U.S. NUCLEAR REGULATCRY COMMISSION OFFICE OF INSPECTION AhD ENFORCEMENT Region I
,
Report No. 78-28 Docket No. 50-213
..
License No. DPR-61 Priority Category C
--
Licensee:
Connecticut Yankee Atomic Power Company P. O. Box 270 Hartford, Connecticut 06101 Facility Name:
Connecticut Yankee Inspection at:
Haddam, Connecticut In::pection conducted: November 28 through December 1,1978 CW
/ 2 ~[/- 7f Inspectors:
A. E. Finkel', Reactor Inspector ddte signed date signed date signed Approved by:
!36
/2- // L /78 S. D. Ebneter, Chief, Engineering Support date signed Section No. 2, RC & ES Branch Inspection Summary:
Inspection on Novaber 28 throuah December 1,1978 (Report No. 50-213/78-28)
Areas Insoected: Routine, unannounced inspection by a regional based inspector.
The inspection consisted of review of the plant fire program.
The inspection involved 22 inspector-hours onsite by one NRC~ regional based inspector.
Resul ts: No items of noncompliance were identified.
Region I Form 12 (Rev. April 77)
.
.
DETAILS 1.
Persons Contacted Connecticut Yankee Atomic Powa~ Company
- R. Graves, Station Superintendent
- R. Blewett, Quality Assurance Supervisor
- R. Traggio, Assistant Station Supervisor
- N. Burnett, Operations Supervisor S. Fleming, Training Supervisor D. Packer, Training Coordinator J. DeVeau, Training Coordinator R. Dilaura, Quality Assurance J. Ferguson, Engineering Supervisor V. Fleming, Office Supervisor
- denotes those present at the exit interview.
2.
Work Control Procedures
,
The inspector examined work control procedures, verifying that these procedures define requirements for operations personnel approval and control of all construction modifications and maintenance activities performed within the operating plant boundary.
Procedures examined included:
QA 1.2-3.1, revision 8, dated November 27, 1978, en titled
--
" Plant Design Change Request" (PDCR).
QA 1.2-5.1, revision 5, dated September 26, 1978, entitled
--
" Maintenance Request and Job Orders" establishes procedure to be followed, function and limitations applied to maintenance requests and job orders.
--
QA 1.2-10.1, revision 3, dated October 27, 1975, entitled
" Installation Inspection" establishes procedures for verifying equipment location, installation and assembly per drawing and instructions.
The inspector examined work control procedures for activities involving welding, open flame, or other ignition sources, verifying that these procedures require special authorization and that they take cognizance of nearby flammable materials, cable trays or critical process equipment.
Procedures examined for this determination included: Administrative Procedure (ADM) 1.1-46, revision 0, dated April 30,1976, entitled " Control of Welding, Burning, Soldering."
.
.
.
.
The inspector verified that the Administrative Procedure 1.1-46 requires a fire watch if activity identified above is to be per-formed in proximity of flammable materials.
The capability for communication with the control room is provided by emergency tele-phones located throughout the plant for such use.
No items of noncompliance were identified.
3.
Quality Assurance (QA) Surveillance a.
The inspector verified that the licensee has a procedure that requires auditing of " Instructions and Procedures" as prescribed in the Northeast Utilities Quality Assurance Manual (QAM)
Volume II. This document specifies that audits will be per-formed in prescribed areas as specified by the Quality Control Coordinator. The Connecticut Yankee Audit Schedule of June 1, 1978 differs from that approach in the QAM Volume II Manual.
The licensee is presently reviewing the audit schedule of June 1,1978 and that schedule issued in the QAM. This matter is considered to be unresolved pending NRC review of the quality assurance audit inspection schedule (213/78-28-01).
b.
The inspector reviewed the job order list in the operations control log for the year 1978. The inspector selected ten job orders verifying that they had been authorized and approved by designated operating personnel and that surveillance had been performed in conformance with established controls, c.
No penetration seals were changed during 1978 except the modi-fications made in compliance with IE Bulletin 77-05, entitled
" Electrical Connector Assemblies." Details of this inspection are documented in inspection report 50-336/78-02 dated January 3-6, 1978.
No items of noncompliance were identified.
4.
Design Change Control a.
The inspector reviewed the Quality Control Assurance Procedure No. 1.2-3.1, revision 8, dated November 27, 1978, entitled
" Plant Design Change Request" (PDCR) to determine whether administrative controls have been imposed that require review of all replacement cable penetration seals to assure flammable materials are not used.
Altho;gh this procedure does not specifically address cable penetration seals, it does require review of the suitability of materials for intended us.
-
b.
