IE Insp Rept 50-213/78-30 on 781211-14.No Noncompliance Noted.Major Areas Inspected:Implementation of Accepted Security Plan & Applicable Sections of 10CFR73.55 Relative to Security Organization
ML19284A638
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 01/30/1979
From: Devlin J, Madden W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19284A636 List:
References
50-213-78-30, NUDOCS 7903150136
Download: ML19284A638 (1)


Text

.

'.'

U.S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT Region I Report No. 50-213/78-30 Docket No. 50-213 Safeguards Group

License No.

OPR-61 Priority Category C

--

Licensee:

Connecticut Yankee Atomic Power Company P. O. Box 270 Hartford, Connecticut 06101 Facility Name:

Haddam Neck Plant Inspection at:

Haddam Neck, Connecticut Inspection conducted: December 11-14, 1978 Inspectors: MC'

//#D /b 9 W.M[d' den,PhysicalSecurityInspector date signdd date signed

.

date signed

.

,

,

Approved by:

//

/>4

/ J I)

a s i g'ned LI W. Devlin, Chief, Security and Investigation Section, Safeguards Branch Inspection Summary:

Inspection on December 11-14, 1978 (Report No. 50-213/78-30)

Areas Inspected: Routine, unannounced physical security inspection by one regional based inspector.

The inspection included:

implementation of accepted Security Plan and applicable sections of 10 CFR 73.55 relative to:

Security Plan, Security Organization, Physical Barriers, Access Controls, Detection Aids, Communications, Testing and Maintenance and Response Requirements.

IE Bulletin 78-17, " Inadequate Guard Training" was also reviewed. This inspection was initiated during regular hours and involved 30 inspector-hours onsite by one regional based inspector.

Results:

No items of nonconpliance were identified.