02:08 Nov 24, 2012 | |
Title | Inadvertent Loss of Instrument Air |
Event Description | On 11/23/2012 at approximately 1956 CST, it was reported that the Control Room (VC) B Chiller breaker was cycling open and closed. In order to stop the cycling, Control Building Unit Sub B was manually tripped causing the following isolations/actuations: loss of power to instrument air (IA) system containment isolation valves causing the Division 2 valves to isolate; loss of power to the low pressure switch that resulted in an automatic start of Division 2 Shutdown Service Water (SX) system; and loss of power to fuel building (VF) system ventilation Division 2 dampers resulting in a trip of the VF system. High Pressure Core Spray (HPCS) became inoperable based on inoperability of the room cooler for the associated Division 4 inverter and battery charger. Operations entered the Loss of AC Power and Automatic Isolation off-normal procedures. Following the loss of power to the VF system ventilation, at 2008, secondary containment differential pressure became positive. At 2009, power was restored to Control Building Unit Sub B and HPCS was restored to operable. At 2011, the standby gas treatment system (VG) was started and at 2013, secondary containment differential pressure was restored. Following re-energization of Unit Sub B, the IA containment isolation valves were re-opened, VG was secured, VF restarted and the Division 2 SX pump was secured.
The loss of secondary containment differential pressure is reportable under 10 CFR 50.72(b)(3)(v)(C) as an event or condition that could have prevented fulfillment of a safety function needed to control the release of radioactive material An unplanned inoperability of HPCS reportable under 10 CFR 50.72(b)(3)(v)(D) as HPCS is a single train safety system The cause of the breaker cycling is unknown at this time. The NRC Resident has been informed. |
Where | |
---|---|
Clinton Illinois (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material 10 CFR 50.72(b)(3)(v)(D), Loss of Safety Function - Mitigate the Consequences of an Accident | |
Time - Person (Reporting Time:+1.17 h0.0488 days <br />0.00696 weeks <br />0.0016 months <br />) | |
Opened: | David Wells 03:18 Nov 24, 2012 |
NRC Officer: | Charles Teal |
Last Updated: | Nov 24, 2012 |
48533 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 48533\u003C/a\u003E - \u003Ca href=\"/Clinton\" title=\"Clinton\"\u003EClinton\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EInadvertent Loss of Instrument Air\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 48533 - Clinton\n","link":"","lat":40.17286111111111,"lon":-88.8332,"icon":"/w/images/b/be/Constellation_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (97 %) |
After | Power Operation (97 %) |