DCL-15-060, Updated Final Safety Analysis Report, Revision 22
ML15138A105 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 05/06/2015 |
From: | Welsch J Pacific Gas & Electric Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
DCL-15-060 | |
Download: ML15138A105 (19) | |
Text
E PacificGas and ElectricCompany' James M. Welsch Diablo Canyon Power Plant Site Vice President Mail Code 104/6 P. 0. Box 56 May 6, 2015 Avila Beach, CA 93424 805.545.3242 PG&E Letter DCL-15-060 Internal: 691.3242 Fax: 805.545.4884 U.S. Nuclear Regulatory Commission 10 CFR 50.4 ATTN: Document Control Desk 10 CFR 50.54 Washington, DC 20555-0001 10 CFR 50.71 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Power Plant Units 1 and 2 Updated Final Safety Analysis Report, Revision 22
Dear Commissioners and Staff:
Pursuant to 10 CFR 50.71(e), 10 CFR 50.54(a)(3), and 10 CFR 50.4(b)(6), Pacific Gas and Electric Company hereby submits the Diablo Canyon Power Plant (DCPP)
"Final Safety Analysis Report Update" (UFSAR), Revision 22.
As a minimum, DCPP UFSAR, Revision 22, reflects changes made under the provisions of 10 CFR 50.59, Enclosure 1 identifies the 10 CFR 50.59 Evaluations.
There were no changes made to Revision 22 of the DCPP UFSAR as a result of license amendments.
Enclosure 2, Table 1 provides a listing of the revised drawings from UFSAR Table 1.6-1, "Controlled Engineering Drawings." Enclosure 2, Table 2 provides a listing of the new drawings added to UFSAR Table 1.6-1, "Controlled Engineering Drawings." Tables 1 and 2 contain a column titled "Folder" to identify the folder on the compact disc (CD) that contains the corresponding drawing. File A contains drawings that passed the Optical Character Recognition (OCR) and File B contains files that are acceptable but were too large to pass the OCR process.
Enclosure 3 contains DCPP UFSAR, Revision 22, including the new and revised drawings listed in Enclosure 2, on one CD, labeled "Diablo Canyon Power Plant FSAR Update, Revision 22," dated May 2015. The contents are in Adobe Acrobat portable document format.
The CD contains the following files:
File Name File Size (Mb)
DCPP UFSAR, Revision 22.pdf 198 File A 24.7 File B 6.62 A member of the STARS (Strategic Teaming and Resource Sharing) Alliance Callaway
- Diablo Canyon
- Palo Verde - Wolf Creek
Document Control Desk PG&E Letter DCL-15-060 May 6, 2015 Page 2 There are no new or revised regulatory commitments as defined by Nuclear Energy Institute 99-04, "Guidelines for Managing NRC Commitment Changes," dated July 1999, in this submittal.
Ifyou have any questions regarding this submittal, please contact Mr. Philippe Soenen at (805) 545-6984.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on May 6, 2015.
Sincerely, M Welsch Site Vice President bnsm/4540/64082188 Enclosures cc: Diablo Distribution cc/enc: Marc L. Dapas, NRC Region IVAdministrator Thomas R. Hipschman, NRC Senior Resident Inspector Siva P. Lingam, NRR Project Manager A member of the STARS (Strategic Teaming and Resource Sharing) ALLiance Callaway
- Diablo Canyon
- Palo Verde
- Wolf Creek
Enclosure 1 PG&E Letter DCL-1 5-060 Changes Incorporated into the Diablo Canyon Power Plant Final Safety Analysis Report Update, Revision 22 Resulting from 10 CFR 50.59 Evaluations
Enclosure 1 PG&E Letter DCL-15-060 Changes Incorporated into the Diablo Canyon Power Plant Final Safety Analysis Report Update, Revision 22 Resulting from 10 CFR 50.59 Evaluations Number(l) Description 2013-021 Disable (remove from scan) the Unit 1 Thot resistance temperature detector Loop 3 input to the reactor vessel level instrumentation system Train A.
2013-026 DDP, 2 , 1000024907: Update the acceptable air flow rates for the Containment Fan Cooler Units.
