Text

7g-L: p;4 / (I,, 1 GPU Nuclear, Inc.

Three Mile Island Nuclear Station NUCLEAR Route 441 South Post Office Box 480 Middletown, PA 17057-0480 Tel 717-948-8461 May 28, 2002 E910-02-026 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Saxton Nuclear Experimental Corporation (SNEC)

Operating License No. DPR-4 Docket Nos. 50-146 Submittal of Information to NRC in April 8, 2002 and May 22, 2002 Meetings Gentlemen, On May 22, 2002 a meeting between NRC and GPU Nuclear, Inc. was held in Rockville, Md. The intent of the meeting was to discuss SNEC's License Termination Plan (LTP) and characterization issues addressed in NRC's requests for additional information. The purpose of this letter is to summarize information that was exchanged at this meeting. In a previous letter (Reference GPU to NRC Letter E910-02-025, dated May 22, 2002) to the NRC, GPU Nuclear Inc. described information provided in the April 8, 2002 and May 8, 2002 meetings. An additional piece of information that was provided in the April 8, 2002 meeting was inadvertently omitted in our E910-02-025 letter. This information is being provided in this letter.

Reference NRC Letter dated March 28, 2002 -

Subject:

"Saxton Nuclear Experimental Facility Discussion Topics for April 8, 2002 Meeting (TAC No. MA8076)".

During the April 8, 2002 meeting, GPU Nuclear, Inc. provided the following information in addition to that described in GPU Nuclear letter E910-02-025 dated May 22, 2002:

1. SNEC Calculation 6900-02-008, "SNEC Facility DCGL Values for Volumetric Contamination,"

February 7, 2002.

Reference NRC Letter dated May 13, 2002 -

Subject:

"Saxton Nuclear Experimental Facility - Discussion Topics for May 22, 2002 Meeting (TAC No. MA8076)".

During the May 22, 2002 meeting GPU Nuclear, Inc. provided the following:

1. Summary table of transuranic (TRU) and hard to detect (HTD) radionuclides from SNEC characterization work.
2. Four (4) prints describing the following:

- SNEC Grout, Sheeting, and Well Location Plan

- SNEC Well Location Plan

- SNEC Grout Curtain Location Plan

- SNEC Anchor Bolt Hole and Well Locations ge/s ,'e

U.S. Nuclear Regulatory Commission E91 0-02-026 May 28, 2002 Page 2

3. Presentation handouts addressing the above referenced NRC letter.

Please contact Mr. James Byrne at (717) 948-8461 with any questions.