Category:Letter type:GO
MONTHYEARGO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-105, Licensing Basis Document Update and Biennial Commitment Change Report2023-12-12012 December 2023 Licensing Basis Document Update and Biennial Commitment Change Report GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-23-126, Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-012023-11-28028 November 2023 Docket No. 50-397 Voluntary Response to Regulatory Issue Summary 2023-01 GO2-23-121, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-27027 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation GO2-23-097, In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26)2023-09-0606 September 2023 In-Service Inspection Summary Report for the Twenty-Sixth Refueling Outage (R26) GO2-23-100, Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication2023-08-31031 August 2023 Technical Specification Section 5.6.4 Post Accident Monitoring Instrumentation 14-Day Report for Inoperable Suppression Pool Level Indication GO2-23-056, Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2023-08-29029 August 2023 Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-23-093, Supplement to Reply to a Notice of Violation: EA-21-1702023-07-27027 July 2023 Supplement to Reply to a Notice of Violation: EA-21-170 GO2-23-068, Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation2023-07-19019 July 2023 Notification of Completion of Commitments Required Prior to Entry Into the Period of Extended Operation GO2-23-090, Reply to a Notice of Violation2023-07-12012 July 2023 Reply to a Notice of Violation GO2-23-073, Notification of NPDES Permit Issuance2023-06-26026 June 2023 Notification of NPDES Permit Issuance GO2-23-072, Cycle 27 Core Operating Limits Report2023-06-0505 June 2023 Cycle 27 Core Operating Limits Report GO2-23-055, Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report2023-05-15015 May 2023 Independent Spent Fuel Storage Installation, 2022 Annual Radiological Environmental Operating Report GO2-23-006, License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications2023-05-0101 May 2023 License Amendment Request to Clean-Up Operating License and Appendix a Technical Specifications GO2-23-053, 2022 Annual Environmental Operating Report2023-04-26026 April 2023 2022 Annual Environmental Operating Report GO2-23-057, 2022 Annual Radioactive Effluent Release Report2023-04-25025 April 2023 2022 Annual Radioactive Effluent Release Report GO2-23-012, Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2023-03-27027 March 2023 Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-041, Generation Station - Level of Financial Protection - Annual Reporting Requirement2023-03-15015 March 2023 Generation Station - Level of Financial Protection - Annual Reporting Requirement GO2-23-038, Plant Decommissioning Fund Status Report2023-03-15015 March 2023 Plant Decommissioning Fund Status Report GO2-23-034, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462023-03-13013 March 2023 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-23-035, Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-03-0909 March 2023 Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling GO2-23-019, Emergency Plan - Summary of Changes and Analysis for Revision 68 of the EP-012023-02-0808 February 2023 Emergency Plan - Summary of Changes and Analysis for Revision 68 of the EP-01 GO2-22-131, Guarantee of Payment of Deferred Premium2022-12-19019 December 2022 Guarantee of Payment of Deferred Premium GO2-22-122, Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-11-28028 November 2022 Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GO2-22-076, Status of License Renewal Commitments2022-10-31031 October 2022 Status of License Renewal Commitments GO2-22-110, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactor2022-10-17017 October 2022 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactor GO2-22-096, Supplement to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-10-0404 October 2022 Supplement to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GO2-22-085, Docket No. 50-397, Evacuation Time Estimate Analysis2022-08-30030 August 2022 Docket No. 50-397, Evacuation Time Estimate Analysis GO2-22-075, Response to Request for Additional Information Related to Revised Pressure-Temperature Limit Curves2022-07-11011 July 2022 Response to Request for Additional Information Related to Revised Pressure-Temperature Limit Curves GO2-22-072, Summary of Changes and Analysis for Revision 57 of PPM 13.14.4 - Emergency Equipment Maintenance and Testing2022-07-11011 July 2022 Summary of Changes and Analysis for Revision 57 of PPM 13.14.4 - Emergency Equipment Maintenance and Testing GO2-22-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process2022-05-25025 May 2022 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process GO2-22-062, Registration of Spent Fuel Cask Use2022-05-19019 May 2022 Registration of Spent Fuel Cask Use GO2-22-049, Supplement to Licensing Amendment Request to Adopt 10CFR50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Rectors2022-05-10010 May 2022 Supplement to Licensing Amendment Request to Adopt 10CFR50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Rectors GO2-22-054, Independent Spent Fuel Storage Installation, 2021 Annual Radiological Environmental Operating Report2022-05-0909 May 2022 Independent Spent Fuel Storage Installation, 2021 Annual Radiological Environmental Operating Report GO2-22-056, Registration of Spent Fuel Cask Use2022-04-21021 April 2022 Registration of Spent Fuel Cask Use GO2-22-055, 2021 Annual Environmental Operating Report2022-04-20020 April 2022 2021 Annual Environmental Operating Report GO2-22-048, 