2013-029 Change the current licensing basis to describe the square-root-of the-sum-of-squares method and the absolute sum method as alternative acceptable methods for the combination of seismic faulted condition (Double Design Earthquake or Hosgri Earthquake) loads with loss-of-coolant accident loads in the evaluation of ASME Section III, Class 1, Reactor Coolant System components.
2013-030 DDP 1000024947: The temperature response due to a main steam line break (MSLB) in the Turbine Building and in the Auxiliary Building Area L is increased due to implementing a more conservative set of MSLB mass and energy releases and superheated steam effects that are based on the replacement steam generators.
Revised the UFSAR to describe the use of the GOTHIC computer code to perform the compartment temperature response for these areas instead of the PCFLUD code.
2015-002 The activity involves changing the computer program used for the structural analysis of reactor coolant pressure boundary components, structures, and supports, and reactor vessel (RV) internals to ANSYS.
2015-004 Change the current licensing basis to establish 76°F as the design basis outdoor ambient temperatures for Heating, Ventilation, and Air Conditioning, replacing the original design value of 82 0 F and an estimated maximum temperature (representing a "worst case" design condition) of 90°F.
(1) 10 CFR 50.59 Licensing Basis Impact Evaluation Number (2) DDP is the prefix for the SAP Design Change Package number (typical) 1
PG&E Letter DCL-15-060 Enclosure 2 Diablo Canyon Power Plant Final Safety Analysis Report Update, Revision 22 New and Revised Controlled Engineering Drawings UFSAR Table 1.6-1 0
PG&E Letter DCL-15-060 Enclosure 2 Table 1 - Revised Drawings CONTROLLED ENGINEERING DRAWINGS/FSAR UPDATE FIGURES CROSS REFERENCE Figure Sheet Drawing Description Folder 1.2-5 57726-1 Auxiliary, Containment, and Fuel File B Handling Buildings (Units 1 & 2),
Plan at Elevation 115 ft 1.2-7 57724-1 Auxiliary and Containment Buildings File B (Units 1 & 2), Plan at Elevation 85 ft 1.2-8 57723-1 Auxiliary and Containment Buildings File B (Units 1 & 2), Plan at Elevation 73 ft 1.2-9 57722-1 Auxiliary and Containment Buildings File B (Unit 1 & 2), Plan at Elevations 60 and 64 ft 1.2-11 500971-1 Containment & Fuel Handling File B Buildings (Unit 2), Plan at Elevations 85, 91, and 100 ft 1.2-24 57731-1 Containment, Turbine, and Fuel File B Handling Buildings (Unit 1)
Section D-D 1.2-30 500973-1 Turbine, Containment, & Fuel File B Handling Buildings (Unit 2),
Section C-C 3.2-2 4 of 23 108002-5 Piping Schematic - Condensate File A System 3.2-2 6 of 23 108002-6 Piping Schematic - Condensate File A System 3.2-3 1 of 11 102003-3 Piping Schematic - Feedwater File B System 3.2-3 2 of 11 108003-3 Piping Schematic - Feedwater File A System 3.2-3 3 of 11 102003-4 Piping Schematic - Feedwater File A System 3.2-3 4 of 11 108003-4 Piping Schematic - Feedwater File A System 3.2-4 1 of 16 102004-3 Piping Schematic - Turbine Steam File A Supply System 3.2-4 3 of 16 102004-4 Piping Schematic - Turbine Steam File A Supply System ____
3.2-4 5 of 16 102004-5 Piping Schematic - Turbine Steam File A
_Supply System 1
