DCL-10-029, Retraction of Emergency License Amendment Request 10-02 One Time Revision to Technical Specification 3.8.1, AC Sources - Operating.

From kanterella
(Redirected from DCL-10-029)
Jump to navigation Jump to search

Retraction of Emergency License Amendment Request 10-02 One Time Revision to Technical Specification 3.8.1, AC Sources - Operating.
ML100750659
Person / Time
Site: Diablo Canyon  
Issue date: 03/12/2010
From: Becker J
Pacific Gas & Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
DCL-10-029
Download: ML100750659 (1)


Text

Pacific Gas and Electric CompanyJames R. Becker Site Vice President Diablo Canyon Power Plant Mail Code 104/5/601 P 0. Box 56 Avila Beach, CA 93424 805.545.3462 Internal:

691.3462 Fax: 805.545.6445 March 12, 2010 PG&E Letter DCL-10-029 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Docket No. 50-275, OL-DPR-80 Docket No. 50-323, OL-DPR-82 Diablo Canyon Units 1 and 2 Retraction of Emergency License Amendment Request 10-02 One Time Revision to Technical Specification 3.8.1, "AC Sources -Operating" On March 11, 2010, PG&E submitted Emergency License Amendment Request 10-02, One Time Revision to Technical Specification 3.8.1, "AC Sources -Operating." The license amendment request (LAR) was submitted in anticipation of requiring more than the allowed 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to implement modifications associated with the discovery of a nonconservative technical specification (TS). At approximately 13:45, on March 12, 2010, following modifications, operators exited TS Action 3.8.1.Therefore, PG&E is no longer requesting an emergency license amendment and hereby retracts emergency LAR 10-02.PG&E makes no regulatory commitments (as defined by NEI 99-04) in this letter.This letter includes no revisions to existing regulatory commitments.

If you have any questions or require additional information, please contact Mr. Tom Baldwin at (805) 545-4720.IMP1/3386/N50301167 Enclosure cc: Gary W. Butner, California Department of Public Health Elmo E. Collins, NRC Region IV Michael S. Peck, NRC, Senior Resident Inspector Alan B. Wang, NRC Project Manager, Office of NRR Diablo Distribution