Inquiry Rept 50-219/72-31Q:on 720925,liquid Poison Pump a Removed from Svc & Pump Breaker Racked Out to Repack Pump Seals in Excess of Tech Specs Limit.Caused by Interlock Not Receiving Power from Breaker.Interlock Will Be Modified
ML19343C318
Person / Time
Site: Oyster Creek
Issue date: 10/05/1972
From: Cantrell F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
50-219-72-31, NUDOCS 8103090343
Download: ML19343C318 (2)


Text

.

j UNITED cTATE2

g ATOMIC ENERGY COMMISSION i

q DIRECTOR ATE OF REGULATORY OPEN ATIONS

REGION 1 t

I l

,

,

,

l 970 BRO AD STREET

%,

f NEWARK, NEW JERSEY 07102 RO Inquiry Report No. 50-219/72-31Q

,

i I'

Licensee:

Jersey Central Power & Light Company l

Madison Avenue at Punch Bowl Road l

Morristown, New Jersey 07960 I

License No.:

DPR-16 j

.

}

. Oyster Creek - BWR I

Facility:

Forked River, New Jersey

!

Descriptive Title:

Exceed Technical Specifications - Both j

Liquid Poison Pumps o erable Prepared by:

M.? [

N

/

f

7. S. Cantrell, Reacy6 jtspector Dat'e i

A.

Date and Manner AEC was Informed:

l September 26, 1972, by telephone call from the licensee.

I i

B.

Description of Particular Event or Circumstance:

.

f The "A" liquid poison pump was removed from service and its breakrr j

racked out at 10:45 a.m., September 25, 1972, to repack the pump seals.

'

Technical Specification 3.2.C requires a daily check of the operable i

liquid poison system pump when the reactor is operating if one pump-i ing circuit becomes inoperable. The first surveillance check on the

{

"B" pump was conducted at 4:20 a.m., September 26. At that time, the

"B" pump would not start. A controlled shutdown was initiated immediate-l ly.

At 4:32 a.m. the breaker for the "A" pump was racked in and the

"B" pump was started and demonstrated to be operable. Power had been decreased from 655 MWe to 645 MWe, and at that time, the controlled

'

shutdown was terminated.

.

C.

Action by Licensee:

1.

Only one liquid poison pump is needed te inject the contents of the

!

!

-

.

.

!

>

i

!

-

t

.

'

pp307D3f3

-

~ _. _. _..

_ _ _ _

...

.

-

t

,

,

!

t j-2-

4

.

liquid poison system into the reactor in the required time. An-8 interlock is provided in order to prevent operating both pumps

-

at one time. This interlock operates through a contact on the power breaker of each pump, and when the breaker is.. eked out,

,

neither pump will start. In order to complete repairs to the i

"A" liquid poison pump, the starting permissive for the "B" pump

'

was restored by jumpering the interlock contact on the "A" pump power breaker during the repair period.

2.

Operating personnel have been instructed that when daily surveillance checks of safeguards equipment are required because of other in-operable equipment, the surveillance check must be performed immed-iately when the inoperable condition is determined and daily thereafter when the reactor is in operation.

l 3.

The licensee plans to check other safeguard equipment to determine if any safety functions are wired through the power breakers such that-the safety function of operable equipment would be defeated when the power breaker for the inoperable equipment is racked out.

4. -The licensee plans to modify the interlocks for the "A" and "B" liquid poiso.1 pumps to prevent defeating the starting logic

.

for the operable pump when the power breaker for either pump is f

racked out.

.

5.

The ' licensee will submit a written report to the Directorate of Licensing within 10 days as required by the Technical Specifications.

.

.

.

'

t e

t

.

p

.

.

i;-

t L

.

.

,