PG&E Letter DCL-15-060 Enclosure 2 Figure Sheet Drawing Description Folder 3.2-4 6 of 16 108004-5 Piping Schematic - Turbine Steam File A Supply System 3.2-4 7 of 16 102004-6 Piping Schematic - Turbine Steam File A Supply System 3.2-4 8 of 16 108004-6 Piping Schematic - Turbine Steam File A Supply System 3.2-4 10 of 16 108004-7 Piping Schematic - Turbine Steam File A Supply System 3.2-5 6 of 12 108005-4 Piping Schematic - Extraction Steam File A and Heater Drip System 3.2-7 1 of 9 102007-3 Piping Schematic - Reactor Coolant File A System 3.2-7 2 of 9 108007-3 Piping Schematic - Reactor Coolant File A System 3.2-7 3 of 9 102007-4 Piping Schematic - Reactor Coolant File B System 3.2-7 4 of 9 108007-4 Piping Schematic - Reactor Coolant File A System 3.2-7 8 of 9 108007-5A Piping Schematic - Reactor Coolant File A System 3.2-8 2 of 34 108008-3 Piping Schematic - Chemical and File A Volume Control System 3.2-8 5 of 34 102008-4 Piping Schematic - Chemical and File A Volume Control System 3.2-8 8 of 34 108008-4B Piping Schematic - Chemical and File A Volume Control System 3.2-8 9 of 34 102008-5 Piping Schematic - Chemical and File A Volume Control System 3.2-8 13 of 34 102008-5B Piping Schematic - Chemical and File A I Volume Control System 3.2-9 2 of 12 108009-3 Piping Schematic - Safety Injection File A System 3.2-9 3 of 12 102009-4 Piping Schematic - Safety Injection File A System 3.2-9 4 of 12 108009-4 Piping Schematic - Safety Injection File A System 3.2-9 5 of 12 102009-5 Piping Schematic - Safety Injection File A System 3.2-9 6 of 12 108009-5 Piping Schematic - Safety Injection File A System 3.2-11 1 of 11 102011-2 Piping Schematic - Nuclear Steam File B Supply Sampling System 3.2-11 2 of 11 108011-2 Piping Schematic - Nuclear Steam File B Supply Sampling System 2
PG&E Letter DCL-15-060 Enclosure 2 Figure Sheet Drawing Description Folder 3.2-13 1 of 3 102013-2 Piping Schematic - Spent Fuel Pool File B Cooling System 3.2-13 2 of 3 108013-2 Piping Schematic - Spent Fuel Pool File B Cooling System 3.2-16 6 of 21 102016-7 Piping Schematic - Makeup Water File A System 3.2-16 7 of 21 102016-8 Piping Schematic - Makeup Water File A System 3.2-16 9 of 21 102016-9A Piping Schematic - Makeup Water File A System 3.2-16 11 of 21 102016-11 Piping Schematic - Makeup Water File A System 3.2-16 14 of 21 102016-16 Piping Schematic- Makeup Water File A System 3.2-16 15 of 21 108016-17 Piping Schematic - Makeup Water File A System 3.2-16 19 of 21 102016-21 Piping Schematic - Makeup Water File A System 3.2-17 5 of 18 102017-5 Piping Schematic - Saltwater File A Systems 3.2-17 7 of 18 102017-6 Piping Schematic - Saltwater File A Systems 3.2-18 13 of 27 102018-7 Piping Schematic - Fire Protection File A Systems 3.2-23 5 of 53 102023-5 Piping Schematic - Ventilation and File A Air Conditioning Systems 3.2-23 6 of 53 108023-5 Piping Schematic - Ventilation and File A Air Conditioning Systems 3.2-26 1 of 5 102026-3 Piping Schematic - Nitrogen and File B Hydrogen System 3.8-47 2 of 3 443204-1 Auxiliary Building, Concrete Outline - File A Plans at El. 85, 100, 115, and 140 ft -
Area L 3.8-65 2 of 2 463987-1 Design Class I Tanks Concrete File A Foundations 3.8-85 515215-1 Safety Related Masonry Walls, File B Auxiliary Bldg 5.5-13 500825-1 Ul: Function Diagram, Reactor- File B Turbine Generator Protection 7.2-1 7 of 36 495844-1 Instrumentation and Control System File A Logic Diagrams 7.2-1 8 of 36 495874-1 Instrumentation and Control System File A Logic Diagrams 3
