ENS 50337
ENS Event | |
---|---|
02:42 Aug 2, 2014 | |
Title | High Pressure Core Spray Declared Inoperable Due to Test Return Valve Leakage |
Event Description | River Bend Station personnel declared the High Pressure Core Spray system inoperable at 2142 [CDT] on 8/1/2014.
The High Pressure Core Spray (HPCS) system at River Bend Station includes a test return line to the Condensate Storage Tank (CST). The test return line is isolated by two motor operated valves (MOVs) with both having a safety function to close on an ECCS [Emergency Core Cooling System] initiation signal to ensure that injection flow is directed to the reactor vessel. While the HPCS pump is normally aligned to the CST, the credited source of water for the pump is the suppression pool. Accordingly, the pump suction is realigned to the suppression pool on low level in the CST or when suppression pool level rises to a certain point. Station personnel identified leakage past the test return valves to the CST. In evaluating this condition, engineering personnel noted that the observed leakage past the two MOVs might be sufficient to deplete suppression pool inventory such that it would not be capable of performing its specified function for the duration of the 30 day mission time. The issue of concern is that once HPCS is aligned to the suppression pool post-LOCA, pool inventory would be lost to the CST through the leaking test return valves. Based on that concern, the HPCS pump suction valve from the suppression pool was disabled in the closed position to preserve pool inventory. This action caused the HPCS system to be declared inoperable at 2142 [CDT]. This action results in a 14 day shutdown LCO and is reportable to the NRC in accordance with 10 CFR 50.72(b)(3)(v)(D). The HPCS pump remains available with its suction aligned to the CST. Assuming normal makeup water supplies are available, the HPCS system can be realigned to the suppression pool if necessary. This condition continues to be evaluated and rework options are being developed. The NRC Senior Resident Inspector has been notified. |
Where | |
---|---|
River Bend Louisiana (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
Time - Person (Reporting Time:+0.95 h0.0396 days <br />0.00565 weeks <br />0.0013 months <br />) | |
Opened: | Daniel Pipkin 03:39 Aug 2, 2014 |
NRC Officer: | Daniel Mills |
Last Updated: | Aug 2, 2014 |
50337 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 50337\u003C/a\u003E - \u003Ca href=\"/River_Bend\" title=\"River Bend\"\u003ERiver Bend\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EHigh Pressure Core Spray Declared Inoperable Due to Test Return Valve Leakage\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 50337 - River Bend\n","link":"","lat":30.759530555555557,"lon":-91.3300888888889,"icon":"/w/images/7/79/Entergy_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |