilities with regard to NUREG-0696, Functional Criteria for Emergency Response Facilities, and Emergency Plan commitments. The facilities assessed were the Control Room Simulator, the Technical Support Center (TSC), the Operations Support Center (OSC), the Joint Information Center (JIC), and the Emergency Operations Facility (EOF).
  • Other performance areas, such as, the emergency response organizations (EROs) recognition of abnormal plant conditions, command and control, intra- and inter-facility communications, prioritization of mitigation activities, utilization of repair and field monitoring teams, interface with offsite agencies, staffing and procedure adequacy, and the overall implementation of the emergency plan and its implementing procedures.
  • Past performance issues from the last NRC exercise report and Nine Mile Points drill reports to determine effectiveness of corrective actions as demonstrated during this exercise to ensure compliance with 10 CFR 50.47(b)(14).
  • The post-exercise critiques to evaluate Nine Mile Points self-assessment of its ERO performance during the exercise and to ensure compliance with 10 CFR 50, Appendix E, Paragraph IV.F.2.g.

The inspectors reviewed the documents listed in the attachment to this report.

Enclosure

b. Findings No findings of significance were identified.

1EP4 Emergency Action Level (EAL) and Emergency Plan Changes a. Inspection Scope (71114.04 - 1 Sample)

Since the last NRC inspection of this program area, Emergency Plan Revisions 51, 52, and 53 were implemented based on the licensees determination, in accordance with 10 CFR 50.54(q), that the changes resulted in no decrease in effectiveness of the Plan, and that the revised Plan continued to meet the requirements of 10 CFR 50.47(b) and Appendix E to 10 CFR 50. The inspectors inspected all EAL changes made since January 2006, and conducted a sampling review of the Emergency Plan changes, and changes to the lower-tier emergency plan implementing procedures, to evaluate for potential decreases in effectiveness of the Emergency Plan. However, this review was not documented in a Safety Evaluation Report and does not constitute formal NRC approval of the changes. Therefore, these changes remain subject to future NRC inspection in their entirety.

b. Findings No findings of significance were identified.

4. OTHER ACTIVITIES (OA)

4OA1 Performance Indicator (PI) Verification (71151- 3 Samples)

a. Inspection Scope The inspectors reviewed data for the Nine Mile Point EP PIs, which are: (1) Drill and Exercise Performance (DEP); (2) ERO Drill Participation; and (3) Alert and Notification System (ANS) Reliability. The last EP inspection at Nine Mile Point was in the first quarter of 2006, so the inspectors reviewed supporting documentation from drills and tests from all four quarters of 2006 and the first two quarters of 2007, to verify the accuracy of the reported PI data. The review of these performance indicators was conducted in accordance with NRC Inspection Procedure 71151. The acceptance criteria used for the review were documented in NEI 99-02, Revision 4, Regulatory Assessment Performance Indicator Guidelines.

This inspection activity represented the completion of three samples on an annual cycle.

b. Findings No findings of significance were identified.

Enclosure

40A6 Meetings, including Exit On August 16, 2007, the inspector presented the inspection results to Mr. Keith J. Polson, Nine Mile Point Vice President, and other members of the Nine Mile Point staff. No proprietary information was provided to the inspectors during this inspection.

Enclosure

A-1 ATTACHMENT SUPPLEMENTAL INFORMATION KEY POINTS OF CONTACT Licensee Personnel K. Polson, Nine Mile Point Vice President J. Jones, Nine Mile Point Emergency Preparedness Manager G. Detter, Constellation Emergency Preparedness Director LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED None LIST OF DOCUMENTS REVIEWED Section 1EP1: Exercise Evaluation Nine Mile Point Nuclear Station Emergency Plan, Revisions 53 Nine Mile Point Nuclear Station Emergency Plan Implementing Procedures Nine Mile Point Nuclear Station 2007 Evaluated Exercise Scenario Manual Nine Mile Point Nuclear Station 2006 Training Drill Reports Nine Mile Point Nuclear Station 2007 Training Drill Reports Section 1EP4: Emergency Action Level an Emergency Plan Changes Emergency Plan Maintenance Procedure, EPMP-EPP-01, Maintenance of Emergency Preparedness, Rev. 22 EPMP-EPP-05, Emergency Planning Program Self Assessment, Rev. 14 Nuclear Interface Procedure, NIP-LPP-01, Control of UFSARS, TRM, TS Bases, and NRC Approved Plans and Programs, Rev. 19 The revisions made to, and the 10 CFR 50.54(q) evaluations for, the following procedures:

Nine Mile Point Nuclear Station Emergency Plan, Revisions 51, 52, 53 Emergency Plan Implementing Procedure, EPIP-EPP-01-EAL, Emergency Action Level Matrix Unit 1, Rev. 15 EPIP-EPP-02-EAL, Emergency Action Level Matrix Unit 2, Rev. 14 EPIP-EPP-02-EAL, Emergency Action Level Matrix Unit 2, Rev. 15 Attachment

A-2 Section 4OA1: Performance Indicator Verification Drill/Exercise Performance Indicator Data, January 2006 - June 2007 ERO Drill Participation Performance Indicator Data, January 2006 - June 2007 ANS Reliability Performance Indicator Data, January 2006 - June 2007 LIST OF ACRONYMS CFR Code of Federal Regulations ERO Emergency Response Organization EOF Emergency Operations Facility EP Emergency Preparedness ERO Emergency Response Organization JIC Joint Information Center NRC Nuclear Regulatory Commission OSC Operations Support Center RSPS Risk Significant Planning Standard TSC Technical Support Center Attachment