PG&E Letter DCL-15-060 Enclosure 2 Figure Sheet Drawing Description Folder 7.2-1 29 of 36 495855-1 Instrumentation and Control System File A Logic Diagrams 7.2-1 30 of 36 495885-1 Instrumentation and Control System File A Logic Diagrams 7.2-1 31 of 36 495856-1 Instrumentation and Control System File A Logic Diagrams 7.2-1 32 of 36 495886-1 Instrumentation and Control System File A Logic Diagrams 7.3-14 2 of 2 441301-1 Schematic Diagram - Auxiliary File A Feedwater Motor-Operated Valves 7.3-16 2 of 2 441270-1 Schematic Diagram - Feedwater File A Pump Turbine Control 7.3-17 '1 of 2 437583-1 Schematic Diagram - Motor-Driven File A Auxiliary Feedwater Pumps 7.3-18 2 of 4 455060-1 Schematic Diagram - Auxiliary File A Feedwater Pumps Turbine Control 7.3-26 1 of 2 437592-1 Schematic Diagram - Residual Heat File A Removal Flow Control Valves (2 sheets) 7.3-27 2 of 2 441311-1 Schematic Diagram - Component File B Cooling Water Pumps 7.3-28 2 of 2 441287-1 Schematic Diagram - Auxiliary File A Saltwater Pumps 7.3-29 2 of 2 441312-1 Schematic Diagram - Charging File A Pumps 7.3-30 1 of 8 437596-1 Schematic Diagram - Chemical and File A Volume Control System 7.3-31 3 of 4 441313-1 Schematic Diagram - Containment File A Fan Coolers 7.3-45 1 of 4 437682-1 Schematic Diagram - Chemical and File A Volume Control System Solenoid Valves 7.3-45 2 of 4 437683-1 Schematic Diagram - Chemical and File A Volume Control System Solenoid Valves 7.3-48 1 of 4 437557-1 Schematic Diagram - Generator File A Control 7.3-48 2 of 4 437558-1 Schematic Diagram - Generator File B Control 7.6-1 4 of 6 441241-1 Instrumentation and Control Power File A Supply 4
PG&E Letter DCL-15-060 Enclosure 2 Figure Sheet Drawing Description Folder 7.6-1 5 of 6 445390-1 Instrumentation and Control Power File A Supply 7.6-1 6 of 6 445391-1 Instrumentation and Control Power File B Supply 7.7-24 521123-1 Arrangement of Main Control Board - File B Steam and Turbine (VB3) - Unit 1 8.1-1 502110-1 Plant Single Line Diagram File B 8.2-3 57483-1 General Arrangement 230 kV and File B 500 kV Switchyard 8.2-6 500804-1 Arrangement of 12 kV Startup File B Transformers 8.3-1 1 of 2 437529-1 Single Line Meter and Relay Diagram File B
- Generator, Main, and Auxiliary Transformers, and Excitation 8.3-4 3 of 3 441230-1 Single Line Meter and Relay Diagram File A
-4 kV System (Vital Bus) 8.3-7 1 of 2 437542-1 Single Line Meter and Relay Diagram File A
- 480 V System Bus Section G (Vital Bus) 8.3-7 2 of 2 441238-1 Single Line Meter and Relay Diagram File B
- 480 V System Bus Section G (Vital Bus) 8.3-12 5 of 11 441357-1 Schematic Diagram -4 kV Diesel File A Generators Controls 8.3-13 4 of 7 441355-1 Schematic Diagram - 4 kV Diesel File A Generators and Associated Circuit Breakers 8.3-14 1 of 3 437674-1 Schematic Diagram - 4 kV Diesel File A Generators Auxiliary Motors 8.3-14 2 of 3 441359-1 Schematic Diagram - 4 kV Diesel File A Generators Auxiliary Motors 8.3-16 4 of 6 441286-1 Logic Diagram - Automatic Transfer File A 4 kV Buses F, G, and H 8.3-16 5 of 6 441297-1 Logic Diagram - Automatic Transfer File A 4 kV Buses F, G, and H 8.3-17 1 of 4 437546-1 Class 1E 125 Vdc System (4 Sheets) File A 8.3-17 3 of 4 445075-1 Class 1E 125 Vdc System File A 8.3-17 4 of 4 441240-1 Class 1E 125 Vdc System File A 5
PG&E Letter DCL-15-060 Enclosure 2 Figure Sheet Drawing Description Folder 9.4-8 516103-1 Ventilation System - Inverter Rooms File B and 480 V Switchgear Room in Auxiliary Building 9.5F-1 515562-1 Fire Areas, Turbine Building File B Elevation 85 ft 9.5F-1 1 515572-1 Fire Areas, Auxiliary Building File B Elevation 125 ft 8in., 127 ft 4 in., and 163 ft 4 in.