2021 Annual Radioactive Effluent Release Report2022-04-15015 April 2022 2021 Annual Radioactive Effluent Release Report GO2-22-045, Registration of Spent Fuel Cask Use2022-04-0606 April 2022 Registration of Spent Fuel Cask Use GO2-22-044, Level of Financial Protection - Annual Reporting Requirement2022-03-21021 March 2022 Level of Financial Protection - Annual Reporting Requirement GO2-22-038, Docket No. 50-397, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462022-03-0909 March 2022 Docket No. 50-397, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-22-031, Response to Audit Plan and Online Reference Portal Request2022-02-15015 February 2022 Response to Audit Plan and Online Reference Portal Request GO2-22-011, Docket No. 72-35; Independent Spent Fuel Storage Installation, 2021 Annual Effluent Release Report2022-02-0808 February 2022 Docket No. 72-35; Independent Spent Fuel Storage Installation, 2021 Annual Effluent Release Report GO2-22-001, License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-02-0303 February 2022 License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GO2-22-012, Independent Spent Fuel Storage Installation - Biennial 50.59/72.48 Report2022-01-24024 January 2022 Independent Spent Fuel Storage Installation - Biennial 50.59/72.48 Report 2024-01-08
[Table view] |
Text
ENWERGY NORTH WEST P0. Box 968
- Richland, Washington 99352-0968 July 22, 2004 G02-04-131 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555
Subject:
COLUMBIA GENERATING STATION, DOCKET NO. 50-397; ENERGY NORTHWEST SUPPLEMENTAL RESPONSES TO REQUESTS FOR ADDITIONAL INFORMATION REGARDING COLUMBIA SECURITY PLAN
References:
(1) Letter, M.H. Chernoff (NRC) to JV Parrish (Energy Northwest),
"Request for Additional Information Re; Security Plan Sections 10-19 (TAC No. MC2905)," dated June 17, 2004 (2) Letter, M.H. Chernoff (NRC) to JV Parrish (Energy Northwest),
"Request for Additional information Re; Security Plan Sections 1-9 (TAC No. MC2905)," dated June 22, 2004 (3) Letter, DK Atkinson (Energy Northwest) to NRC (GO2-04-118),
"Energy Northwest Responses to Requests for Additional Information Regarding Columbia Security Plan," dated July 8, 2004
Dear Sir or Madam:
In reference 3 Energy Northwest submitted a partial response to references 1 and 2.
The responses not provided pertained to generic changes to the NRC endorsed template for licensee's changes to their Physical Security Plans. After further meetings between nuclear power industry representatives (NEI) and NRC, a number of these generic changes have been reconciled and all but two of Energy Northwest's remaining responses to references 1 and 2 are provided herein. The remaining two responses will be provided when the specific associated language has been resolved.
ENERGY NORTHWEST SUPPLEMENTAL RESPONSES TO REQUESTS FOR ADDITIONAL INFORMATION REGARDING COLUMBIA SECURITY PLAN Page 2 of 2 If you have any questions or require additional information regarding this matter, please contact Mr. DW Coleman, Regulatory Programs Manager, at (509) 377-4342 or Mr.
RJ Givin at (509) 377-2167.
Respectfully, DK Atkinson Vice President, Technical Services Mail Drop PE08
Attachment:
Supplemental Responses to Requests for Additional Information (RAI)
Regarding Columbia Security Plan sections 1 - 19 cc: BS Mallet - NRC - RIV WA Macon - NRC - NRR NRC Sr. Resident Inspector - 988C RN Sherman - BPA/1399 TC Poindexter - Winston & Strawn MH Chernoff- NRC
-I-Supplemental Responses to Requests for Additional Information (RAI) Regarding Columbia Security Plan sections 1 - 19 Attachment Page 1 of 2
- 1. Section 3, Performance Evaluation We consider this RAI a generic change to the NRC endorsed template. We will make the appropriate changes to our physical security plan once a final determination is rendered.
- 2. Section 8.2, Control and Accountability of Keys, Locks, and Combinations Columbia's Physical Security Plan will be revised consistent with RAI 13 of the "NEI Security Working Group Disposition Of Physical Security Plan Generic RAI's" that was prepared in response to the NRC's letter to NEI dated July 8, 2004.
- 3. Section 9.4.4, PA Personnel Searches Columbia's Physical Security Plan will be revised to adopt the language specified in RAI 18 of reference 2 with the additional clarification that armed security officers will perform escort, observation, and control duties as the security force manning allows without degrading from the protective strategy commitments.
- 4. Section 9.6, VA Access Controls Columbia's Physical Security Plan will be revised consistent with RAI 21 contained in Enclosure 2 of the "NEI Security Working Group Disposition Of Physical Security Plan Generic RAI's" that was prepared in response to
-_ ___the_ NRC's letter to NEIdatedJuly_.8,2004. _ __ ___
- 5. Section 14.1, Refueling Outages and Major Maintenance Activities We consider this RAI a generic change to the NRC endorsed template. We will make the appropriate changes to our physical security plan once a final determination is rendered.
Supplemental Responses to Requests for Additional Information (RAI) Regarding Columbia Security Plan sections 1 - 19 Attachment Page 2 of 2
- 6. Section 14.2, Construction and Maintenance Columbia's Physical Security Plan will be revised consistent with RAI 28 of the "NEI Security Working Group Disposition Of Physical Security Plan Generic RAI's" that was prepared in response to the NRC's letter to NEI dated July 8, 2004.
- 7. Glossary of Terms and Acronyms Columbia's Physical Security Plan will be revised consistent with RAI 31 of the "NEI Security Working Group Disposition Of Physical Security Plan Generic RAI's" that was prepared in response to the NRC's letter to NEI dated July 8, 2004.