IR 05000029/1976004

From kanterella
Jump to navigation Jump to search
IE Insp Repts 50-029/76-04,50-271/76-01 & 50-309/76-02 on 760120.No Noncompliance Noted.Major Areas Inspected:Routine Corporate Mgt Meeting W/Utils to Familiarize Licensee W/Nrc Organization & IE Insp Program
ML19351D732
Person / Time
Site: Vermont Yankee, Yankee Rowe, Maine Yankee
Issue date: 02/10/1976
From: Davis A, Streeter J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19351D731 List:
References
50-029-76-04, 50-271-76-01, 50-271-76-1, 50-29-76-4, 50-309-76-02, NUDOCS 8011170668
Download: ML19351D732 (4)


Text

%)

,

,

.

"'I Form 12

s.an 75) (Rev)

.

U. S. NUCLEAR REGUUsTORY CC !ISSION OFFICE OF I:iSPECTIO:: 1.::D E::FORCCiE:.T MEETING SGMARY 50-309/76-02 REGIC:! I 50-309 50-271/76-01 50-271 IE Inspection Report Nos; 10-24 N "

-

Docket Nos' M.

DPR2f8 Licensce: Maine Yankee Atomic Power Cocpany License Nos. DPR-3 Vermont Yankee Nuclear Power Corporation Priority:

_

Yankee Atomic Electric Company Category:

C Safeguards

'Jiscasse t Maine Group:

-

Locations: Vernon, Ve,rmont Re =,.,2c:2ceus m :

PWR, 2440 MWe(CE)

( se of Licencee:

PWR. 1593 MWe(CE)

PWR, 600 MWt ('4)

Type of luspe'ction:

Routine announced corporate manace=ent meeting Dates of Inspec tion: January 20, 1976 January 5-7, 197o N vember 24-26, 1975 Dates of Previous Inspection:

,,anuary A o,

Ay,o Reporting Inspector: QTDA

-

[9/76 T

DATE J. F. Streeter, Reactor Inspector Acco=panying Inspectors:

9,7 nn T inee,c.nre e-a -2-:7.-e,e

personnel participating in this =eeting DATE are indicated in the attached Su ary of Findings DATE DATE Other Accompanying Personnel:

None DATE tiewed By:

J M

  1. /2

+

- '

A.

B. Davis, Section Chief, Reactor DATE Projects Section No. 1

.

8011170

o I

.

p

.

SUMMARY OF FINDINGS Enforcement Action None Licensee Action en Previously Identified Enforcement Items Not Applicable Design Chanres Not Inspected Unusual Occurrences None Identified Other Significant Findings

,

,

A.,

Current Findings A routine corporate =anagement meeting with representatives of Maine Yankee Atomic Power Co pany, Ver=ont Yankee Nuclear Power Corporation, and Yankee Atomic Electric Cocpany was held to familiarize the licensees with the Nuclear Regulatory Co= mission organization, the NRC Office of Inspection and Enforcecent Uniform Inspection Program, and to review the results of the II inspection program and associated responses of the licensees ' since the last =anagement =eetings.

~

3.

Licensee Representatives Present Mr. H. Autio, Superintendent, Yankee Rowe Mr. D. Edwards, Assistant to Vice President Mr. J. French, Manager of Operations Mr. L. Heider, Assistant Vice President-Operations Mr. W. Johnson, Vice President Mr. D. Moody, Superintendent, Maine Yankee Mr. B. Riley, Superintendent, Vermont Yankee Mr. D. Vandenburgh, Vice President Mr. R. *a'eeks, Assistant to the President, Ver:ent Yankee Nuclear Power Corporation

.

.

.

--.

e

.

,

~

.

.

-2-Office of Inspection and Enforcement, Region I, Peeresentatives Present Mr. K. Abraham, Public Affairs Officer Mr. W. Baunack, Reactor Inspector Mr. E. Brunner, Chief, R0&NS Branch Mr. B. Davis, Section Leader Mr. J. Devlin, Section Leader (Part Time)

Mr. D. Haverhamp, Reactor Inspector Mr. R. Haynes, Section Leader (Part Time)

Mr. P. Knapp, Section Leader (Part Time)

Mr. E. McCabe, Section Leader (Part Ti=e)

Mr. J. O'Reilly, Director (Part Time)

Mr. P. Stohr, Section Leader (Part Time)

tit. J. Streeter, Reactor Inspection

.

.

.

-p e

=,

e e

=

__

.

.

-

I

,

,.

,

,

..

.

.

DETAILS l

The following areas were addressed during the course of the meeting:

,

)

1.

Opening remarks and overview of meeting.

J. O'Reilly 2. -

Description of NRC organization and introduction E. Brunner of Region I Branch Chiefs.

3.

Description of Office of Inspection and Enforcement B. Davis

inspection program.

a.

Uniformity b.

Scope

,

c.

Inspection Techniques

!

d.

Enforce =ent Action e.

Reporting 4.

Roles of project and specialist inspectors, overview.

J. Streeter t

5.

Role of Engineering Support Section.

R. Haynes 6.

Role.of Nuclear Support Section.

E. McCabe

.

7.

Role o'. Enviror= ental & Special Projects Section.

P. Stohr 8.

Rolo of Radiation Support Section.

P. Knapp y

i 9.

dole of Safeguards Branch.

,

J. Devlin 10.

Su= mary of previous IE enforcement actions and J. Streeter

other safety related items.

11. OIE observations of general conduct of licensee's J.-Streeter operations.

12.

Changes in general environs of facilities.

3. Davis 13.

Public Affairs.

K. Abraham 14.

Licensee items and concerns Licensee 15.

Closing remarks.

J. O'Reilly

.

...

__.

.

_,.,.

-

,-

_