6
PG&E Letter DCL-15-060 Enclosure 2 Table 2 - New Drawings CONTROLLED ENGINEERING DRAWINGS/FSAR UPDATE FIGURES CROSS REFERENCE Figure Sheet Drawing Description Folder 3.2-2 3A of 23 102002-5A Piping Schematic - Condensate File A System 3.2-2 5A of 23 102002-6A Piping Schematic - Condensate File A System 3.2-2 9A of 23 102002-8A Piping Schematic - Condensate File A System 3.2-2 10A of 23 108002-8A Piping Schematic - Condensate File A System 3.2-2 1 1A of 23 102002-9A Piping Schematic - Condensate File A System 3.2-2 11B of 23 102002-9B Piping Schematic - Condensate File A System 3.2-2 12A of 23 108002-9A Piping Schematic - Condensate File A System 3.2-3 1A of 11 102003-3A Piping Schematic - Feedwater File A System 3.2-3 9 of 11 102003-6 Piping Schematic - Feedwater File A System 3.2-3 10 of 11 108003-6 Piping Schematic - Feedwater File A System 3.2-4 14 of 16 102004-10 Piping Schematic - Turbine File A Steam Supply System 3.2-4 16 of 16 108004-10 Piping Schematic - Turbine File A Steam Supply System 3.2-6 1A of 10 102006-3A Piping Schematic - Auxiliary File A Steam System 3.2-6 2A of 10 102006-3B Piping Schematic - Auxiliary File A Steam System 3.2-7 7A of 9 102007-5B Piping Schematic - Reactor File A Coolant System 3.2-8 1A of 34 102008-3A Piping Schematic - Chemical and File A Volume Control System 3.2-8 1B of 34 102008-3B Piping Schematic - Chemical and File A Volume Control System 3.2-8 1C of 34 102008-3C Piping Schematic - Chemical and File A Volume Control System 7
PG&E Letter DCL-15-060 Enclosure 2 Figure Sheet Drawing Description Folder 3.2-8 7A of 34 102008-4C Piping Schematic - Chemical and File A Volume Control System 3.2-8 7B of 34 1102008-4D Piping Schematic - Chemical and File A Volume Control System 3.2-8 7C of 34 102008-4E Piping Schematic - Chemical and File A Volume Control System 3.2-8 8A of 34 108008-4C Piping Schematic - Chemical and File A Volume Control System 3.2-8 16A of 34 102008-5D Piping Schematic - Chemical and File A Volume Control System 3.2-8 17A of 34 102008-6A Piping Schematic - Chemical and File A Volume Control System 3.2-8 21A of 34 102008-8A Piping Schematic - Chemical and File A Volume Control System 3.2-9 5A of 12 102009-5A Piping Schematic - Safety File A
_Injection System 3.2-9 6A of 12 108009-5A Piping Schematic - Safety File A Injection System 3.2-11 1A of 11 102011-2A Piping Schematic - Nuclear File A Steam Supply Sampling System 3.2-13 1A of 3 102013-2A Piping Schematic - Spent Fuel File A Pool Cooling System 3.2-14 3A of 17 102014-5B Piping Schematic - Component File A Cooling Water System 3.2-15 1A of 14 102015-3A Piping Schematic - Service File A Cooling Water System 3.2-15 2A of 14 108015-3A Piping Schematic - Service File A Cooling Water System 3.2-15 2B of 14 108015-3B Piping Schematic - Service File A Cooling Water System 3.2-15 3A of 14 102015-4A Piping Schematic - Service File A Cooling Water System 3.2-16 lA of'21 108016-1 Piping Schematic - Makeup Water File A System 3.2-16 19A of 21 102016-21A Piping Schematic - Makeup Water File A System 3.2-17 1A of 18 102017-3A Piping Schematic - Saltwater File B Systems 8
