ENS 40608
Jump to navigation
Jump to search
| Where | |
|---|---|
| Crystal River Florida (NRC Region 2) | |
| Reporting | |
| 10 CFR 50.72(b)(2)(iv)(B), RPS Actuation 10 CFR 50.72(b)(3)(iv)(A), System Actuation | |
| LER: | 05000302/LER-2004-001 Regarding Actuation of the Reactor Protection System and Emergency Feedwater System Caused by a Failed Circuit Board within the Main Feedwater Integrated Control System on March 24 2004 |
| Time - Person (Reporting Time:+-3.87 h-0.161 days <br />-0.023 weeks <br />-0.0053 months <br />) | |
| Opened: | Richard Sweeney 04:39 Mar 24, 2004 |
| NRC Officer: | Bill Gott |
| Last Updated: | Mar 24, 2004 |
| 40608 - NRC Website
| |