Text
.
L. 2:as.._:il.ra u m k t-.u x.
.M, " -l ' m y
. -i a
-
,.
- ..
- ----..,
g,. s..
.
. --
...
-
^
.
=L
.
'
-
-
.
- --
.
.
'
l
-
t
.
.
.
i
-
L..,
U. S. ATO.'1IC ENERGY CO.T1ISSION DIRECTORATE OF RECUL\\ TORY OPERATIONS
REGION I
l RO Inspection Report No':
05000029/74-07 Docket No: 50-29
"
Licensec:
Yankee Atomic Electric Co.
License No:DPR-3
,
20 Turnpike Road
Priority:
Westboro, Massachusetts 01581 dategory:
c I
Location:
Rowe, Massachusetts
.
'
Ty e of Licensee:
PWR 175 W (c)
-
. Type of Inspection: Special announced Dates of Inspection: July 11-12, 1974
.
1tes of Pre'vious Inspection:
W s h M -< f.s)
Reporting !nspector.:
W. F. Sanders, Reactor Inspe or
/ -/b 7 /
Date l
,
Accompanying Inspectors:
'
Date
.
Date
~.
Date
.
.
-
Date
,
.
Other Accompanying Personnel:
Date
.
-
y b.Afv' I N m
'
f. /l't ? pl Reviewed By:
J. Tillou. Senior Inspector"
- ,*
,
Date
.
A hiau@liiis_ alk
.8e,,o8o 7 7 o f
-
.
I
,/
-
-
,
.
,
.
.
.
-
.
,
.
.
/
I SUMMARY OF FINDINGS
'
' Enforcement Action
.
None Licensee Action on Previously Identified Enforcement Items
"
Not Inspected.
l Unusual Occurrences
'
I
-
-
.
-
None Identified.
.
Other Significant Findings
,
A.
Current 1..The new incore instrumentation system consisting of a support
- structure, twenty-six (26) thermocouple positions and twenty-two (22) flux path positions,has been installed in the Reactor Vessel.
.
2.
The old incore instrumentation system has been cut in pieces and loaded in two transfer casks for shipmen.t to a disposal area.
B.
Status of Previously Reported Unresolved Items Not Inspected.
Management Interview The inspector described the scope of inspection performed for the following items:
-
,
A.
Material Review. (Details, Para. 4)
B.
Vendor Surveillance. (Detcils, Para. 5)
C.
Review of Related Documentation. (Details, Para. 6)
D.
Disposal of Old System. (Details, Para. 7)
E.
Observations. (Details, Para. 8)
>
.
- *-
~ ~ *
No deficiencies were identified.
.
.
a
i e
'
'
'
,/
'
'
,
.
.
~
q
.
.
-
.
I
.
/
.
'
DETAILS
' l.
Persons Contacted Yankee Atomic Electric Comoany H. Autio - Site Manager
_. - -. - -
.
W. Jones - Assistant Site Manager
,
J. Hoffman - Project Engineer F. Singleton - Quality Control & Audit Engineer Westinghouse Electric Corporation Nuclear Services G. Calhoun - Project Engineer
F. Franks - Construction Engineer F. Finloyson - Field Engineer
.
2.
General
.
This trip was made to inspect the new incore instrumentation system and the related documentation for the material quality, fabrication, installation, testing and disposal of the old system.
j 3.
Status At the time of this inspection the new incore system consisting of twenty-six (26) thermocouples and twenty-two (22) flux paths, had been installed and the closure head and upper structure were in place. The work being performed consisted of connecting the guide tubes to the drive mechanisms. No deficiencies were noted.
4.
Material Records l
Randomly selected material certificacions were examined for compliance
to the applicable requirements and for tracebility to the actual p a'r ts. No.deficiences were identified.
.
5.
Vendor Surveillance and Audits The inspector reviewed the extent of involvenait in the actual fabrica' tion of the incere system by the licensee. The inspector noted that audits, inspection trips and extended surveillance trips
-
were made.
In addition, the Westinghouse Construction Engineer was in residence at the fabricator for a considerable period of time.
.
.,
-
-.
,
.
O v
i
.
, %.
..
.
~
~
.
'
-3-
-
.
6.
Documentation Reviev
.The inspector reviewed the following:
f Westing, house Quality Release 19457 a.
i f
b.
Installation Procedures
.
c.
Certification for the Qualification of Welders t
-
t d.
Certification for the Qualification of NDE Personnel e.
Equipment Calibration
,
No deficiencies were identified.
-
7.
Disposal of Old System The disposal procedure OPT-JWF 365 was reviewed and the accountability log identified each piece to cask assignment. All of the parts were loaded in two (2) casks, and were being prepared for shipment to a disposal area. No deficiencies were identified.
8.
dbservations The inspector reviewed a significant amount of 8 x 11 photographs taken throughout' f abrication. The photographs had excellent defini-tion from which the viewer could determine welding bead fusion' lines surface defects.
In. addition, the securing of bolted fasteners by welding could be observed.
A tour of the containment was made to observe the work being per-formed on the connecting of the guide tubes, installation of valves
,
and installation of the neutron sensor drive mechanism.
In addition an observation was mad'e of the program control console for flux path mapping. No deficiencies were identified.
i
.
.
.
p
8 e
- .
i
.
.
.
--._.._...--
- - -
--
1