The inspector audited ten design changes to vital systems for the year 1978 to determine whether the licensee had implemented administrative controls that require review of materials to assure flammable. materials are not used.
No items of noncompliance were identified.
5.
Emergency Procedures 6.
The inspector verified that the licensee has established pro-cedures which deal with fires in vital areas such as the control room, switchgear room, and cable vault.
Documents examined included:
--
Administrative Procedure No. ADM 1.1-35, entitled " Fire Hazards and Housekeeping Committee."
Connecticut Yankee Station Policy (CYSP)-18,. dated
--
April 6,1978, entitled " Fire Protection and Prevention Program."
b.
The inspector examined plant emergency procedures for shutdown and cooldown methods of accomplishing an orderly plant shutdown in the event of loss of normal and preferred alternative coolant system. The inspector determined that ths licensee had alternate procedures that deal specifically with the loss of normal coolant and the preferred ali.ernate decay-heat-cooling system.
The inspector observed that the operation of these systems is treated as an integral part of other emergency conditions such as " Loss of A.C." or " Loss of Control Air Supply."
Procedures reviewed included:
E0P 3.1-1, revision 0, dated February 1,1975 entitled
--
" Emergency Shutdown.
E0P 3.1-4,. revision 2, dated August 31, 1976, entitled
--
" Loss of Coolant."
E0P 3.1-9, revision 3, dated December 1,1976, entitled
--
" Loss of A.C."
E0P 3.1-26, revision 0, dated February 1,1975, entitled
--
" Loss of Coolant Flow."
--
E0P 3.1-27, revision 0, dated February 1,1975, entitled
" Loss of Feedwater (FW) Flow, Feedwater (FW) Regulator Valve Failure,"
.
.
.
E0P 3.1-29, revision 0, dated February 1,1975, entitled
--
" Loss of Service Water Emergency Procedure."
No items of noncompliance were identified.
6.
Fire Training and Drills The inspector audited Administrative Procedure 1.1-18 which delineates the Connecticut Yankee Training Procedure TR-1.6-1.18 dated April 1, 1978.
Prc cedure TR-1.6-1.18 defines the following fire requirements for training:
Fire Brigade Members Training Requirements; and,
--
Fire Brigade Training Annually.
--
The inspector verified that fire training and fire drills were conducted in conformance with applicable procedures.
The inspector reviewed the following fire program procedures and records for 1978.
Fire Brigade Training Program training schedule for 1978
--
Willimater Connecticut Training Site, entitled ' Hands on Exercise."
Fire Brigade Program Outline Course (C0-IHS-VI), revision 1,
--
dated March 30, 1978, entitled " Industrial Health and Safety VI-Fire Brigade."
Fire Training for general employee (IHS-VIII), dated March 7,
--
1978, entitled " Industrial Health and Safety VIII."
Fire Brigade Training Records (C0-IHS-VI) CY-T-10.7 and Compre-
--
hensive Training Attendance Log CY-T-10.5 for 1978 and 1977.
Fire Drill Records for June 8,1978, August 22, 1978 and Octo-
--
ber P.5, 1978.
No items of noncompliance were identified.
7.
Facility Inspection a.
The inspector reviewed the most recent fire inspection report available, prepared by the licensee's insurer, the American Nuclear Insurers (ANI) for Property File No. N-110 dated July 26, 1978l
.
.
.
..
b.
On November 30, 1978, the inspector toured the facility with a licensee representative to observe housekeeping activities and verification of maintenance activity per-taining to the inspection and operability of fire fighting equipment in the following areas: Control Room, Cable Spreading Room, Switchgear Room, Diesel Generating Room A and B, Lube Oil Storage Area, Battery Room A and B, and the Turbine Area.
The inspector examined maintenance and surveillance records for portable fire extinguishers, smoke detectors, and emer-gency lighting verifying that maintenance checks were mide in accordance with established procedures.
Documents examined included:
--
Preventative Maintenance Program for Smoke Detectors per surveillance procedure 5.5-12/5.5-13.
Containment Emergency Lighting PM-01-004-M-1 and Battery
--
Operated Emergency Lighting PM-40-028-M-2.
--
Monthly Fire Program Check PM 9.19.
No items of noncompliance were identified.
8.
Unresolved Items Unresolved items are matters about which more information is required to ascertain whether they are acceptable items, items of noncompli-ance, or deviations.
Unresolved items disclosed during th: 'nspection are discussed in paragraph 3a.
9.
Exit Interview The inspector met with the licensee representatives (denoted in paragraph 1) at the conclusion of the inspection.
The inspector summarized the purpose and scope of the findings.
The licensee acknowledged the inspector's findings.