DCL-23-070, Withdrawal of Request Regarding Senior Reactor Operator License Application
| ML23228A140 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 08/16/2023 |
| From: | Petersen D Pacific Gas & Electric Co |
| To: | Andrea Veil Office of Nuclear Reactor Regulation, Document Control Desk |
| References | |
| DCL-23-070 | |
| Download: ML23228A140 (1) | |
Text
Pacific Gas and Electric Company"'
PG&E Letter DCL-23-070 Andrea Veil, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Dennis B. Petersen Station Director Diablo Canyon Power Plant Mail code 104/51502 P.O. Box 56 Avila Beach, CA 93424 805.545.4022 Dennis.Petersen@pge.com 10 CFR 55.11 10 CFR 55.47(a)(1)
Withdrawal of Request Regarding Senior Reactor Operator License Application
References:
- 1. PG&E Letter DCL-23-008, "Request Regarding Senior Reactor Operator License Application," dated February 22, 2023
- 2. PG&E Letter DCL-23-035, "Response to Request for Additional Information on 'Request Regarding Senior Reactor Operator License Application'," dated April 24, 2023
Dear Ms. Veil:
In Reference 1, as supplemented by Reference 2, Pacific Gas and Electric Company (PG&E) requested an exemption in accordance with 10 CFR 55.11 from the two-year eligibility requirement of 10 CFR 55.47(a)(1 ). Upon further consideration and as discussed with the NRC staff, PG&E hereby withdraws the exemption request.
PG&E makes no new or revised regulatory commitments (as defined by NEI 99-04) in this letter.
If the NRC requires additional information regarding this matter, please contact James Morris at 805-545-4609.
Sincerely,
~/4 Dennis B. Petersen A
member of t he STARS Alliance Callaway
- Di abl o Canyon
- Pal o Verde
- Wolf Creek Date
Ms. Andrea Veil PG&E Letter DCL-23-070 Page 2 A member of the STARS Alliance Callaway
- Diablo Canyon
- Palo Verde
- Wolf Creek mjrm/4557 cc:
Mahdi O. Hayes, NRC Senior Resident Inspector Samson S. Lee, NRC Senior Project Manager John D. Monninger, NRC Region IV Administrator Diablo Distribution