PG&E Letter DCL-15-060 Enclosure 2 Figure Sheet Drawing Description Folder 3.2-17 1B of 18 102017-3B Piping Schematic - Saltwater File A Systems 3.2-17 2A of 18 108017-3A Piping Schematic - Saltwater File A Systems 3.2-17 2B of 18 108017-3B Piping Schematic - Saltwater File A Systems 3.2-17 5A of 18 102017-5A Piping Schematic - Saltwater File A Systems 3.2-17 7A of 18 102017-6A Piping Schematic - Saltwater File A Systems 3.2-17 7B of 18 102017-6B Piping Schematic - Saltwater File A Systems 3.2-17 8A of 18 108017-6A Piping Schematic - Saltwater File A Systems 3.2-17 8B of 18 108017-6B Piping Schematic - Saltwater File A Systems 3.2-17 8C of 18 108017-6C Piping Schematic - Saltwater File A Systems 3.2-18 1A of 27 102018-2A Piping Schematic - Fire Protection File A Systems 3.2-18 1B of 27 102018-2B Piping Schematic - Fire Protection File A Systems 3.2-18 4A of 27 108018-3A Piping Schematic - Fire Protection File A Systems 3.2-18 9A of 27 102018-5A Piping Schematic - Fire Protection File A Systems 3.2-18 10A of 27 108018-5A Piping Schematic - Fire Protection File A Systems 3.2-18 11A of 27 102018-6A Piping Schematic - Fire Protection File A Systems 3.2-18 12A of 27 108018-6A Piping Schematic - Fire Protection File A Systems 3.2-18 19 of 27 102018-19 Piping Schematic - Fire Protection File A Systems 3.2-18 20 of 27 102018-20 Piping Schematic - Fire Protection File A Systems 3.2-19 3A of 26 102019-3B Piping Schematic - Liquid File A Radwaste System 3.2-19 4A of 26 108019-3B Piping Schematic - Liquid File A Radwaste System 9
PG&E Letter DCL-15-060 Enclosure 2 Figure Sheet Drawing Description Folder 3.2-19 7A of 26 102019-5A Piping Schematic - Liquid File A Radwaste System 3.2-19 7B of 26 102019-5B Piping Schematic - Liquid File A Radwaste System 3.2-19 7C of 26 102019-5C Piping Schematic - Liquid File A Radwaste System 3.2-19 8A of 26 108019-5A Piping Schematic - Liquid File A Radwaste System 3.2-19 8B of 26 108019-5B Piping Schematic - Liquid File A Radwaste System 3.2-19 11A of 26 102019-6B Piping Schematic - Liquid File A Radwaste System 3.2-19 12A of 26 108019-6B Piping Schematic- Liquid File A Radwaste System 3.2-20 1A of 26 102020-3A Piping Schematic - Lube Oil File A Distribution and Purification System 3.2-20 1B of 26 102020-3B Piping Schematic - Lube Oil File A Distribution and Purification System 3.2-20 2A of 26 108020-3A Piping Schematic - Lube Oil File A Distribution and Purification System 3.2-20 2B of 26 108020-3B Piping Schematic - Lube Oil File A Distribution and Purification System 3.2-20 7A of 26 102020-6A Piping Schematic - Lube Oil File A Distribution and Purification System 3.2-20 7B of 26 102020-6B Piping Schematic - Lube Oil File A Distribution and Purification System 3.2-20 8A of 26 108020-6A Piping Schematic - Lube Oil File A Distribution and Purification System 3.2-20 8B of 26 108020-6B Piping Schematic - Lube Oil File A Distribution and Purification System 3.2-21 3A of 35 102021-3A Piping Schematic - Diesel Engine- File A Generator Systems 10
PG&E Letter DCL-1 5-060 Enclosure 2 Figure Sheet Drawing Description Folder 3.2-21 4A of 35 108021-3A Piping Schematic - Diesel File A Engine-Generator Systems 3.2-21 4B of 35 108021-3B Piping Schematic - Diesel File A Engine-Generator Systems 3.2-21 5A of 35 102021-4A Piping Schematic - Diesel File A Engine-Generator Systems 3.2-21 6A of 35 108021-4A Piping Schematic - Diesel File A Engine-Generator Systems 3.2-21 6B of 35 108021-4B Piping Schematic - Diesel File A Engine-Generator Systems 3.2-21 8A of 35 108021-5A Piping Schematic - Diesel File A Engine-Generator Systems 3.2-21 8B of 35 108021-5B Piping Schematic - Diesel File A Engine-Generator Systems 3.2-21 9A of 35 102021-6A Piping Schematic - Diesel File A Engine-Generator Systems 3.2-21 10A of 35 108021-6A Piping Schematic - Diesel File A Engine-Generator Systems 3.2-21 10B of 35 108021-6B Piping Schematic - Diesel File A Engine-Generator Systems 3.2-21 11A of 35 102021-7A Piping Schematic - Diesel File A Engine-Generator Systems 3.2-21 11B of 35 102021-7B Piping Schematic - Diesel File A Engine-Generator Systems 3.2-21 12A of 35 108021-7A Piping Schematic - Diesel File A Engine-Generator Systems 3.2-21 12B of 35 108021-7B Piping Schematic - Diesel File A Engine-Generator Systems 3.2-21 14A of 35 108021-8A Piping Schematic - Diesel File A Engine-Generator Systems 3.2-21 14B of 35 108021-8B Piping Schematic - Diesel File A Engine-Generator Systems 3.2-21 16A of 35 108021-9A Piping Schematic - Diesel File A Engine-Generator Systems 3.2-21 16B of 35 108021-9B Piping Schematic - Diesel File A Engine-Generator Systems 3.2-22 7A of 16 102022-5A Piping Schematic - Turbine and File A Generator-Associated Systems 3.2-22 8A of 16 108022-5A Piping Schematic - Turbine and File A Generator-Associated Systems 11
PG&E Letter DCL-15-060 Enclosure 2 Figure Sheet Drawing Description Folder 3.2-22 9A of 16 102022-6A Piping Schematic - Turbine and File A Generator-Associated Systems 3.2-22 10A of 16 108022-6A Piping Schematic - Turbine and File A Generator-Associated Systems 3.2-23 7A of 53 102023-6A Piping Schematic - Ventilation File A and Air Conditioning Systems 3.2-23 7B of 53 102023-6B Piping Schematic - Ventilation File A and Air Conditioning Systems 3.2-23 8A of 53 108023-6A Piping Schematic - Ventilation File A and Air Conditioning Systems 3.2-23 13A of 53 102023-9A Piping Schematic - Ventilation File A and Air Conditioning Systems 3.2-23 21A of 53 102023-13A Piping Schematic - Ventilation File A and Air Conditioning Systems 3.2-23 24A of 53 108023-15 Piping Schematic - Ventilation File A and Air Conditioning Systems 3.2-23 25A of 53 108023-16 Piping Schematic - Ventilation File A and Air Conditioning Systems 3.2-23 26C of 53 102023-17C Piping Schematic - Ventilation File A and Air Conditioning Systems 3.2-23 26D of 53 108023-17 Piping Schematic - Ventilation File A and Air Conditioning Systems 3.2-23 29A of 53 102023-18A Piping Schematic - Ventilation File A and Air Conditioning Systems 3.2-23 29B of 53 102023-18B Piping Schematic - Ventilation File A and Air Conditioning Systems 3.2-23 29C of 53 102023-18C Piping Schematic - Ventilation File A and Air Conditioning Systems 3.2-23 29D of 53 102023-18D Piping Schematic - Ventilation File A and Air Conditioning Systems 3.2-23 29E of 53 102023-18E Piping Schematic - Ventilation File A and Air Conditioning Systems 3.2-23 29F of 53 102023-18F Piping Schematic - Ventilation File A and Air Conditioning Systems 3.2-23 30A of 53 108023-18A Piping Schematic - Ventilation File A and Air Conditioning Systems 3.2-23 30B of 53 108023-18B Piping Schematic - Ventilation File A and Air Conditioning Systems 12
PG&E Letter DCL-15-060 Enclosure 2 Figure Sheet Drawing Description Folder 3.2-23 30C of 53 108023-18C Piping Schematic - Ventilation File A and Air Conditioning Systems 3.2-23 30D of 53 108023-19 Piping Schematic - Ventilation File A and Air Conditioning Systems 3.2-25 1A of 13 102025-3A Piping Schematic - Compressed File A Air System 3.2-25 3A of 13 102025-4A Piping Schematic - Compressed File A Air System 3.2-25 8A of 13 102025-8 Piping Schematic - Compressed File A Air System 3.2-25 9 of 13 108025-8 Piping Schematic - Compressed File A Air System 3.2-25 3A of 13 102025-4A Piping Schematic - Compressed File A Air System 3.2-26 1A of 5 102026-3A Piping Schematic - Nitrogen and File A Hydrogen System 13
PG&E Letter DCL-15-060 Enclosure 3 Compact Disc, Diablo Canyon Power Plant Final Safety Analysis Report Update, Revision 22 K."
. , . , ., ,,. .. T7